




已阅读5页,还剩20页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library solid di spread row engineering increased geological disaster hidden points governance efforts solid advance small basin torrent disaster governance efforts from essentially solution basin sex and regional flood control drainage capacity insufficient of problem Vigorously implement the piers algae and other water sources protection and promoting rural drinking water safety projects setting up water pricing reform and environmental protection mechanism guiding water depth Further soil pollution and repair strengthen agricultural non point source pollution prevention mountain water forests fields lakes various elements mutual long Four manage to tighten control to play three to split battle Xia Baolong Secretary of provincial party Committee stressed that while the three to split operation time is over three years but three to split must continue to catch on and resolve a split cannot be changed All localities and departments to the village and no unauthorised created 一 一 概述概述 建筑工程项目管理是以建筑工程项目为对象 以项目经理负责制为基础 以实现项目目标为目的 以构成建筑工程项目要素的市场为条件 以与此 相适应的一整套施工组织制度和和管理制度作保证 对建筑工程项目的建 设全过程系统的进行控制和管理的建筑工程项目系统管理的方法体系 二 二 建设项目施工准备工作建设项目施工准备工作 建设工程项目总的程序是按照决策 设计 施工和竣工验收四大阶段进 行 其中施工阶段又分为施工准备 土建施工 设备安装和交工验收阶段 征地 拆迁和场地平整 完成施工用水 电 路等工程 组织施工招标投标 择优选定施工单位 办理各项建设行政手续 编制项目管理实施规划等 1 施工准备工作 施工准备工作 是指施工前为了保证整个工程能够按计划顺利施工 在事先必须做好 的各项准备工作 具体内容包括为施工创造必要的技术 物资 人力 现 场和外部组织条件 统筹安排施工现场 以便施工得以好 快 省 安全 地进行 是施工程序中的重要环节 自此可见 施工准备工作是企业搞好目标管理 推行技术经济责任制 的重要依据 同时是土建施工和设备安装顺利进行的根本保证 在开工之 前 都必须 进行施工准备 施工准备工作是施工阶段的一个重要环节 是施工管理的重要内容 施工准备的根本任务是为正式施工创造良好的条 件 施工准备工作的进行 可以避免浪费 有利于保证工程质量和施工安全 对提高经济效益 亦具有十分重要的作用 videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library solid di spread row engineering increased geological disaster hidden points governance efforts solid advance small basin torrent disaster governance efforts from essentially solution basin sex and regional flood control drainage capacity insufficient of problem Vigorously implement the piers algae and other water sources protection and promoting rural drinking water safety projects setting up water pricing reform and environmental protection mechanism guiding water depth Further soil pollution and repair strengthen agricultural non point source pollution prevention mountain water forests fields lakes various elements mutual long Four manage to tighten control to play three to split battle Xia Baolong Secretary of provincial party Committee stressed that while the three to split operation time is over three years but three to split must continue to catch on and resolve a split cannot be changed All localities and departments to the village and no unauthorised created 2 施工准备工作的分类 施工准备工作的分类 1 按施工项目施工准备工作的范围不同分类 施工项目的施工准备工作按其范围的不同 一般可分为全场性施工 准备 单位工程施工条件准备和分部分项工程作业条件准备三种 1 全场性施工准备 全场性施工准备是以整个建设项目或一个施工工地为对象而进行的 各项施工准备工作 其特点是施工准备工作的目的 内容都是为全场性施 工服务的 不仅要为全场性施工活动创造有利条件 而且要兼顾单位工程 的施工条件准备 2 单位工程施工条件准备 它是以建设一栋建筑物或构筑物为对象而进行的施工条件准备工作 其特点是施工准备工作的目的 内容都是为单位工程施工服务的 但它不 仅要为该单位工程在开工前做好一切准备 而且还要为分部分项工程做好 施工准备工作 3 分部 分项 工程作业条件的准备 它是以一个分部 分项 工程或冬雨期施工项目为对象而进行的作 业条件准备 是基础的施工准备工作 2 按施工阶段分类 施工准备工作按拟建工程所处的不同施工阶段 一般可分为开工前 的施工准备工作和各分部分项工程施工前的准备两种 1 开工前施工准备 它是在拟建工程正式开工之前所进行的千切施工准备工作 其目的 是为拟建工程正式开工创造必要的施工条件 它既可能是全场性的施工准 备 也可能是单位工程施工条件准备 2 各分部分项工程施工前的准备 它是在拟建工程正式开工之后 在每一个分部分项工程施工之前 所进行的一切施工准备工作 其目的是为各分部分项工程的顺利施工创造 必要的施工条件 又称为施工期间的经常性施工准备工作 也称为作业条 件的施工准备 它带有局部性和短期性 又带有经常性 videoconference Secretary of the provincial Committee of Xia Baolong stressed this year is the five water treatment 357 timetables for three years to resolve outstanding issues obviously worked victory of the year The County s departments at all levels must firmly establish the guanghui is gold and silver green development concept convinced that Castle is not relaxed always maintaining strategic ability and strong determination to improve the environment consistently playing well five water treatment of winning the war ever higher levels of comprehensive well off society was built A lay the sewage uphill battle This year we will river water quality improved at the county level up to five this basic objective grasp of pollution control that focus with the focus on three things a good job clear rivers reaching the County created Organization look back special inspection the County garbage River black and