




已阅读5页,还剩7页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除 02 Rev.Date Compiled byReview APPROVAL 消防系统管道安装 INSTALLATION OF PIPELINES FOR FIRE PROTECTION SYSTEM Document NoMTP-0-SEPC-COM-WI-0128 PROJECT赞比亚马安巴 2150MW燃煤电站项目300 MW(2150MW) Coal Fired Power Plant at Maamba, Zambia OWNEROWNERs ENGINEER EPC CONTRACTORCONTRACTORs ENGINEER精品文档1 工程概况Project Overview 赞比亚MCL 2150MW循环流化床燃煤电厂,位于赞比亚南方省马安巴煤矿区。消防系统分室外消防工程、水喷雾灭火系统、自动喷水灭火系统、水幕系统、消火栓灭火系统、手提式或移动灭火器灭火系统、泡沫灭火系统、低压CO2灭火系统、IG541灭火系统。管道采用焊接、沟槽、螺纹三种连接方式。The Zambia MCL 2x150MW circulating fluidized bed combustion power plant is located in the Maamba coal mining area, Southern province of Zambia.Fire fighting system includes outdoorfire protection engineering,the water spray fire extinguishing system,automatic sprinkler system,water curtain system,fire hydrant system,portable or mobilefire extinguishersystem,foam fire extinguishing system,low pressure CO2 fire extinguishing system,IG541 fire extinguishing system.Pipes by welding,ditch groove,threadthree connection ways.2.编制依据Reference2.1山东电力咨询院相关图纸;Related drawings provided by Shandong Electric Power Engineering Consulting Institute Corp. Ltd;2.2给排水管道工程施工及验收规范GB50268-2008;Water Supply and Sewage System Construction and acceptance GB50268-2008;2.3火力发电厂焊接技术规程DTL869-2012;The code of welding for power plant DTL869-20122.4电力建设施工技术规范 ( 第5部分:管道及系统) DL 5190.5-2012 ; Technical Standard for Thermal Power Erection and Construction Part5:Pipingsystem DL 5190.5-2012 ; 2.5自动喷水灭火系统施工及验收规范GB 50261-2005;The automatic sprinkler system construction and acceptance standard GB50261-2005;2.6气体灭火系统施工及验收规范GB50263-2007;GB50263-2007;2.7泡沫灭火系统施工及验收规范GB 50281-2006;2.8电力建设安全工作规程 第1部分:火力发电厂DL5009.1-2002; DL5009.1-2002 ;3. 施工准备Construction Preparations3.1主要工器具及机械列表:Table for the main equipment and machinery:序号 名称 规格 单位 数量1 汽车吊Crane truck 25t台 set12 拖车Trailer truck 30t台set13 电焊机Electric welder Electric welderwelder台set6 4 倒链Chain block 5t个set35 倒链Chain block 1t个set46角向磨光机Edge polisher 100mm台set57 气割工具Gas cutting tools套set48 水平尺 level bar L=600mm49 管钳pipe pliers1210 电动套丝 Electric threading machine 台set 111 压槽机 Notching-machine台set13.2劳力组织工种Worktype管理Supervisor技术员Technician安装工Erector起重工Rigger电焊工welders辅工General workers人数Number 1 2141643.3计划工期本项目施工工期计划为171天,开工时间2014年11月15日,结束时间2015年5月4日。The projectconstruction periodis planned for 171days,beginning on November 15, 2014,May 4, 2015the end oftime.4. 施工作业方案Construction Scheme根据现场情况,分区域施工。各种钢管分别采用焊接、沟槽、螺纹连接的方法进行施工。具体施工顺序:穿墙或楼板位置开洞、支架制作、安装下管钢管焊接、开孔、套丝清理管膛管口将管道吊放于支架上管道连接管道固定、套管安装检查水压试验管道冲洗喷头安装。 According to the scene situation, construction at the difference region. A variety of methods were used steel pipe welding, ditch groove, threaded connections for construction. Concrete construction order: openings in wall or floor,support make and installationsteel pipe welding,opening and mantle fiberclean pipelinepipeline installationinspecthydrostatic testpipe cleaningnozzle installation.5 施工工艺流程Construction process5.1根据图纸在穿墙及楼板位置开洞Open holes in the wall and floor position according to drawings5.2支架制作、安装:根据设计要求将支架统一在制作场地进行制作,将制作合格的支架安装在设计位置。