全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
module7 unit4 public transport reading 1learning aims(学习目标):1. to get some information about the first underground in the world;2. to know how to read tourist brochure;learning important and difficulty points (学习重、难点):1. how to use the reading strategy to get some information of the passage.2. how to complete the exercise correctly in time.【自主预习】 : step 1: lead-in1. have you ever read a tourist brochure?_2. what is included in a tourist brochure? where can we find brochure?1) .a brochure usually includes _ in order of time or development2). important _who influenced or contributed to the development are referred to.3). interesting _ are often given in tourist brochures as well.4). the brochure will encourage you_ _step 2: prediction and scanning1. what can you predict will be talked in the passage according to reading strategy? _2. go through the passage and try to answer the following questions.1).when was the first underground system opened?_2).why was the victoria line important?_3). what did charles holden do?_3. read the text and find the information to match the year. ( 以时间为线索跳读课文)dateevent1854186318681884189019331918-19381979step 3: careful reading1. go through the passage again and analyze the structure of the passage.partparagraph(s)main ideapart 1paragraph _ why the first underground in the world was developed.part 2paragraph _of the first underground before world war .part3paragraph _some _ of the first underground during world war .part4paragraph _ and popularity of the first underground system 2. read the text carefully and choose the best answers.1).at first the train service did not go into the city of london because_.a. people in the city of london could not afford it.b. the government of london did not approve the proposal.c. people were afraid that many historic buildings would be damaged.d. people were afraid that the train would cause too much pollution to the town. 2).the first railway tunnel under the river thames in london was built in_.a. 1863 b. 1868 c. 1884 d. 19333). in its history, the london underground has served as many things except_.a. plane factory b. a battle field c. a meeting room d. a bomb shelter4). which of the following statement about charles yerkes is true according to the passage?a. it was charles yerkes that first came up with the idea that an underground system should be developed in london.b. it was charles yerkes together with his colleagues that dug the first railway tunnel under the river thames.c. many railway stations in london, which are still in use today, were designed by charles yerkes .d. it was charles yerkes who bought many different lines and set up the underground group, which later became part of the london passenger transport board5).the victoria line is important because_. a. it was built in honour of queen elizabeths crowning b. it linked with other lines at almost every station.c. it was the last line added in 1977 d. more people travelled on the underground after world war6). who made the most important contribution to the development of london underground system? a. queen elizabeth b. charles yerkes c. charles holden d. both b and cstep 4: consolidation【课堂检测】complete the task-based reading_ why the first underground in the world was developed.the london underground system has the (1) of being the oldest and most complex underground system in the world. before 1850, train services to london had already been (2) , but people couldnt build railways into the city because doing that would cause great (3) to many historic buildings. so many buses were needed to (4)people to the city centre, which, however, often (5) traffic jam. this problem led to the development _of the first underground before world war in 1854, metropolitan railway company was allowed to build an underground railway and the first tunnels were opened in 1863. in 1868, the next (6) of the underground system was opened by another company . in 1884, these two companies (7) up .with the development of the (8) ways of digging tunnels, the first railway tunnel was dug in 1884, and over the next 25 years, six (9) deep underground lines were made, but because they were (10) owned and far away from each other, traveling on these lines was (11) . having seen the situation, charles yerkes, tried to improve the system. he bought many of the different lines and setting up the underground group. in 1933, a public (12) called the london passenger transport board was created, which eventually became london transport. from 1918 to 1938, many new stations were(13) .some _ of the first underground during world war during world war ii, the underground system had some (14) uses. for example, many underground stations once (15) as bomb shelters. _ and _ of the first underground systemafter the war, more lines were added. now, the network of the underground system includes 12 lines and goes 26 miles out of central london. three million people travel on the underground every day. can you imagine what london would be if there were no such underground system?s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 917-2026公路路线标识规则和国道编号
- T/SDJSXH 07-2024塔式起重机自动驾驶系统应用技术规程
- T/JX 001-2024喷水织机行业中水回用水质要求
- T/CCSAS 052-2025三氯氢硅还原法多晶硅生产安全技术规范
- T/CCPA 74-2025公路与市政工程预制混凝土构件智能工厂技术要求
- T/CSMT HJ005-2026产品碳足迹数据质量溯源性要求
- GB/T 48281-2026航空器操纵钢丝绳套管尺寸与载荷
- 2025~2026学年广西壮族自治区玉林市陆川县人教版六年级上册11月期中数学试卷【附答案】
- 甘肃省定西市2027届七上数学期末调研模拟试题含解析
- PHP常用复试面试题及详细答案(真实职场版)
- 阿拉善盟教师招聘真题2025
- 湖南省长沙市2026-2027学年高一上学期期中考试语文自编卷(范围:统编版必修一1-4单元)(原卷版)
- 2026年食品标签标识规范业务考试试卷试题及答案
- GJB 151C-2024 军用设备和分系统 电磁发射和敏感度要求与测量
- ISO9001-2026质量管理体系标准培训
- 2026版公路水运工程试验检测专业技术人员职业资格考试《桥隧工程一本通》
- IPC-JEDEC J-STD-020F-2024 中文版(非气密固态表面贴装器件的潮湿 - 再流焊敏感度分级)
- 2025浙江鹿城农商银行春季招聘笔试历年典型考题及考点剖析附带答案详解
- 2026国家电投集团所属国家核电招聘(41人)笔试历年典型考点题库附带答案详解
- 智慧城市重大危险源在线监控及事故预警平台规划方案
- 2025四川绵阳市绵投置地有限公司人力资源岗等岗位拟录用人选笔试历年参考题库附带答案详解
评论
0/150
提交评论