已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Development Interface Agreement - DIAPart/material No.Part/material nameAuthorStatusDocument No.Project NoProject nameOwnerDoc typeDoc partVersionProduct groupCustomerDocument descriptionDevelopment Interface Agreement - DIA1 Table of Contents1Table of Contents22Revision History33Introduction43.1General overview43.2About this document43.3Abbreviations44References65Background to DIA76Reference to NDA77Processes78Work Products79Responsibilities810Interfaces810.1Milestones911Combined activities911.1Combined confirmation reviews911.2Planning of Safety Assessments912Communication913Responsibilities after SOP92 Revision HistoryVersionECN no.Changed byChange from last version01The change history shall be a detailed enough description of what sections that have been changed since the last version. Depending on the changes that have been made it may be necessary to describe the changes more in detail.Blue text in italic is information/explanation directed to the issuer of the document.Before releasing the Work Product (document) all blue italic text must be removed.Mark unused sections of this document as “NOT APPLICABLE”, do not remove the paragraph heading.Text marked with a is to be replaced by something specific. This shall be used if there are specific keywords within standardized paragraphs that shall be replaced when creating the Work Product from the template.3 Introduction3.1 General overviewThis section shall contain a brief description of the background of and/or reason for this development project.Describe briefly the system being developed. If the product/item developed at this level is part of a system, also briefly describe the products relationship to the system.3.2 About this documentThis Development Interface Agreement (DIA) applies to the development work carried out for the above stated development project where the system contains software (Automotive Spice) and/or requirements regarding functional safety (ISO 26262).The DIA is a bilateral contract determining each partys interfaces and responsibilities.The parties this DIA applies to are:XXXX Automotive (named “XXXA” hereafter)andThis DIA shall be put under configuration control and updated if necessary during the course of the development project.For further information and recommendation of how to set up this DIA please refer to ISO 26262-8: AbbreviationsAbbreviationXXXAXXXX AutomotiveN/ANot ApplicableTBCTo Be ConfirmedTBDTo Be Defined4 ReferencesRefIdIssueDocument NameR15 Background to DIADefine here the background to why this DIA has been established.6 Reference to NDAState reference to any Non Disclosure Agreement (NDA) here.7 ProcessesList all safety activities in this paragraph. State which party (XXXA or supplier) is responsible “R” and supporting “S” for each activity.ActivityRS8 Work ProductsList all safety work. State which party (XXXA or supplier) is responsible “R” and supporting “S” for each activity. State which party (XXXA or supplier) approves “A” the work product. State which party the work product is for information “I”.Work ProductAI9 ResponsibilitiesAssign rolesRolePerson XXXA sitePerson supplier siteSafety ManagementProject ManagementQuality AssurtanceProject risk Management10 InterfacesDefine the interfaces between XXXA and supplier:InterfaceInterface DefinitionQuality ManagementConfiguration ManagementProblem and Change ManagementThis doesnt necessarily need to be in the form of a table. A detailed description regarding processes, contact persons and mechanisms of communication might be needed.10.1 MilestonesDefine the milestones for prototypes, sample parts and delivery dates here.11 Combined activities11.1 Combined confirmation reviewsDefine combined confirmation reviews here.11.2 Planning of Safety AssessmentsDefine the planning of safety assessments here.12 CommunicationDefine the communication mechanisms in between XXXA and the supplier here:- Reporting of status- Reporting of progress- Regular meetings etc.- Acceptance and product approval13 Responsibilities after SOPDefine the responsibilities of XXXA and Supplier after SOP.Form No: 1000708329 v03All information contained herein is confidential and/or proprietary to XXXX Automotive and any unauthorized disclosure or utilizat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026上半年安徽事业单位联考黄山市市直单位招聘38人备考题库(含答案详解)
- 漫画课件介绍
- 2026年企业融资方案实施工作计划
- 2026年餐饮连锁运营专员岗位知识考试题库含答案
- (完整版)员工抗压能力测试题及答案
- 2026年冲压工艺工程师岗位知识考试题库含答案
- 2026上半年甘肃事业单位分类考试备考题库发布了吗附答案详解(模拟题)
- 2026云南野生动物园招聘3人备考题库附答案详解(典型题)
- 2026上半年海南事业单位联考琼中黎族苗族自治县招聘60人备考题库附参考答案详解(夺分金卷)
- 2026内蒙古包头西部人才集团为春风十里招聘工作人员备考题库及参考答案详解
- 创伤中心多发伤患者的分诊时间管理策略
- 邯郸爱眼医院眼镜连锁店运营管理手册员工管理手册
- 读书会行业合作协议模板范文
- 东华小升初数学真题试卷
- 情境教学在初中数学教学中的应用研究
- 宁夏的伊斯兰教派与门宦
- 昆虫生态学 第三章种群生态学课件
- 2025年自考00009政治经济学财经类04月真题试卷及答案
- 唐河县泌阳凹陷郭桥天然碱矿产资源开采与生态修复方案
- 恐龙无处不有(2024年山东泰安中考语文现代文阅读试题)
- 中考数学专项复习:一次函数、反比例函数、二次函数的图象共存问题(重点突围)(解析版)
评论
0/150
提交评论