




免费预览已结束,剩余12页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
requirements on painting and rust-proof of product and its metal parts and componentsq/hf6401-2008 共 1/17 1/10no. of the bottom drawingno. of the old bottom drawingdatesignfile no.mark no.marksigndatedatesignfile no.mark no.markdatesignfile no.mark no.mark1. scopethis standard is applicable to the requirements on painting and rust-proof of water-turbine engine, water turbine generator, steam turbine generator and their metal parts and components.this standard is applicable to product in general domestic climatic conditions or product in humid tropics or product to be exported.2. normative referencethe following normative documents contain provision which, through reference in this text, constitute provisions of this national standard. for dated reference, subsequent amendments (excluding correction) to, or revisions of, any of these publications do not apply. however, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. for undated references, the latest edition of the normative document referred to applies.gb8923 rust and antirust grades on steel surface before application of paintgb/13288the assessment of profile grades of steel surface before application of paint (related products - comparator)gb/t3181color standard for paint film iso 14726-1shipping and sailing, the identify colour of pipeline system capacity main colour and medium3. requirements3.1the supplier of work blank should clean the metal surface before paint on casting and weld assembly (primarily carry out heat treatment on blank if necessary, then clean it). after removing the oil, rust and dirt on the surface of work piece, carry out primer treatment. the rest painting should be finished in the workshop(include primer total thickness reach the request of table 2-1 and 2-2 ); the supplier of work finished should paint the every parts of workpiece except topcoat.3.2quality management departments should verify each painting procedure strictly in accordance with specified time (except for the ones specified by contract) from relative standard (this standard included). only when it is measured up can do the next working procedure in the workshop. after pretreatment the unqualified should not be painted or mechanical-processing; after painting the unqualified should not be assembled or binninged.3.3technology engineers should work out the painting technology according to the drafts and the technology requirements of this standard. painting workers must operate according to technology standard.only when the lacquer is dry can examiners do the packing-up test.3.5should customers request arbitration on painting quality in doubt, relative national standard arbitrament from “normative reference” can be adopted, or arbitrate through negotiation of both parties therein, or other applicable standard.4. marking drawings4.1 on the design drafts,for the general products needed painting,designers must mark “painting according to q/hf 6401-2008”on the technical requirements of related drafts, with the exception of special requirements. 4.2 on the design drafts,for the same surface of the same parts contacting with different working environments(spiral, draft tube, box of hydraulic turbine generator imbed parts and the bottom plate of generator ),draw the painting diagrammatic sketch on the proper position and mark the types of working environment (symbols according to table 1)and the size. for example:the symbol of hydraulic turbine generator draft tube surface contacting with concrete is pc, when contacting with air the symbol is pa, according to picture 1. 图1 table1 the provision of working environment types and symbols for the painting products and metal partsno.operation environment typessymbol1surface contacting with airpa1pa62surface contacting with oilpo3surface contacting with waterpw1pw24surface contacting with concretepc5welding groove of work sitepg6unassembled non-coating fitting surfacepf1pf37electroplating surfacepe8stainless steel surfaceps4.3 priority flag choice for painting surface:assembled surface have priority to the surface contacting with medium,such as top cover and bottom ring antiwear board flowing surface .at one side surface contacting with the end surfaces of guide blade,at the other side it contacting with mechanical-processing surface and contacting with water .top cover and bottom ring antiwear board flowing surface should be considered as concerting surface.5. the technical requirements of rust-proof and painting5.1 all the surface of non-processing parts generally should be painted, with the exception of special requirements.5.2 when there are oil, heat and other special requirements ,should use the appropriate paint materials.5.3 surface requirements before parts painted.5.3.1 must remove the deadhead, fins, bulges of metal parts and components. non-processing surface should not have burr and acute sides. 