已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
浅谈空调安装时需要注意的几点事项1、 安装位置的选定:安装位置的选择要求选择坚固不易受到震动,且足以承受机组重量的地方。机组应远离各类电器、热源2米以上的地方。儿童不易触及的地方。应尽量使室内、外机保持最近,连接管尽量的短。室内、外机的排水不得影响到下面住户及用户自身的建筑物。避免易污染(易燃易腐蚀气体)的位置。室内机下方应尽可能避开电视机、音响、电脑等高级家用电器。室内机应选择可将冷、热风均匀送到室内各个角落的地方。室内、外机周围应保留足够空间,以利空气流动。室外机应装在不影响左邻右舍的地方。室外机选择不易受到雨淋或阳光直接照射及通风良好的地方。保证空调维护、检修方便的地方。保证空调室外机出风口避开逆风向位置。安装位置的确定按照以上要求选定室内、外机的具体安装位置(必要时做好相关标识)当用户要求的安装位置不合理或对机器的后期使用有重大危害时,应予以指出并和用户进行耐心的解释,说明正确的观点并加以修正1、 Selection of Installation Position (Indoor / outdoor lens sequence needs adjustment)SubtitleCommentaryRequirements for Installation PositionThe installation shall be operated at the place which is solid, unlikely subject to shock and able to bear the weight of machine. The outdoor unit shall be installed at the place which with good ventilation, and unlikely subject to rain or direct sunshine. Ensuring that the air conditioner can be easily accessed for maintenance and repair. Keep the indoor and outdoor units as close as possible. The connection pipe shall be short as it might be. To facilitate the air flow, keep adequate space around the indoor and outdoor unit, and avoid flammable or corrosive gas nearby. The drainage shall not affect the constructions of dwellers underneath or the user himself. The machine shall be kept 2m or more away from the electric appliances and heat source. Avoid TV set, sound box, computer and other deluxe home appliances below the indoor unit. To facilitate good ventilation, avoid the air out of the outdoor unit is in the upwind position.The indoor unit shall be able to blow the cold and hot air evenly to everywhere of the room. According to the power supply mode (powered by indoor or outdoor unit) and the length of power cable, select the position which close to the power supply, in order to facilitate the connection of power line. Moreover, ensuring that it is not needed to extend the power cable and selecting a position beyond reach of children. Determination of Installation PositionSelect the final position of indoor and outdoor unit according to the requirements above (Mark properly if needed). If the users chosen position is unreasonable or harmful to the daily usage of the units, please correct his idea with patient persuasion.2、 室内机弯管:根据挂墙板的位置选择穿墙孔的位置(走管方式的选择:1、直接往机身左侧走管;2、直接往背面走管,弯管的时候请用右手托住直角处,然后左手往上面轻轻旋转,旋转至90度后停止;、3、往右边走管,此步骤与上一步骤要求相同,只是弯管的角度比上一步骤大,应该弯到180度为止,注意在弯这个角度的时候力量要轻、动作要慢,否则很容易把管弄瘪),然后打一个孔(比穿墙套管外直径稍大,确保穿墙套管可以顺利穿过)。注意:为有利于内机排水,室内机须略高于穿墙孔,同时保证穿墙孔向外向下倾斜。2、Select the position of wall-cross hole according to the position of wall-mounting plate. Selection of piping mode: Try not to choose the mode of right exit-pipe so as to ensure the orderliness and smoothness of the pipe.1. Route the pipe directly along the right side of the machine body. 2. Route the pipe directly on the rear. When bending the pipe, please support the elbow with your right hand and then use your left hand to rotate slightly for 90 before stop. 3. Route the pipe along the left side. This step is the same as the above step. The only difference is that the bending angle is higher than that in the previous step, that is, it should be bent to 180. Take care to rotate this angle slightly and slowly; Otherwise the pipe would be flattened easily . Then, drill a hole (shuld be a little larger than the outer diameter of the wall-cross tube so as to ensure the wall-cross rube can be inserted through). Caution: For easy drainage of the water out of the internal unit, the indoor unit shall be mounted slightly higher than the wall-cross hole. Meanwhile, the wall-cross hole must be inclined outward down. 3、收冷媒:在制冷模式下,先关掉高压阀,待系统运行1分钟左右,室外机吹冷风的时候,再关掉低压阀。