Support make and installation: According to the design requirements will make the support at working area ,making qualifying bracket installation in design position.install the qualified support in design position.5.3钢管安装Pipe installation5.3.1根据图纸的尺寸进行直管段的下料以及三通的现场制作。According to the dimensions of the drawing the straight pipe blanking and tee production on spot.5.3.2运输时注意防止损伤沟槽和螺纹。Attention to prevent grooves and thread damaged during transportation 5.3.3对接管或与设备的连接管内应清洁,无杂物,施工过程注意管道封堵。The butt joint pipes or those connecting with the equipment should be cleaned; should not have any sundries,pipeline attention plugging at construction .5.3.4消防管道与其他管道交叉时,敷管原则为无压管让压力管,小管让大管。Fire Services pipe and other pipe when it crosses,pipelaying principles pressure pipes for non-pressure pipes,small pipe give way to big pipe.5.3.5管道对口焊接应自然、平滑,不得强行对口;管子与设备的连接应在设备安装定位后进行,且不允许有应力对口。The welded joints of pipe counterparts should be natural, smooth without forcing matters; the pipes should be connected to equipment after equipment has been installed and fixed; also, no stress is allowed on counterpart joints5.3.6管子对口内壁要平齐,对口间隙为2mm4mm,局部错口最大值1mm。The interior of the pipeline counterpart joint should be smooth and neat with a space of 2mm-4mm;Partial misalignment the maximum value 1mm5.3.7管子或管件的坡口及内、外壁5-10mm范围内的油漆、垢锈等,在对口前应清除干净,直至显示金属光泽。坡口角度为3035,避免在焊接过程中移动;管道在穿过隔墙的管段不得有接口。The pipeline or its components s slope and the internal and external wall should be in the range of 5-10mm of the paint, rust etc. Before pairing, clean them to expose the metallic luster. The slope angle should be 3035 to prevent shifting during welding; on the section where the pipe is crossing a wall, no joint is allowed.5.3.8管道采用V型坡口,采用电焊焊接,管道及管件的焊缝不应有漏焊、气孔、裂缝、砂眼和焊穿等缺陷。The V-groove pipe, using welding welding, pipe and pipe fittings weld seam should not be tainted welding, pores, cracks,sand holes and welding worn and other defecs.5.3.9焊接完成后,将焊口清理干净。室外消防管道要在水压试验合格后进行防腐验收。经验收合格后管道位置回填。After welding is completed,clean up the weld . Outdoor fire pipeline needs to be done after water pressure test qualified anticorrosion acceptance.After passing the acceptance Pipe position backfilling.5.3.10管道套丝要求:板牙规格与管件内牙规格一致,管道套丝长度及牙数管件内牙数,套丝要跟着机器平稳移动,切勿增加外力。Pipethreadingrequirements: Diespecificationsand fittingswithin the tooth specifications pipeline is sheathed wire length and tooth number greater than or equal to the inner pipe fitting teeth number , sets of silk to follow the machine move smoothly, do not increase the external force.5.3.11管道安装根据不同规格、壁厚、材质管道套丝质量、套丝深浅情况,连接部位采用生料带填充、密封胶填充、液体生料带填充、麻丝与白灰漆粘合填充的四种施工工艺,确保安装一次合格。