



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
atmosphere.(9)The emissions taken care of to blow to sweep can not pollute have been already installed in response to the fixed-point emissions of equipments and surrounding environment.(10)Should work well to insulate a work while taking care of and paying a hanger paint, canning not pollute the over ground, wall already, mourn crest and other gearing finished product.1.19.5.6The quality records(1)The air condition system cold system installs examination to criticize a quality acceptance records.(2)Antisepsis with cut off a hot construction examination to criticize quality acceptance record(piping system).(3)The quality acceptance of the airiness and the air condition cent department engineering records.(make cold system)(4)The quality acceptance of the airiness and the air condition cent department engineering records,(5)The concealment engineering records.(6)Start construction diary.1.19.6Air condition water system piping and equipments gearing1.19.6.1The construction prepares1.19.6.1.1The technique prepares(1)Acquaint with technique material.Before installing, have to in advance acquaint with relevant construction diagram paper, norm, regulations, standard diagram to gather and other technique data, in order to control engineering general situation, characteristics and technique request completely.(2)The diagram paper conducts trial jointly.Before installing, have to carry on diagram paper to conduct trial jointly along with the design unit and the superintendency unit(construction unit).(3)The technique hands over bottom.Before installing, should be been long to carry on a technique to hand over bottom to the worker by the professional technique representative director or the work.1.19.6.1.2The material requests(1)Take care of a material:Carbon vegetable steel pipe, dont sew steel pipe.Taking care of the material can not curve, rust eclipse, didnt fly a sting and weigh skin and cave convex gravamen phenomenon.Hard PVC(PVC-U), polypropylene(PP-R), gather D Xi(PB), with hand over organic material piping of allied etc. for gathering ethylene(PEX):Surface without obviously press shriveled, dont row phenomena like wound,etc.(2)Valve door:Cast rules, hairless sting, have no crack, the switch is vivid and tight, the silk buttons up to have no harm and keep degree and angle exactitude, the strength meets a request, the hand round has no harm.(3)Tube piece:Have never been partial to button up, square button up and button up, break a silk and angle incorrect phenomenon indiscriminately.1.19.6.1.3Main machine tool(1)Start construction work machine tool:Set silk machine, try to press a pump, set to drill, pound at electric drill, emery wheel to incise machine, emery wheel machine and ascent machine, steel pipe appropriation to roll slot machine, steel pipe appropriation to open bore machine and communicate electric welding machine and PP-R etc. compound tube appropriation Han machine, pour a chain and take care of pliers etc.(2)Measure tool:The steel keeps a Chinese foot, steel tape measure and Cape Chinese foot, manometer and Han to sew to examine a Chinese foot, spirit level and line to fall to etc.1.19.6.1.4Homework condition(1)The soil having something to do with equipments installing with air condition water system pipings setting up engineering has already started construction to complete to combine through examination qualified, and can promise completely developing of air condition water system piping and equipments install.(2)When the equipments goes together with tube, the equipments should install be over and examine to check qualified, attain to go together with tube construction to request.(3)The diagram paper needed data is as ready as technique document.(4)Pipe, valve door, and piping enclosure.etc. through examination qualified and have been already completed in addition to rust, clean etc. work.(5)The construction machine tool of construction project or the rules in the technique measure has already prepared to is ready.1.19.6.2Start construction craft1.19.6.2.1The equipments installs(1)Water pumps gearing:1)construction front, should carry on reexamination acceptance to the foundation that the soil sets up a construction, especially foundation size, elevation, stalk line, reserve empty etc. should match design to request.The foundation surface is neat, the concrete strength attain an equipments gearing request.2)before water pump install, check the name, specification model number of water pump, check whether the technique parameter of the card of water pump Ming matches designs to request;Water pump external appearance should intact, have no rust eclipse or damage;Pack detailed list according to the equipments, check random whether zero partses taken is well-found, again without the defection and damage and the rust eclipse.3)carry on moving a dish car to water pump, the dish car should be vivid, there is no card puckery with excrescent voice etc. phenomenon.4)when water pump mourn to pack mourn hook and Suo to have, the steel wire rope should hang on the ring of the base or the pump body and the electrical engineering;Disallow the hat pumps in water or the import and export method orchid of the stalk of electrical engineering, bearings or pump up.5)water pump take seat on the foundation and pack ground feet stud bolt, use even mat iron and inclined mat iron carries on seeking to water pump even seek just, and Ning the Luo mother of the last feet stud bolt.6)when the two times infusing of the ground feet stud bolt strach should keep stud bolt to be placed in perpendicular status, the strength of the concrete is hard more 12 classes in height than foundation, and be no lower than C25, and work well the protection work to the ground feet stud bolt.7)fall to on water to pump an import and export method orchid and base to process noodles with level instrument and line the top measure and carry on Jing to water pump even work, make water of whole gearing pump lengthways level degree deviation not in response to more than 0.1|1000, horizontal level degree deviation not in response to more than 0.2|1000;Disintegrate water pump Zong of gearing and horizontal level deviation all not in response to more than 0.05|1000.8)when water pump to unite a stalk machine with electrical engineering adoption to link use 100 cents, form at unite the stalk of stalk machine to with path to carry on diagraph and adjustment, make two allowing of axises deviation:Stalk to tilt to one side not in response to more than 0.2|1000, the path move not to should be bigger than toward 0.05 mms.9)there is water pump gearing to separate to flap a request, its rubbers reducing to flap mat or reducing specification model number and gearing position of flapping the machine should meet a design request.(2)Cooling tower gearing:1)the gearing is ex- should carry on a check to a leg foundation, of the cooling tower leg foun
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 香港支教申请书模板
- 加入书画协会申请书
- 平安建设资金申请书
- 银行贷款延期申请书
- 事业单位退休申请书
- 2025年改造工程合同范本
- 暨南大学金融专硕课件
- 续保申请书 法院
- 参与度鉴定申请书
- 2025医疗器械维修合同书
- 安全培训反三违课件
- (9月3日)铭记历史珍爱和平-纪念中国人民抗日战争暨世界反法西斯战争胜利80周年爱国主义主题教育班会课件
- 私域流量运营策略及五大关键原则
- 2026高中语文选择性必修上册 - -第二单元综合测试卷
- 2025年一级建造师《通信与广电工程管理与实务》案例背诵本
- 外墙真石漆安全培训课件
- 第三章真核微生物 (一)
- 小学中段阅读教学讲座
- 中石化内部控制培训课件
- 土地属地管理办法
- 2025年青少年法律知识竞赛试题库(试题及答案)
评论
0/150
提交评论