odorous River is Dragnet investigation timely rectification of problems found in place firmly to prevent river pollution rebound In accordance with the one stop strategy improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control five water quality section 3 municipalities controlled deterioration ensure the creation this year of clear rivers standards Second pay special attention to pollution cutting construction of nanotubes Intercepting nanotubes are the basis of pollution of water source engineering engineering matter of success or failure of water management Urban sewage treatment to improve effluent from sewage treatment rate running accuracy compliance requirement speed up the town s support network construction is focusing on nanotubes home last meters question Domestic sewage treatment in rural areas this year is the final year of the three year action determination to fight and the momentum around ending the battle on which fully to ensure the realization of all County 648 formed village coverage Also be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management ensure that wastewater treatment facility up and running role play avoid the Sun problem Third pay special attention to the River Lake pond desilting operation Provinces now have focused on pollution control of water go to dig up mud as the deepening water of this year s plays Next to jump start an investigation line touches work implementation plan according to the priorities and the programme of work in accordance with the one river one policy requires detailed cleaning dredging plan planning ahead of time cleaning out mud way out according to local conditions to do sludge promote scientific resource utilization of silt and mud B the heavy regulation of heavily polluting industries Pollution of water must grab the source wastewater is primarily the source of backward production capacity increase the intensity of treatment of heavily polluting industries According to municipal and municipal government deployment of seven big heavy pollution industry regulation three years action plans requirements to December 2016 end of Qian all included shut stopped eliminated of enterprise all shut stopped eliminated in place June 30 2017 Qian all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place late not standard of enterprise are implementation discontinued June 30 2018 Qian all intends Park production of enterprise relocation Park in place late not Park of are discontinued In the process of renovation will focus on four aspects to firmly close the high energy consumption and heavy pollution hopeless enterprise governance and production lines eliminated a number of yearly emission intensity low value added products of backward production capacity Second we must strictly enforce the space total project Trinity environment access system promoting industry access and environmental conditions of access of enterprises to the Park industrial park in principle no longer the class on the new project Thirdly promoting replacement and reconstruction of heavily polluting industries mergers and reorganizations guide enterprises to energy conservation recycling and low carbon and clean production and improve the level of green development Four to establish a long term supervision mechanism increase the intensity of special inspections investigate and punish the rectification is not in place normal business of running anti pollution installations do not Iii linkage to promote flood control water drainage water supply improving water saving Speed up cross Yang support river dike reinforcement and along Pu seawall except insurance reinforcement and Lake Qian sluice and BA Cao sluice and cloud cover reservoir focus flood control drainage engineering construction vigorously implementation strong library s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 小儿胃食管反流课件
- 小儿肾积水护理课件
- 小儿病课件教学课件
- 摩托车公户协议的合同范本
- 买卖房协议合同补充协议
- 小儿推拿腹泻手法课件
- 代物清偿协议借款协议书
- ECFA协议离婚协议书
- 买方延迟收货免责协议书
- 网签合同协议范本模板模板
- 2025红色中国风《长安的荔枝》读书分享模板
- 智慧停车系统开发与运营合作
- T/SHPTA 102-2024聚四氟乙烯内衬储罐技术要求
- T/CAQP 001-2017汽车零部件质量追溯体系规范
- 彩票店管理制度
- 西安经开第一学校语文新初一分班试卷
- 加油站股制合同标准文本
- DB33-T 1354.2-2024 产业数据仓 第2部分:数据资源编目规范
- 劳务外包服务投标方案(技术标)
- CNAS-CL36-2012 医学实验室质量和能力认可准则在基因扩增检验领域的应用说明
- JJG 184-2024 液化气体铁路罐车容积检定规程
评论
0/150
提交评论