PT NWPCI CONSORTIUM WIKA-CHENGDA PT PLNPLTU KALIMANTAN SELATAN 2*6MW锅炉大板梁吊装方案Erection Procedure of Boiler Plate Beam1. PurposeThis procedure is to provide an available plan and ensure a smooth installation for boiler plate beam installation.2. Basis2.1 Drawings and documents from SHANDONG YANGGUANG2.2 Drawings and document form JINAN Boiler Group Co.ltd.2.3 Field Inspection and Test Plan issued by client.3Content and work quantity3.1本工程锅炉钢架由山东济南锅炉厂设计制造,采用与厂房分离的独立式布置,钢架构架宽17800.0 深 23150.0 高 41200.0 从炉前到炉后共布置4条轴线,炉左向炉右布置4条轴线。3.2锅炉钢结构到顶并与辅柱,横梁,次梁连接形成框架结构,钢结构整体找正验收合格,高强螺栓紧固完毕,方可进行大板梁的吊装。3.1 The boiler structure is manufactured by JINAN Boiler co.Ltd, it is individual from main house. The width of boiler structure is 17800mm, depth 23150mm, height 41200mm. There are four axis from boiler front to boiler rear, and from boiler left to boiler right respectively. 3.2 The top end of boiler steel structure form a frame with assistant column, horizontal beam and lateral support. After alignment and acceptance of entire boiler structure, and finshed tightening high strength bolts, the plate beam can be erected.锅炉大板梁的规格尺寸Type and specifications of boiler plate beamNoDWG NoComponents No.QTYSPECIFICATION/mmSIZE/LWH(mm)weight/kg164606-2-1-0MB-11H1400x450x30x2014500x450x14007233.4264606-2-2-0MB-21H2100x500x30x2014500x500x210010321.8364606-2-3-0MB-31H2500x650x40x3014500x650x250016934.2464606-2-4-0MB-41H1800x500x25x2014500x500x18008836.0大板梁吊装所需的工器具 Equipments and tools needed for plate beam installation4 安装前应具备的条件Conditions to be finished before erection4.1锅炉第四层钢结构施工完成验收合格; Finished 4th S/S installation and acceptance.4.2锅炉炉膛内从#3炉电除尘场场区地回填并压实; The field from #3 boiler proper to #3 ESP area is backfilled and compacted. 4.3运输大板梁及吊车行走道路通畅; No barrier on the access for transportation and erection equipments.5 工作流程及相关文件 Flow chart and relative documents 5.1大板梁吊装选用180T履带吊,采用主臂式工况,主臂长度54.9m作业半径1216米,单独完成吊装,吊装半径依据大板梁的重量而定。A 180t crawler crane is applied to erect plate beam. The length of main beam is 54.9m, working radius 1216m. The erection radius is dependent on the weight of plate beam.5.2吊装钢丝绳的选用:The application of slings:根据大板梁的规格,尺寸重量,安装高度,吊点位置,确定钢丝绳的直径,钢丝绳的长度。 大板梁64606-2-1- 0,选用28钢丝绳,长度15。4个大板梁使用同一对钢丝绳吊装。5.3吊点选择及绑扎方法: Confirm the diameter and length of sling in accordance with specification, size, weight, height, and location of plate beam. Apply 15m of 28cm sling to erect plate beam(DWG No 64606-2-1-0). The four plate beam will be erected with the same sling.选择吊点要根据大板梁的重量,重心,外形尺寸,及空间的安装位置,进行吊点选择,大板梁的吊点选择,首先找出大板梁的中心点,左右两侧1.52.5即大板梁吊点。捆绑方法,一对钢丝绳两头打空圈兜吊,或者使用U型卡环捆绑,两点起吊均可,不管采用何种捆绑方法,都必须保证设备不变形。绑绳处有棱角,要用软物或半圆管垫好。 Choose a erecting point in accordance with the weight, center of gravity, shape, size and installation location. Firstly find out the center of plate beam, 1.52.5 from the two ends is the erecting point of plate beam. Fastening method: a pair of sling fixed with U clamp and erect material simultaneously at two ends. No matter what kind of method is applied, it must guarantee that there is no distortion of the plate beam. If there is any edges and corners at the fastened location, use some soft material or semi-circular pipe to underlay. 