已阅读5页,还剩8页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CHECK LIST Date Checked By Villa Entry ItemsRemarks Date Inspected Inspected By Date Inspected Inspected By All excess paint to be removed from access walkway OPSProject Remove all excess paint overspray on wall from bamboo screen treatment at entry doorway No ground earth wire provided to light fitting Exposed cabling need to cover by installing wires in conduit and paint to match wall finish color Entry door does not keep rain water out floor very slippery when water inside and door rattles in wind at night and is disturbing To provide a weather strip on bottom of door and a seal to be applied to the door frame to prohibit rattling in wind CHECK LIST Date Checked By Mechanical Room ItemsRemarksDate Checked By Date Checked By Aircon unit not installed properly it is at an angle across the plant room and therefore air flow across the coils is not as good as it should be additionally the hot exhaust air is re circulated inside the room and decreases efficiency of the unit No cover on MATV junction box individual circuits are not labeled either at the terminal box or inside the guest room wall plates for ease of identification OPSProject Exposed wiring and terminations to be replaced and all terminations made in approved junction boxes Electrical switch board circuits not labeled and no safety cover plate with circuit breakers identified Voice and Data cabling not installed properly blue cable Hot and Cold water supply isolation valves not labeled Air conditioning screen not installed properly CHECK LIST Date Checked By Room Inside Main Living Room ItemsRemarksDate Checked By Date Checked By Paint marked and stained on the wall beside TV Water damage around window beside TV suspect poorly installed window frame to be inspected and addressed OPSProject TV cabinet damage Mini bar not installed with good ventilation and unit operating very hot which will reduce service life of unit prematurely Recommend to cut second slot for natural air circulation Safety box to be secured by bolting down onto the drawer unit in the wardrobe CHECK LIST Date Checked By Bathroom ItemsRemarksDate Checked By Date Checked By Hand basin water leak Bathroom and toilet entry doors handles are corroding badly and finish is unacceptable Recommend to replace all bathroom hardware fittings with better quality OPSProject Bathroom shower and toilet doors are of low quality finish laminate imitation wood veneer surfacing coming off doors Recommend doors are replaced with solid wood Drain not connected properly Note Water pressure modulating it s not constant and needs to be addressed through the plant room domestic cold and hot water system checks Bathroom tub drain not connected properly Bathtub moving on floor inside bathroom and in most cases the drain connection is proud of the floor so the tub floor is not flat and water ponds CHECK LIST Date Checked By Bathroom window exterior screening ItemsRemarksDate Checked By Date Checked By External window frame needs to be cleaned of over paint finish and properly painted Excess wire noted on many exterior bathroom structures from construction these need to be removed and the structures painted to a clean finish OPSProject CHECK LIST Date Checked By Ceiling space above bed ItemsRemarksDate Checked By Date Checked By Coadunate drain line and drip tray not installed properly If the condensate drain is not installed with a fall from the catchment tray down to the main drain line then water will flood the tray causing serious ceiling damage over time Recommend that the trays and drains are tested during snagging by filling trays artificially with a water form a jug to ensure trays can drain before handover completed OPSProject CHECK LIST Date Checked By Deck Area ItemsRemarksDate Checked By Date Checked By Composite wood finish surrounding the Jacuzzi is not finished safely Recommend to change material for timber decking Back terrace exterior light fitting rusting cables exposed and to be installed inside conduit painted color as the wall finishes OPSProject External lights fitting crowded Feature light no access to replace bulb contractor provide method statement Jacuzzi parts missing like headrests and overflow covers these need to be replaced by contractor before handover CHECK LIST Date Checked By Air conditioning
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 IEC TR 62595-1-6:2025 EN Display lighting unit - Part 1-6: Quantum dot films and quantum dot diffuser plates used in backlight unit
- 浙江中烟工业2025年下半年校园招聘易考易错模拟试题(共500题)试卷后附参考答案
- 代收快递的合同范本
- 河北公安警察职业学院2025事业单位招聘拟聘易考易错模拟试题(共500题)试卷后附参考答案
- 江西九江市修水县部分县直机关下属事业单位选调易考易错模拟试题(共500题)试卷后附参考答案
- 借用信用卡合同范本
- 公司换部门合同范本
- 公司委托催收协议书
- 广州市人社局2025年下半年第二期招考事业单位工作人员易考易错模拟试题(共500题)试卷后附参考答案
- 公司提前分红协议书
- 专利代理师真题及答案解析2025年
- 生鲜蔬果配送管理办法
- 2025年世界500强与中国民营100强全球投资布局趋势报告-前瞻研究院
- 高职班家长会课件
- 2025年食品安全督导师资格考试试题及答案
- 输液导管相关静脉血栓形成中国专家共识解读培训课件-中心医院
- 成人失禁相关性皮炎的预防与护理(2024年中华护理学会团体标准)
- 合江晚熟荔枝管理办法
- 国家电网反违章教育培训
- 2025年中国电信招聘笔试参考题库附带答案详解
- JG/T 255-2020内置遮阳中空玻璃制品
评论
0/150
提交评论