5.3.2 casting to clean the sand and oxide, weld parts to remove wildings slag, flying, oxide etc. 5.3.3 rust removing can be shot blasting, handwork and power tools etc.for non-processing surface contacting with oil ,all the roughcast of sets in humid tropics or to be exported, welding roughcast of sets in humid tropics to be exported, use the shot blasting treatment:steam-turbine generator:stator frame、the baseplate of high baseplate set;hydraulic turbine generator: vertical hydraulic turbine generator:upper bracket、frame、upper shield;horizontal hydraulic turbine generator:frame、inner(outer)head cover、base plate;hydraulic turbine:vertical hydraulic turbine :water inlet、spiral、draft tube cone、draft tube elbow etc. flowing surface,top cover、regulating ring、support of bearing、bearing cover;horizontal hydraulic turbine :the flowing surface of water inlet 、spiral、draft tube cone、draft tube bend 、top cover、bottom、regulating ring、sealing cowling、bearing cover、guide vane lever etc.after shot blasting treatment, some parts, which still did not reach the standard, needed treating again with various tools.the metal parts and components, which are not treated with shot blasting, should be cleaned with grinding wheel, emery cloth, wire brush etc.clean the bottom with shot blasting to the cleanness of sa 2.5 grade, compare with picture according to requirements of 3.2 in gb8923-88. which using handwork or power tools to grind should reach the cleanness of st 2 grade, compare with the picture according to requirements of 3.3 in gb892-88. after removing the rust the roughness of metal surface should ensure to ry=4070m, assess according to gb/t132885.3.4 purge residual rust dust carefully with compressed air, clean the dirty part with solvent. clean the oil and water by packing cloth.5.3.5 when the surface is cleaned and passed inspection, paint the supporting primer after shot blasting treatment immediately, the working piece should be finished within 24 hours or 12 hours in humidity air.5.3.6 after cleaned , the metal parts and components of sets in humid tropics or to be exported must be painted with phosphating primer, concerting with the rust-proof primer.5.3.7 if adopt acid cleaning to remove the rust of steel parts and components, the welding spatter must be removed completely before acid cleaning; after acid cleaning, use fresh water clean again, together with lye and hot water.5.3.8 for the aluminum parts and aluminum alloy operating in outdoor or under extreme condition, anodic oxidation treatment should be carried out , or paint etching primer .5.3.9 for the casting metal and weld assembly to go through heat treatment, the specified paint should be after the heat treatment.5.4 the painting requirements of parts5.4.1 primer is the base of paint coat, which can not only act for antirust of metal, but also add adhesive force to top coat. thus the primer with high corrosion resistance and greater adhesive force can be chosen; primer can be painted one or two coats depending on used environmental conditions and specific operation requirements. each coat should be painted thin and even, with the work piece covered completely, and the procedure of drying should be carried out strictly in compliance with specified time. spraying, brushing, and impregnation can be used while priming. phosphating primer can only be coated once, and act as the undercoat of other primers, after having be painted with phosphating primer for 2 hours under 25c, must paint the rust-proof primer which match with it .the time for drying phosphating primer is less than 30 minutes under 25c. the time for drying 704 inorganic silicate zinc primer is 1 hour under 25c. the rests are 24 hours under 25c.5.4.2 putty can improve the appearance of paint coat, which will not decrease its mechanical