



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
build to carry on in response to the layering, each thickness not over 60 cms,Next anticipate a side to flap Dao, the continuous homework sprinkles to build a crest, in the center dont stay a construction to sew and sprinkle to build to complete concrete strength to attain1.2| mms 2 empresses can immediately dismantle a mold, dismantling the mold has to notice to protect pillar noodles and sharp angle to be free from damage and use plastics thin film after dismantling a moldOr the hemp sack cloth carry on protecting.2)beam plank the concrete sprinkle to build at the same time, is mourned by the tower to send to concrete to sprinkle to build a location, each time top-grade water segment from aCarry to start sprinkling to build, namely sprinkle to build into a stairs form according to the beam high mark layer, arrive plank what time to sprinkle to build together with plank concrete again,Continuously prolong along with the stairs form, the beam plank concrete sprinkles to build to push forward forward in a row and sprinkle to build and flap Dao have to close match,The beam crunode core area is flapped good meticulous Dao of Dao with the small diameter solid, the plank use flat panel flaps a Dao machine perpendicularity to sprinkle to build a direction to go back and forthFlap Dao, flap Dao to use after completing long put on son to put on even, the plank noodles elevation wants to be tight to control and forbid extremely high.Sprinkle to build process BE,Each profession needs to send specially assigned to be responsible for respectively the quality control of item, should usually observe template, support, reinforcing bar and prepare to cover upPiece and reserve the stable circumstance of hole, while discovering to transform, move, should immediately stop sprinkling to build, stand together namely adoptThe measure is hasing already sprinkled to build concrete concretion before fix whole intact.3)engineering design pillar concrete the grade and the beam plank concrete grade is inconsistent, so should adopt while starting constructionThe following measure ensures that the beam deals with contact the concrete grade of place.Pillar side beam the beam concrete strength wait inside 45 blocksClass together pillar concrete.4)wall, pillar level constructions sewing a construction to notice , before the concrete sprinkles to build, have to carry on connecting a syrup processing,The adoption together goes together with to compare to reduce pebble sand syrup, thickness control at the 510 mm is thick, strictly forbid have never connected syrup to sprinkle to build concrete.(2)Concrete should with the minimal redistribution number of times and the shortest time, from mix blend the location carry to sprinkle to build a location.(3)The concrete falls from the eminence Qing of freedom height, should not over the 2 ms, be sprinkle to build height over 2 ms, Should adoption string the tube make concrete whereabouts.(4)Flap Dao stick with the insert type while sprinkling to build pillar, beam and stairs, sprinkle a plank adoption now flat panel to flap a Dao machine to flap actually;In the process of sprinkling to build in, should usually observe template, support, reinforcing bar, prepare to cover up a piece and reserve the circumstance of hole, be hairIs existing to transform, when moves should adopt a measure processing in time.3.the concrete construction sew of stay to establish(1)The pillar detains noodles at the foundation crest, the underneath 2030 mm of beam or establish an elevation at the beam plank.(2)Plank, detain at with lord the Jin is parallel of any position.(3)Have a lord the building plank of the time beam is proper follow time the beam direction sprinkle to build.Constructions sewing should detain in the time beam to across a degree of inInside 3 scopes, 1|s lord beam with hang arm beam facilities work dont sew.4.try a piece to stay to establish:Each set class stays to establish to be no less than 1 set to try a piece of standard to protect.5.collapse to fall one degree experiment(1)Ask each set class to make to collapse to fall a degree to experiment and meet to collapse to fall one degree request according to the norm.(2)Rain tests freestone to contain water rate in time behind and adjusts a concrete match to compare and strictly control collapsing of concreteFall a degree, ensure that the quality of concrete meets a request.6.the concrete protect(1)Concrete should the 12 hs after sprinkling and building to complete in overaly the concrete and water.The winter expects plank,The beam covers the 1 F plastics cloth first, then overaly grass Shan, the post wraps a hemp sack heat preservation to protect, below 5 adoption brushes to protect a liquid.(2)The concrete waters to protect time and mix the concrete making to protect time to the adoption Huo sour brine mire not smallIn 7 ds.(3)Watering the number of times should can keep concrete to be placed in smooth wet status.(4)The concrete protects to use water application with mix to make to use water a homology.(5)BE having already sprinkled the concrete strength for building to come short of a 1.2 Ns|mm 2 before, can not above it trample or installTemplate and support.(6)Adopt a hemp sack overlay to protect concrete in summer, all surface application hemp sack clothes of its my dew overaly strictIs airtight, and should keep have already condensed water or adoption to protect a liquid to protect inside the hemp sack.7.the concrete quality request:Have to attain the standard of clear water concrete, then the surface is neat, yin and yang Cape agreeableKeep, the square is positive, construction sew place have no wrong match, concrete each item actually measures solid the quantity random take out to check a qualified rate to reach to above 90%,The waterproof concrete ensures not to ooze gastight, the strength grade, anti- of concrete oozes strength grade to attain a design request.(Seven)Scaffold1.steel pipe scaffoldThis engineering 4 F builds brick wall and outside repairs to adopt a fall to the ground type a double as follows row scaffold, the corpus 4 F above inside the adoptionScaffold, the scaffold Zong is apart from a 1.5 ms, horizontal be apart from a 1.2 ms, tread to be apart from a 1.2 ms, each 6 ms establishes to together throw to support, inside the bodySmall horizontal pole should with have already built brick wall a body crest prison, shear dint to support one clean be apart from is smaller than a 15 ms, each one shears dint to support not to should be smaller than 4 across,And dont should be smaller than a 6 ms, outside double of rows base in response to the popular original soil layering establish 50 long plastic sheets on the mat layer actually, with indeedProtect the stabil
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 课件无法编辑的原因
- 离心铸管工5S管理考核试卷及答案
- 成都车辆安全培训课件
- 教师招聘之《幼儿教师招聘》考前冲刺练习试题及参考答案详解【能力提升】
- 成都珠宝镶嵌培训课件
- 成都公交集团安全培训课件
- 成品库安全培训课件
- 课件总结模板
- 2025年广东省佛山市公安辅警招聘知识考试题(含答案)
- 彩色路面安全知识培训课件
- 水利施工组织设计范文(完整常用版)
- DBJ53-T-40-2011 云南省城镇园林工程施工质量验收规程
- 《正确认识广告》课件3
- 学校体育学(第三版)课件第八章体育教学设计
- DB15T 2412-2021 蒙餐 蒙式牛肉丁
- MPA、公务员必修课《公共政策》课件: 政策制定
- 大学物理高斯定理课件-英文版
- 船舶与海上设备设施起重2008年4月1日生效
- GB∕T 15089-2001 机动车辆及挂车分类
- 班级自主化管理工作总结
- 关于推进城管勤务机制改革提升城市管理
评论
0/150
提交评论