BOILER BOIL OUT.doc_第1页
BOILER BOIL OUT.doc_第2页
BOILER BOIL OUT.doc_第3页
BOILER BOIL OUT.doc_第4页
BOILER BOIL OUT.doc_第5页
已阅读5页,还剩5页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 0 Section Cover Page Section 23 25 19 Cleaning and Chemical Treatment 2013 04 04of Steam Boiler Systems Use this Section to specify the chemical cleaning and treatment of steam boiler systems Refer to Section 23 25 02 for a complete list of sections related to Chemical Cleaning and Treatment of Mechanical Systems This Master Specification Section contains 1This Cover Sheet 2Data Sheet Reference Standards 2Data Sheet Guidelines for Renovated Systems 3Specification Section Text 1 General 1 1Intent 1 2Related Requirements 1 3Reference Documents 1 4Performance Requirements 1 5Submittals 2 Products 2 1Cleaning Chemicals 2 2Chemical Treatment Materials 2 3Water Test Equipment 3 Execution 3 1Equipment Installation 3 2Cleaning General 3 3Pre Boiler Equipment Cleaning Procedure 3 4Boiler Cleaning Procedure 3 5Deposit Removal Procedure 3 6Cleaning Direct Steam Culinary Boilers and Sterilizers 3 7Operation Maintenance until Interim Acceptance 3 8Waste Water and Material Disposal 3 9Chemical Cleaning and Treatment Schedule for Renovated Systems Data Sheet Guidelines for Renovated Systems Section 23 25 19 Cleaning and Chemical Treatment 2012 11 09of Steam Boiler Systems BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 0 1 When any of the following work has been performed no cleaning is required but loose deposits must be flushed out before flooding with system water 1A minor amount of new piping is added to the system when compared with the entire system 2Converter is re tubed 3Less than approximately 50 of the tubes are replaced in a fire tube or water tube boiler 2 New piping which can be isolated from the rest of the system 1Clean piping using the chemical cleaner and procedure specified in 2 1 3 and 3 4 2Chemically treat the entire system with a corrosion inhibitor specified in 2 2 and 3 7 3 New piping which can not be isolated from the rest of the system 1Clean the deposits from the entire pre boiler system as specified in 2 1 3 and 3 5 2Clean the entire system with the chemical cleaner and procedure specified in 2 1 1 and 3 3 and 3 4 3Chemically treat the entire system with a corrosion inhibitor specified in 2 2 and 3 7 4 Fire tube boilers where more than approximately 50 of the tubes in a fire tube boiler are re placed 1Isolate the boiler from the rest of the system 2Clean the deposits from the boiler as specified in 2 1 3 and 3 5 3Clean the boiler with the chemical cleaner and procedure specified in 2 1 1 and 3 3 and 3 4 4Chemically treat the boiler with a corrosion and scale inhibitor specified in 2 2 and 3 7 5 Removal of deposits from system boiler where no new piping is added or re tubing is done 1Clean the deposits from the system boiler as specified in 2 1 3 and 3 5 2Chemically treat the system boiler with a corrosion inhibitor specified in 2 2 and 3 7 END OF DATA SHEET Section 23 25 19 Cleaning and Chemical Treatment Plan No of Steam Boiler Systems Project ID Page 1 2012 11 09 BMS Version 1 General 1 1INTENT 1This Section specifies services and material required for onsite cleaning and chemical treatment of a multi metal steam boiler system 2Do not clean and chemically treat direct contact culinary steam boilers and steam sterilizers 3Do not soften feed water to culinary steam boilers and steam sterilizers 1 2RELATED REQUIREMENTS 1Mechanical Spare Parts and Maintenance Materials Section 20 00 23 2Chemical Treatment and Cleaning Equipment Section 23 25 01 3Chemical Treatment and Cleaning General RequirementsSection 23 25 02 1 3REFERENCE DOCUMENTS 1Alberta Infrastructure Water Treatment Program Manual 1 4PERFORMANCE REQUIREMENTS 1Clean system to remove oil grease silt and rust and leave metal surfaces well passivated Section 23 25 19 Cleaning and Chemical Treatment Plan No of Steam Boiler Systems Project ID Page 2 2012 11 09 BMS Version 2Chemically treat and maintain system water to meet following standards ParameterControl Limits Boiler Water pH 10 5 11 5 TDS S cm 2000 4000 neutralized sample OH alkalinity mg L CaCO3 150 300 M alkalinity mg L CaCO3 700 sulphite mg L SO3 30 60 phosphate mg L PO4 40 80 Boiler Feedwater hardness mg L CaCO3 2 Softener Outlet hardness mg L CaCO3 2 Boiler Condensate pH for systems not used for humidity control 8 5 9 5 pH for systems used for humidity control 8 0 8 5 TDS S cm 50 hardness mg L CaCO3 2 1 5SUBMITTALS 1In addition to submittal requirements specified in Section 23 25 02 submit a written report of actual cleaning activities including 1Times 2System status 3Problems encountered 4Actions taken 5Composition of cleaning 2Step 2 Blend in prepared concentrated cleaning solution for removal of deposits etc establish circulation and maintain system temperature at 60 C until total iron concentration stabilizes 3Step 3 Dump spent cleaning solution to disposal fill system with domestic water circulate system contents for at least two hours and drain spent rinse water from various locations in system to disposal Section 23 25 19 Cleaning and Chemical Treatment Plan No of Steam Boiler Systems Project ID Page 7 2012 11 09 BMS Version 4Step 4 Fill system with domestic water and repeat step 3 until water samples collected from system are free of suspended material 5Step 5 Drain system and perform visual inspections of metal surfaces at three different locations 6Complete steps 3 4 5 within a 24 hour period 7Step 6 If metal surfaces contain scale or iron deposits and are not passivated fill system with domestic water and repeat steps 2 3 4 5 3 6CLEANING DIRECT STEAM CULINARY BOILERS AND STERILIZERS 1Manually flush system thoroughly to remove debris 3 7OPERATION MAINTENANCE UNTIL INTERIM ACCEPTANCE 1Perform following minimum routine maintenance until Interim Acceptance of the Work 1Maintain control limits specified under Performance Requirements Add chemicals as required 2Blow down boiler as required 3Maintain operation of softener system 4Test water samples of system once per day for following 1Boiler Water 1pH 2TDS S cm 3OH alkalinity mg L CaCO3 4M alkalinity mg L CaCO3 5Sulphite mg L SO3 6Phosphate mg L PO4 2Boiler Feedwater 1Hardness mg L CaCO3 3Softener Outlet 1Hardness mg L CaCO3 Section 23 25 19 Cleaning and Chemical Treatment Plan No of Steam Boiler Systems Project ID Page 8 2012 11 09 BMS Version 4Boiler Condensate 1pH 2TDS S cm 3Hardness mg L CaCO3 2Document water analyses results quantities and dates chemicals added make up water used and blowdown adjustments on a chemical treatment report form 3 8WASTE WATER DISPOSAL 1Wastewater discharged into a municipal sa

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论