




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Robotics and Automation Systems and Interfaces 10 1Overview Due to the harsh conditions on the Martian surface and the many time consuming and monotonous task robotics and automation will play a vital role in habitat operations The robotics and automation subsystem is responsible for designing the automated systems and interfaces that are outside of the scope of other subsystems Hoffman et al 1997 The Robotics and Automation subsystem is also responsible for designing the interfaces between all robotics systems and the habitat except for the LPR which is also covered by EVAS The habitats robotic systems have a major role in the development of infrastructure elements of the habitat and habitat operations including site analysis habitat assembly instrument deployment and scientific investigation Hoffman et al 1997 Table 10 1 Requirements table RequirementSource 10 1Deploy scientific instruments used for initial analysis and monitoring of mars DRM 10 2Deploy Infrastructure nuclear power station antennas solar arrays etc DRM 10 3Provide method of sample acquisitionDRM 10 4Provide method for Infrastructure inspection and maintenance DRM 10 5Provide for construction and assembly of site and structures site preparation drilling excavation DRM 10 6Provide local transportation for EVA activityDRM 10 7Robotics shall operate through entire mission durationDRM 10 8Robotics shall support control and communication telerobotic or fully autonomous based on mission DRM 10 9Diagnosis and maintenance of robotics shall be automated repair if possible DRM 10 10Robotics shall meet all fault tolerances and safety standards DRM 10 11Robotics shall meet all size and weight restrictionsDRM 10 12Robotics shall provide for movement Auto teleauto DRM 10 13Robotics shall support payload operationsDRM 10 14Equipment shall meet thermal loading tolerancesDRM 10 15Deploy and operate various mechanisms on habitatDRM 10 16Robotics will support deployment and assembly of power plants DRM 10 17Automate time consuming and monotonous taskDRM Figure 10 1 Input output diagram for Robotics and Automation The input output diagram for the Robotics and Automation subsytem figure 10 1 is a relatively simple one Most of the subsystems interaction is with C3 these communications allow for control of the automated systems There is also an exchange of audio data with EVAS so that the rovers can communicate with crewmembers out on EVA The last connection with Robotics and Automation is to the Thermal and Power subsystems for the removal of heat and a power transfer for recharging of the rovers and the automated systems 10 2Design and Assumptions The main robotic systems that will be required for habitat operations are three different types of rovers including the small scientific rover the local unpressurized rover and the large pressurized rover Hoffman et al 1997 It should be noted however that the Robotics and Automation subsystem was not responsible for the design of these systems due the fact that the scope of the project was the design of the habitat and these system fall outside of that So what will be covered are the requirements for the rovers driven by habitat operations and the interfaces between the rovers and the habitat C3 ECLSS Thermal Power Robotics Automation Structures Crew Accommodations Crew EVAS ISRU ISRU Plant Nuclear Reactor Mars Environment Mars Com SatellitesHabitat Boundary Oxygen Nitrogen CO2 Cabin Air Trace Contam H20 Vapor H2 Potable H20 Non Pot H20 Solid Waste Liquid Waste Food Telemetry Video Audio Packet Data TCP IP Command Heat Electric Power MOB Habitat Overall Subsystem Functional Diagram 10 2 1 Small Scientific Rover Two small scientific rovers shown in Figure 10 2 will be used mainly for exploration These rovers will be autonomous a majority of the time but will have the capabilities to perform tele robotic operations with the controller stationed in a shirtsleeve environment Also the rover will be capable of self recharging through solar panels Figure 10 2 MER rover close to the expected rovers that will be used This type of rover will be required to deploy scientific instruments collect and return samples from the Martian surface determine safe routes for crew travel and act as a communications relay in contingency situations The interface between these rovers and the habitat will be minimal Only data will be transferred to and from the habitat The data will consist of telemetry audio and video and any other necessary data from the rover s scientific instruments 1 2 2Local Unpressurized Rover The cargo carrier will also be bringing one local unpressurized rover LUR shown in Figure 10 3 This rover will be required to provide