系统收冷媒完毕。3. Collect the refrigerant: set the unit in the cooling mode, and switch off the high pressure valve. After about 1 minute running of the system and the outdoor unit blows the cool wind, shut down the low pressure valve. Then the collecting refrigerant is done.4、系统排空:当空调系统安装好后,用十字螺丝刀顶住维修阀顶针,然后打开高压阀,待维修阀处有冷媒喷出后,放开维修阀,最后打开低压阀。系统排空完毕。4. Vacuate the system: after the installation of the unit, use the screwdriver to hold the eject pin, and then open the high pressure valve. After the service valve leaks refrigerant, loose the service valve, and open the low pressure valve,then the vacuation is done. 5、 加长管后系统需要增加的冷媒量:5、After lengthening the indoor and outdoor connecting pipe,the AC system should charge additional refrigerant amount。Refer to the following form。Additional refrigerant amountLiquid pipe diameter 6.35mm (1/4)Liquid pipe diameter 9.52mm (3/8)(piping length-5)m30gOr (piping length-16)ft0.3oz(piping length-5)m65gOr (piping length-16)ft0.7oz1m=3.28ft; 1ft=0.3048m;1oz=28.34752g;6、空调系统运行时,高低压压力参考表:技术参数: R22,R407C,R410A匹配经验额定制冷匹配R22R407CR410A吸气温度101213151618排气温度858575吸气绝对压力kg/cm25656810排气绝对压力kg/cm2182020232629额定制热匹配R22R407CR410A吸气温度121256排气温度807070吸气绝对压力kg/cm2455679排气绝对压力kg/cm2192121232730一般情况下,系统平衡压力在910公斤力。7、用户电源的检查(电表容量、线径、漏电保护开关、地线、电压)电源检查用万用表测量电源电压,需在额定电压正负10%的范围内。空调电源应用专用分支线路,并保证整条供电线路(分支线路、电源线、电表、空气开关等)的容量大于空调最大额定电流。电源配置及布线符合当地电气安全要求建议用户为空调配专用空气开关与漏电保护器等保护装置,容量应满足空调需要,有保险丝保护线路严禁使用铜丝代替保险丝。各种机型对电源的要求表一(220V-240V) 项 目 型 号电 源 线 横 截 面 积(mm2)电闸开关(A)分 体 壁 挂 式 系 列251.01030、32、35、361.51051、611.510662.52025辅助电加热1.51032、35、36辅助电加热1.51051、61、66辅助电加热2.520分 体 落 地 式 系 列46、51、611.51075、1202.52046、51、61辅助电加热2.52075辅助电加热(220V)4.02075辅助电加热(380V)2.520120辅助电加热2.520以上是标准电源情况下的参考值,在实际操作中可以对电源线径作更高的要求表二(115V) 项 目 型 号电 源 线 横 截 面 积(mm2)/ 规格(AWG)电闸开关(A)分 体 壁 挂 式 系 列KF-25/b21 mm2 / 14AWG15AKF-26/b21 mm2 / 14AWG15AKF-35/b21 mm2 / 14AWG20A7、Check the users power supply (kilowatt-meter capacity, wire diameter, electric leakage protection switch, ground wire and voltage)SubtitleCommentaryCheck the power supplyUse the multimeter to measure the power voltage, which shall be within +/-10% of the rated voltage. Use special line for the power supply of air conditioners, and ensuring that the capacity of entire supply line (branch line, power line, kilowatt-meter, air switch, etc) is higher than the maximum rated current of air conditioner. The power configuration and cable distribution must meet the local requirements for electrical safety. Advise the user to apply special air switch, electric leakage protector and other necessary protection devices for air conditioners. Their capacity shall meet the needs of air conditioner. For the line with fuse, it is prohibited to use copper wire to replace the fuse. Table: The Requirements of Different Models for Power SupplyTable 1 (220V-240V) Item Model Section Area of Power Cable (mm2)Circuit Switch (A)Split Wall-Mounting Series251.01030, 32, 35, 361.51051, 611.510662.52025 Auxiliary electric heater1.51032, 35, 36Auxiliary electric heater1.51051, 61, 66 Auxiliary electric heater2.520Split Floor St
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 连锁经营系列讲座第五讲特许经营管理体系整体设计与建立
- 员工心理咨询服务提供方式介绍
- 在线心理咨询行业即时文字咨询调研报告
- 安全绳牵引方向可采用角度仪检测方法
- 在线学习情感体验与学习效果关系研究综述
- 深圳南山新媒体运营招聘 19 人会剪辑优先考试题库
- 陕西铜川王益 2026 能源监管岗公务员招录理论考卷 招聘 3 人
- 在线健身行业用户留存调研报告
- 在线Vlog拍摄指南
- 煤炭企业环保细则
- 第十届“雄鹰杯”小动物医师技能大赛备考试题库(附答案)
- 医院食品安全培训
- 2025年第九届“学宪法、讲宪法”知识竞赛测试题库(含答案)
- (正式版)DB14∕T 3563-2025 《 县域医共体慢病管理中心建设与运行规范》
- 混凝土理论知识考核试题题库与答案
- GB/T 9944-2025不锈钢丝绳
- 农村住房安全教育培训课件
- 警用无人机操作与应用培训大纲
- 2025-2026学年沪粤版(2024)初中物理八年级上册教学计划及进度表
- 2025年人教版三年级下册数学期末复习每日一练(21天)
- 【公开课】热量+比热容(教学课件)2025-2026学年初中物理人教版(2024)九年级全一册
评论
0/150
提交评论