strength or protective capability. putty should not be used or should be used as less as possible. in order to keep corrosion prevention of paint coat, putty should be made as thin as possible, which then should be polished smooth after drying for specified time, then paint primer. in order to ensure the corrosion prevention and mechanical strength, use the epoxy ester putty. drying time is 24 hours below 25c.5.4.3 coat number of topcoat should be chosen in accordance with environmental conditions and requirements on ornamental of product or parts. topcoat can only be made after the primer being dry completely. topcoat should be even, clean, smooth and gloss with the color homogeneous and surface pleasant to eyes, and there should not be any default of wrinkle, flow mark, pinhole or blister. each topcoat should cover last paint coat completely (primer, putty or top coat). in order to obtain several coats of especially firm paint film, each coat should be polished smooth, which must begin after the surface being dry completely. after the surface being polished, no visible primer should be seen. drying temperature of top coat is 25 , and drying time is 18 hours.5.4.4 painting should be done in clean, dry, well-ventilated, and the temperature should less than 5c, the relative humidity should below 70c. the necessary measures should be taken to ensure the quality of painting in the freezing cold, sun exposure, wind, rain, now and other bad weather. otherwise nothing should be done.5.4.5 compressed air must not consist of moisture or oil trace while spraying; oil separator must be used to remove moisture and oil trace from the air.5.4.6 while painting stove lacquer on the cast aluminum alloy, after cleaning the oil spots on the surface with nitro dilution, for example gas, the cast aluminum alloy should be put into the baking oven (150-200) c for 1h to 2h, (drying time depending on the size of work piece), or other dry treatment, then paint h06-2 iron oxide zinc yellow epoxy ester primer as soon as possible. 5.4.7 when the surface is not easy or can not be painted after components is assembled. it should be painted before assembled.5.4.8 coatings should be protected from dirt or injury before the paint is completely dry.5.4.9 two different colour of paint phase grounding, the limits must be clear and tidy.5.4.10 two parts which need often to demolish,the painting coat of its junction must be smooth,the joints should be obvious. can not fall of or paint together. 5.4.11 the colour of surface coating on each floor should be a slight different in order to identity. the last topcoat should be painted after qualified test (when the product is not packed the last topcoat should be painted before shipping)5.1.12 in the installation or during transport, the surface coating of parting partial in juried. it should be (at the request of the original coating) repaired. 6. painting system choose the choice for painting and rust-proof system of steam-turbine generator and their metal parts and components in general climatic condition or in humid tropics home and steam-turbine generator to be exported according to table 2-1.the choice for painting and rust-proof system of hydraulic generator set and their metal parts and components in general climatic condition or in humid tropics home and hydraulic generator set to be exported according to table 2-2. requirements on painting and rust-proof of product and its metal parts and componentsq/hf6401-2008第 共 17/17 14/10no. of the bottomno. of the old bottomdatesignno. of profileno. of markmarksigndatedatesignno. of profileno. of marksmarkdatesignino. of profile n of miarmarktable 2-1painting and rust-proof system of steam-turbine generator and their metal parts and components in general climatic condition or in humid tropics home and steam-turbine generator to be exportedno.operation environmenttype application scopespartsmaterialpretreatmentpaint treatment remark1surface contacting with oilponon-processing bear inner surfaceiron1.use dissolvent to remove oil spots and grease on surface.2.use shot blasting to remove rust scale and other foreign matter on surface.sand blasting grade:sa2.5 grade,roughness:ry=4070m1. paint x06-1 ethene phosphating primer 10m2. paint h06-2 epoxy iron red shop 25m3. c54-31 creamy yellow hydroxy acid oil resisting paint two coats of 60mthe surface of lacquer coat should be dry at least 2 days before oil can be loaded. 