Pipe installation according to the different sizes, thickness, depth of material quality pipe threading, threading, connecting parts with Teflon tape sealant for filling, filling, liquid filled with uncooked materials, flax and four construction technology of lime-filled paint adhesion, ensure that it has qualified for the first time.5.3.12管道工作压力0.1MPaP1.6MPa。Pipeline working pressure is 0.1MPaP1.6MPa.5.4阀门及喷林设备安装Valve and spray equipment installation.5.4.1阀门型号规格符合设计要求,有合格证。Valve specifications comply with the design requirements, have a certificate of approval.5.4.2湿式报警阀组和雨淋阀组应安装在便于操作的明显位置。室外湿式报警阀组应该安装湿式雨淋阀室内。Wet type alarm valve and deluge valve unit shall be installed in the obvious place to operation.outdoor wet type alarm valve system should in house.5.4.3水流指示器应竖直安装在水平管道上侧,其动作方向应和水流方向一致。Water flow indicator should be mounted vertically on the side of the level pipe, its movement direction and the flow direction should be consistent.5.4.4喷头安装应在系统试压、冲洗合格后进行,安装应使用专用扳手。支吊架不得影响喷淋效果。Nozzle isinstalled in thesystempressure test andflushingafter qualifying,setup should usespecial wrench,hangershall not affectthe effect of spraying. 5.5消火栓和消防炮安装Fire hydrant and fireartilleryinstallation5.5.1消火栓型号规格符合设计要求。Hydrant model specifications comply with design requirement. 5.5.2消火栓口离地面距离为1.1m。Hydrant port height to the ground about 1.1m.5.5.3消防箱采用明装形式,明装时箱门应便于开启。Hydrants using surface mounted forms, should be easy to open the door when surface mounted.5.5.4水龙带与水枪和快速接头绑扎好后,应根据箱内构造将水龙带挂放在箱内的挂钉、托盘或支架上。Hose, gun and after a good lashing quick connector, the box should be constructed in accordance with the water hose hanging on pegs on the inside of the tray or holder.5.5.5栓口应朝外,并不应安装在门轴侧。Hydrant mouth should outwards and should not be installed in the door shaft side.5.5.6固定式消防炮的立管应垂直安装,炮口应朝向防护区。The stand pipe of fixed firegunshall be installed vertically,the muzzle should betoward theprotection zone.5.5.7室外消火栓的大口径出液口应朝向消防车道。Outdoor fire hydrant large-caliber the liquid outlet should be directed to fire channel.5.6水压试验Pipe hydrostatic tests5.6.1管道水压试验在管道安装完后,根据不同的试验压力进行水压试验。Pipelinehydrostatic test after pipeline installed.According to different test progressive hydrostatic test.5.6.2水压试验应注意不参加试压的管口封堵和设备阀门的关闭,试验管道系统和设备的中间控制阀门应全部开启。Hydrostatic test should be careful not participate nozzle plugging and equipment valves closed, intermediate test piping systems and equipment control valve should be fully open.5.6.3压力试验介质:纯净的水,在系统灌水充水过程中,管网内的气体将被驱到管网的最高点(排气阀处)待试验管道系统和设备水注满后,关闭阀门,稳定半小时后继续向系统注水,以排气阀门出水无泡为准,关闭排气阀。Pressure test medium: pure water, In the system of irrigation during water filling,when the gas of pipe network will be drive to the highest point of pipe network ,close the valve . stabilityhalf an hour continuing water injectiontill no bubble in exhaust valve water-exit. close the exhaust valve.5.6.3当试验过程发生泄漏时,不得带压处理,消除缺陷后,应重新进行试验。When leakage occurs during the test, processing not with pressure,after eliminate defects, should be re-tested.5.6.4管网在试验压力下停止的时间不宜过长,不得进行超压试验,必须严格按试压方案中规定的数值进行水压试验。