5.4 依次吊装提前预放在钢架内的64606-2-1-0,64606-2-2-0,大板梁。首先将大板梁吊起离地面大约200,停止起吊,然后快速落钩紧急停止,观看制动刹车是否灵活有效。并在离地面200之处停留35分钟,确认没问题后开始起吊。起吊时应在大板梁两端绑一麻绳作为遛绳,防止大板梁在起吊过程中,碰撞立柱或横梁。大板梁就位后应检查大板梁的中心线,水平标高,检测合格后方可落钩。按同一步骤,方法,吊装-2大板梁。Erect plate beam (DWG No.64606-2-1-0 & 64606-2-2-0) which is loaded under boiler steel structure respectively. Firstly lift up plate beam for 200cm, hold on, then low down the hook and stop to see the brake is agility or not. Hold on for 3-5 mins at 200cm up of ground, and start to erect after confirmation. Tie control rope at each end of plate beam so as to avoid hitting column of horizontal beam during erection. Examine the center line and elevation of plate beam, and loose the hook after all parameters are qualified. Then erect the other plate beam with the same method.5.5在BM-2大板梁就位后,须将BM-1和BM-2大板梁之间连接横梁吊装完毕后,再吊装64606-2-3-0大板梁。连接BM-2BM-3之间横梁,依次顺序吊装至BM-4。After the positioning of BM-2 plate beam, connect all the horizontal beams between BM-1 & BM-2. Then erect plate beam of 64606-2-3-0. Connect horizontal beams between BM-2 & BM-3, until BM-4.5.6履带吊吊装大板梁站位示意图Sketch map for plate beam positioning with crawler crane6 组织机构及人力资源Organization and Manpower现场经理site manager陈富安 ChenFuan 负责人Boiler chief 王飞 Wang Fei吊装负责人ifting engineer郭继民Guo Jimin钢结构负责人S/S engineer曹军平Cao junping焊接负责人Welding engineer邢建钢Xing Jiangang材料负责人Materical engineer 王滕Wang Teng起重工4人 rigger 4当地4人Local worker 4钢结构安装工16人Erection worker 16,当地10人local worker 10焊工6人 welder 6当地4人 local worker 4材料工2人helper 2当地2人local worker 2 inspection record of sole platerefers to attachment 37.工具和材料Tools and equipments No.NameType & specification QTY1Crawler crane 180T1 set2Mobile crane 35T1 set3Sling 28 L=15m1 pair4U clamp 10T4 pc5Hemp rope21100m6Chain clock 5T2 pc7Chain clock 3T2 pc8Sling 17 L=5m4 pc8 安全环境 Safety and Environment 8.1吊装前需进行安全和技术交底,施工人员必须做到四个明确,即吊装任务明确,施工方法明确,吊物的重量及吊装过程明确,安全注意事项明确Before erection, perform teach-know-how about safety and technique, and construction staff must be clear about erection work and method, be clear about the weight of erected material and erection process, and be clear with the safety cautions.8.2保持良好的施工环境,材料,设备的堆放要符合施工及消防的要求,摆放,整齐有序,不妨碍通行。Keep a good environment for construction, and the storage of material and equipment should meet the fire-fighting requirement, e.g. put in order and not block the access. 8.3遵守各项规章制度,提倡文明施工,杜绝野蛮施工。Follow the regulations of constructions, avoid uncivilized construction.8.4起吊作业区域,严禁非施工人员通过或逗留。The person beyond construction staff is forbidde
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 施工队伍工期奖惩制度
- 乡综合调解室调解制度
- 教师大课留生率奖惩制度
- 生产车间防冻凝奖惩制度
- 反恐安保考核与奖惩制度
- 一级物业保洁奖惩制度
- 教培招生团队奖惩制度
- 安徽省企业奖惩制度细则
- 卫生管理制度奖惩制度
- 系统集成施工奖惩制度
- 五年级数学下册期末真题卷(人教版成都锦江区)
- 培训学校理事会监督制度
- 2026年中煤一局集团有限公司招聘备考题库及一套完整答案详解
- (2025年)机械操作手安全培训试题及答案
- 汽车制造焊接工艺技术规范
- 泸州泸天化化工园区总体规划(2022-2035)
- 2025年国家统一司法考试真题及答案
- 2025年黑龙江生态工程职业学院单招职业倾向性测试模拟测试卷附答案解析
- 易考优课件教学课件
- 人流室感染控制措施
- 风电项目安全生产实施计划书
评论
0/150
提交评论