软件工程题库2.doc_第1页
软件工程题库2.doc_第2页
软件工程题库2.doc_第3页
软件工程题库2.doc_第4页
软件工程题库2.doc_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

The Software Process 1. During which phase of the software project management life cycle should testing occur? A. integration B. validation C. implementation D. maintenance E. testing occurs during each phase. 2. Why should each phase be fully documented before the next phase begins? A. The pressures to deliver the product on time are such that postponed documentation may never be delivered. B. The individual responsible for an early phase may not be available by the time that the documentation needs to be produced. C. A product is constantly changing during development. Until the changes are documented, modifications will be difficult to achieve. D. The question is incorrect. Documentation should be left under the product is finalised and is a specialised subject best left to expert technical writers. E. Postponed documentation may never be delivered, the individual responsible may have left later in the project and the fact that the product is constantly changing are all reasons why each phase should be fully documented before the next phase begins. 3. At which stage of the products life cycle should documentation be produced? A. testing, as it is only here that the technical writers can see what has been built and document it. B. maintenance, as this is the first phase when it is required in order to fix faults or make enhancements. C. specification, as it is needed to produce test cases for acceptance testing. D. at no stage, the use of modern techniques such as extreme testing obviates the need for any documentation E. throughout the project F. documentation phase 4. The individual or organisation who wants a product to be developed is known as the: A. developer B. user C. contractor D. initiator E. client 5. The members of the organisation responsible for building that product are known as the: A. developers B. users C. contractors D. initiators E. clients 6. One method of getting around the problem of the developers and clients visualising a piece of software and its functionality is to build a rapid prototype. What may be omitted from the prototype? A. its user interface B. requirements details C. functionality D. any of these may be omitted from the prototype E. file updating or error handling 7. The name of the organisation responsible for ensuring that the product delivered is what the client ordered is the: A. development team B. test team C. documentation department D. end-user group E. software quality assurance group 8. Which of the following items should not be included in the software project management plan? A. the techniques and case tools to be used B. detailed schedules, budgets and resource allocations C. the life cycle model to be used D. the organisational structure of the development organisation, project responsibilities, managerial objectives and priorities E. all of these aspects should be included 9. If a specification statement is to be testable then it one of the properties it must have is: A. tenacity B. probity C. longevity D. verifiability E. traceability 10. A fault to look for during testing of the products design is: A. logic fault B. interface fault C. lack of exception handling D. non-conformance to specifications E. all of theses are examples of faults to look for during testing of the products design. 11. Why is it necessary to carry out acceptance testing? A. The test group may not be competent enough. B. To receive the final payment for the completed product. C. Over 50% of the faults are found at the acceptance test phase. D. It is not until this stage of the testing that the system as a whole (hardware and software) is exercised. E. The users may use a combination of functions and data that are not anticipated by the developers. 12. The final form of testing COTS software is _ testing. A. unit B. integration C. alpha D. module E. beta 13. More time and money is spent in the _ phase than any other phase. A. requirements B. specification C. implementation D. integration E. maintenance 14. In the maintenance phase the product must be tested against previous test cases. This is known as _ testing. A. unit B. integration C. regression D. module E. beta 15. According to Brooks No Silver Bullet 1986, which aspect of software production is inherently difficult? A. complexity B. conformity C. changeability D. invisibility E. all of these 16. A major problem with the essence of software is that it is invisible and unvisual (Brooks, 1986). Visualisations such as flowcharts and data flow diagrams are extremely useful and powerful ways of visualising certain aspects of the product. What is the problem with the use of such diagrams?A. There is no standard agreed notation for each of the diagrams. B. Programming is an art and not an engineering science. Thus only an abstract diagram can capture the models semantics and such diagrams are subject to personal interpretation. C. Software is three-dimensional and only a few specialised systems can depict three-dimensional diagrams. D. Visualisations are not an effective means of communicating with clients and other software engineers. E. Such diagrams cannot embody every aspect of the product, nor is there a way of determining what is missing from any one visual representation of the product. 17. According to Brooks (1986) which approach is capable of achieving an order of magnitude improvement in software development p

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论