Pipe network under test pressure to stop the time not too long, can not be over pressure test, pressure test must be strict accordance with the value specified in the program hydrostatic test.6.安全注意事项Safety Precautions:6.1所有施工人员需经过体检、安全教育考试合格取证后方可进入施工现场;项目施工前必须进行安全技术交底后再进行施工。All the workers must undergo physical examination and safety induction exercise which shall require a pass to be certified fit for work; prior to construction works, all those involved shall undergo safety and technical clarification.6.2进入施工现场必须正确佩戴安全帽,严禁酒后进入施工现场。When entering the site, one must put on a proper safety helmet; its strictly prohibited to enter the site after consuming alcohol.6.3设备及管道起吊过程中,必须有专人指挥,起动平稳,信号明确。管子运输过程中,必须封车牢固,不得超载,并且有专人监护。During hoisting of equipment and pipeline there must be an expert instructor, a stable starter with clear and definite signals. During transportation of pipes, they should be properly secured without overloading. A person shall be specially assigned to monitor the load.6.4现场使用的电源必须有持证专业电工来拆接,其他人员不准私自操作,现场所有设备必须接地良好,并设漏电保护器。All the power used on site must be connected only by a certified electrician; all the equipment must have proper earth connection and also establish a power leakage arrester.6.5电气焊作业时要检查作业点周围10米内是否有易燃易爆物品,如有,应及时清除或加以保护。During electric or gas welding works, ensure that there are no flammable materials within a 10 meters working radius. If discovered have them removed or make addition protective measures.6.6在进行气割、气焊时,作业人员要戴好防护眼镜。During gas cutting or welding, the operator should wear protective goggles6.7使用起重设备时,使用前要先仔细检查是否完好,不合格者不准使用,且使用时不准超负荷,吊装区域严禁无关人员进入。Check the lifting equipment before use to ensure that they are in good working condition. Those found with faults and which do not pass the checks should not be used. Also, do not overload,the hoisting area it is forbidden to irrelevant personnel to enter.6.8现场物料要堆放整齐,现场电源线及焊线拉设规范,施工垃圾要及时清理,现场保持文明, 整洁。The materials on site should be orderly piled; the power and welding lines should be set up within specifications; the garbage shall be disposed of properly and promptly to maintain good housekeeping of the construction site.6.9用倒链前应检查吊钩、链条等是否良好,链条直径磨损量达15%时严禁使用。Before using the chain block, inspect the hook, the chain etc to ensure that they are in good condition. If the abrasion of the chain reaches 15% of its diameter, it must not be used for any lifting works.6.10夜间施工加强防蚊虫措施,以免蚊虫叮咬。During night shifts, r
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年现代农业装备采购及操作培训与市场拓展框架合同
- 2025年导演聘用及影视作品版权全面保护与推广服务合同
- 2025年社区食堂运营维护及食品安全保障服务协议
- 2025年新型生态停车场绿化工程设计与施工监理合同
- 2025年绿色低碳商业综合体主体施工与节能降耗合同
- 2025年度高端医疗设备全国代理销售合作协议范本
- 2025年绿色物流园区场地租赁及配套设施使用合同
- 2025年影视剧本改编及全息投影技术特效研发合同
- 2025年智慧型宾馆客房节能减排技术集成服务协议
- 2025年度茶叶品牌推广与市场销售代理合作协议
- 降低住院病人胃管非计划拔管率不良事件RCA分析PDCA改善报告
- 轴承装配组装SOP
- 物业管理委员会组建运行办法
- 屋顶分布式光伏发电项目光伏组件技术规范书
- 过敏性休克完整版本
- 《大学美育》高职全套教学课件
- 少儿成语双语故事:画蛇添足
- JJF(建材)171-2020 勃氏法透气仪校准规范-报批稿
- 小学必背古诗词182首(带目录及释义)人教(部编版)
- 人教版小学数学一年上册《1-5的认识》说课稿(附反思、板书)课件
- 透析患者血管通路的维护
评论
0/150
提交评论