2surface contacting with airpaithe outer non-processing surface of motionless and visible parts in door:such as frame, top cover, the outer surface of bearing(except base plate) etc.ironsteel1. use dissolvent to remove oil spots and grease on surface.2.remove rust scale and other foreign matter on surface by the way of 5.3.3for the domestic sets in general climatic conditions:1.paint c06-1 iron oxide red alkyd primer,two coats: 50m2.paint c04-2 alkyd enamel, two coats: 50mfor the sets in humid tropics or export:1. paint x06-1 ethene phosphating primer,one coat:10m.2. paint h06-2 epoxy ironred shop primer, two coats: 50m.3. paint c04-2 alkyd enamel, two coats: 50m.1.scrape the putty on outer surface of visible part above workshop level if necessary (for example two end caps), using h07-5 epoxy putty, two coats, total thickness:700m;2.coat primer use ral colour code cards and iso14726-1 standard3. color of top coat according to contract or traffic blue, colourcode is ral5017table2-1 (continued)no.operation environmenttype application scopespartsmaterialpretreatmentpaint treatmentremark3surface contacting with airpa2the inner non-processing surface of motionless and visible parts in door:frame、the inner surface of top cover etc.;the non-processing surface of hidden motionless parts:windshield etc. the side face of high base plate(except contacting with concrete)。steeliron, aluminum(notes: 4)1.use dissolvent to remove oil spots and grease on surface.2.remove rust scale and other foreign matter on surface by the way of 5.3.3.for the domestic sets in general climatic conditions:1.paint c06-1 iron oxide red alkyd primer,one coat : 35m.for the sets in humid tropics or export:1. paint x06-1 ethene phosphating primer,one coat :10m2.paint h06-2 epoxy iron red shop primer, one coat : 35m.4surface contacting with airpa3the non-concerting surface of the products running parts:blade、shaft coupling such marking surfaces(except the outer surface of rotor)。steeliron1.use dissolvent to remove oil spots and grease on surface.2.remove rust scale and other foreign matter on surface by the way of 5.3.3for the domestic sets in general climatic conditions:1. paint c06-1 iron oxide red alkyd primer,one coat : 35m.2.paint c04-2 alkyd enamel, one coat:35mfor the sets in humid tropics or export:1. paint x06-1 ethene phosphating primer, onecoat :10m.2. paint h06-2 epoxy ironred shop primer, one coat :35m.3. paint c04-2 alkydenamel, one coat :35m.color of top coat: according to contract or redtable 2-1 (continued)no.operation environmenttype application scopespartsmaterialpretreatmentpaint varietycoat no.remark5surface contacting with airpa4parts needing insulation: the outer surface of rotor, the inner surface of stator windings endsclean the surface paint 8037 epoxy iron red shop coating varnish, one coat: 20m.6surface contacting with air pa5the outer surface end copperplate wirecopperclean the surface with solventtinfoil 20min order to ensure conductivity, do not paint. each phase are a symbol tag7surface contacting with air pa6no painting required machining surfacesteelironclean the surface with solventpaint 2# soft coat anti-rust oil or 907 cold painting anticorrosive grease8unassembled non-coating fitting surface pf2revolution axis axle neck, collector ring, bearing bush etc.steelclean the surface with solvent1.paint 907 cold painting anticorrosive grease2.pack with 11# gas phase antirust paper one coat3.pack with white cloth tape one coat9unassembled non-coating fitting surface pf3antirust protection during machine finishing surface procedure and storage and shippingsteelironclean the surface with solventpaint 2# soft coat anti-rust oil or 907 cold painting anticorrosive grease10stainless steel surfacepeelectroplating surf
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年农业用地长期租赁合同样本
- 2025年已签订解除劳动合同是否还需开具离职证明
- 管理理论萌芽时期
- 护理风险防范意识
- 河南省TOP20二十名校2024-2025学年高二下学期5月调研考试历史试卷
- 2025年贵州省贵阳市青岩贵璜中学中考一模数学试题
- 2025年年财务管理试题及答案
- 2024年-2025年学年度第二学期小班德育工作总结模版
- 煤矿安全生产活动月工作总结模版
- 湖南省部分学校2024-2025学年高二下学期4月期中联考生物试题 含解析
- CJJ 36-2016 城镇道路养护技术规范
- 直臂式高空作业车安全管理培训课件-
- 之江实验室:生成式大模型安全与隐私白皮书
- 灵芝孢子油的作用
- 免疫组织化学检验技术(免疫学检验课件)
- 世界文明史学习通课后章节答案期末考试题库2023年
- 某石料厂年产10万吨石灰岩开采建设项目可行性研究报告
- 养老院安全工作会议记录范本
- DB21∕T 3275-2020 企业安全风险分级管控和隐患排查治理通则
- 胸腔镜下肺癌根治的手术配合
- 护理查房肺结核护理查房
评论
0/150
提交评论