local transport around 100 km from the habitat for the EVA crews and EVA tools The LUR will also be required to operate for 10 hours with the charge discharge cycle being under one day This type of rover will have two interfaces with the habitat exchanging both power and data The power will be transferred via a direct connection with the outlet positioned on the outside of the habitat and the inlet connection placed on the outside of the rover The rover will also be sending and receiving audio and relaying telemetry information to and from the habitat Figure 10 3 Conceptual Local Unpressurized Rover 1 2 3Large Pressurized Rover The final rover to be covered is the Large Pressurized Rover LPR Two LPRs will be brought to the surface on the first cargo carrier It should be noted that any EVA aspects of this rover are discussed in the EVAS section of this paper The LPRs will have a few critical responsibilities that must be carried out before the first crew arrives including site preparation moving deploying and inspecting the habitat s infrastructure and connection and inspection of the ISRU and power plant This will be done with 2 mechanical arms shown in Figure 10 4 and a powerful locomotive system With all of these task being performed with out the assistance of EVA crews the LPR will be able to be fully automated but will also have tele robotic capabilities The LPR will interface with the habitat directly though this is mostly for EVAS concerns Other interfaces will involve the transfer of data including telemetry audio and video Figure 10 4 Conceptual Mechanical Arm for the LPR 1 2 4Small Rover Sizing The small rover s power requirements were sized using from the Mars Exploration Rover using a power to weight ratio The MER uses 1 kW and weighs 180 kg and the small rover is sized at 440 kg from the DRM This results in 244 kW of power for the small rover A 25 safety factor was then added to this for a total of 3 kW 1 2 5Medium Rover Sizing The medium rover s power requirements were calculated using the same method except with the large pressurized rover as a reference The large rover was allocated 10 kW from the DRM and weighs 15 5 metric tons Using these numbers the power for the medium rover was calculated to be 2 8 kW However a certain percentage of this power is used for life support systems on the pressurized rover and does not need to be incorporated into the power requirements for the medium rover which does not need to support any life support systems In order to account for this the power requirement was reduced by 30 A 25 safety factor is still factored in though for a total of 2 5 kW 1 2 6Large Rover and Arm The power requirements and the weight of the large pressurized rover were both specified in the DRM at 15 5 metric tons and a 10 kW power requirement A significant portion of this power will be used to power the two arms on this rover The exact power requirements on these arms are difficult to size due to tasks needing to be specified Existing arms such as the ones on the ISS use 2000 W at peak power but also operate in a zero g environment However this arm is also able to move the entire orbiter at slow rates It is likely that the arms on the pressurized rover will use similar power based on the total power of the large rover An initial estimate of the power for these arms is 2 5 kW based on Mars gravity and max loads of moving the airlocks and reorienting the habitat 1 2 7Sizing of Leveling and Radiator Deployment Systems For the tasks of initial leveling of the habitat and radiator deployment research was conducted on existing commercial off the shelf technology for mass power and volume estimates The initial leveling of the habitat will require 12 linear actuators with two on each of the six legs for redundancy purposes The actuators have 720 mm of travel and can produce a total force of 50000 N Their mass is 60 kg each for a total mass of 720 and they use 35 watts each Any increase in the amount of travel will result in a slight increase in mass For deployment of the radiator panels 8 total actuators will be used with 2 on each of the panels The actuators have 1 m of travel and produce 7500 N of force Their mass is 9 kg each for a total mass of 72 kg and each uses 5 watts of power 1 2 8Automated Systems The following are examples of items that will also be automated on the habitat Similar actuators motors and servos will be incorporated and sized based on the size of the task Automated doors in case of depressurization Deployment of communications hardware External monitoring equipment Deployment of radiator panels Leveling of habitat Compaction of waste Deploy airlock Connection of power plant to habitat and ISRU Connect ISRU to habitat Inspection and necessary maintenance of habitat and ISRU Assumptions small automated processes such as gas regulation will be taken care of by their subsystem 1 3Verification of Requirements 1 3 1Requirements Verification All of the following requirements that were specified in the original requirements document for the robotics and automation subsystem were met with the exceptions explained later These include requirements that the small rover will be used to meet such as deploy scientific instruments provide method of sample acquisition determine safe routs for crew travel and be used as a communications relay in contingency situations The requirements that the large rover will be used to meet are site preparation deploy move and reorient infrastructure inspect infrastructure shall support EVA activity will connect directly to habitat and connect power plant ISRU and habitat to each other The requirements that the medium rover will meet are must provide for local transportation must be recharged via external male female cable charge discharge cycle must be less than one day There are also some general requirements that all the rovers must meet these include robotics shall operate through entire mission duration robotics shall support control and communication telerobotic or fully autonomous based on mission robotics shall meet all fault tolerances and safety standards robotics shall meet all size and weight restrictions and robotics shall support payload operations There were several requirements for the automation systems that were met these include equipment shall meet thermal loading tolerances shall support power requirements must deploy and operate various mechanisms on the habitat Time consuming and monotonous activities will be automated The requirements that were not explicitly met were the ones that involved the design of the rovers Since the design of the rovers was not included in the project and only the interface of the rovers was designed these requirements were assumed to have been met by the rover design teams Another requirement that was not completely met was the requirement to automate all monotonous tasks This was not met because at this stage in the design all of those tasks are not known 1 3 2Why Use Robotics With everything that can go wrong with robotics and the complexity involved there may be a point where a human EVA would be a better alternative In this situation there are several areas that should be considered The first of these is safety of the crew When an EVA is done the safety of the crew is at a much larger risk than it would be if a robot did the task a robot is much easier to fix than a human being The second consideration is wear and tear on suits The more EVAs are done the more wear the suit is subjected too This has two repercussions the first is that more time and resources must be allocated to repairing the suits The second is the higher risk of a suit failing outside due to the higher amount of use the suits will be seeing One last consideration is that robots are good for repetitive activities especially in a hazardous environment EVAs for repetitive tasks are more dangerous due to the fact the astronauts get accustomed to the task and will start cutting corners and getting sloppy with the task This increases the danger of the task and puts the astronaut at greater risk 1 3 3Future Considerations There are several areas that need to be addressed for the future devolvement of this project The first of these is that more complete design specifications for the rovers are needed The hatch for the large rover needs to be designed which will require dimensions from the large rover design teams Efficiencies for the recharging rate on the medium rover needs to be specified to the recharge time can be better calculated Data rates need to be specified for all three rovers so that antennas can be sized and power requirements can be determined As the project progresses each of the subsystems will have a better idea of what tasks they need
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 国家事业单位招聘2025中国农科院质标所招聘笔试历年参考题库附带答案详解
- 四川省2025年上半年四川广安市前锋区“小平故里英才”引进急需紧缺专业人才公笔试历年参考题库附带答案详解
- 南京市2025江苏南京科技职业学院招聘工作人员18人(第一批)笔试历年参考题库附带答案详解
- 会昌县2025江西赣州市会昌县住房保障安置服务中心招聘1人笔试历年参考题库附带答案详解
- 中山市2025广东中山市小榄镇高级专业人才招聘4人笔试历年参考题库附带答案详解
- 2025陕西电子信息集团光电科技有限公司招聘笔试参考题库附带答案详解
- 2025辽宁沈阳市浑南区森工林业集团有限公司招聘65人笔试参考题库附带答案详解
- 2025福建福州市建筑设计院有限责任公司招聘22人笔试参考题库附带答案详解
- 2025湖南省低空经济发展集团有限公司招聘11人笔试参考题库附带答案详解
- 2025浙江宁波市象山县水务集团有限公司第二期招聘4名笔试参考题库附带答案详解
- 半导体semi F81 中文版
- 《电力建设工程施工安全管理导则》(NB∕T 10096-2018)
- 外包与合作管理制度
- 广东开心学英语三年级下册Unit3-My-room
- JJG 425-2003水准仪
- 自动驾驶汽车-课件
- 2023年安康市交通建设投资集团有限公司招聘笔试题库及答案解析
- 学生学习力评价量表
- 藏餐培训教学计划5篇
- 技术需求征集表
- 三年级上册美术课件-第1课 五星红旗我为你骄傲|辽海版
评论
0/150
提交评论