全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Gear Reducer Mud Agitator Instruction Manual1 Functions and features Gear reducer mud agitator is one new-type efficient, energy-saving agitator for drilling mud fluid mixing and other solid-fluid mixing. It has small profile, steady running, easy field installation, efficient mixing, good mixing result and high standby power. So it is suitable for high density mud. Energy can be saved by selecting right power of different agitators according to the mud condition and tank dimensions. 2 Technical datas:ItemModelMotor power(kw)Vane rotating speed(rpm)Vane diameter(mm)Environmental temperature()Reducer temperature rise()NJ-33102500-404540NJ-5.5Y5.585750-404540NJ-7.5Y7.585800-404540NJ-11Y1176500/800-404540NJ-15Y1585500/850-4045403 Installation and Use3.1 Cut a hole200mm on vane axle where install the agitator, place agitator and weld 8# channel steel on its base with tank surface, then unscrew the foot screw, lift reducer, and take vane axle from tank, connect vane axle with reducer output axle with screws, at last connect reducer and base with screws.3.2 Add the extreme-pressure gear oil 130-160EP into reducer to the standard position (oillet).3.3 Test running with electricity until getting stable running without noise and correct rotating direction.4 Notes:4.1 Add the extreme-pressure gear oil 130-160EP into reducer to the stated position and lubricate in accordance with dipstick. Replace lube every 8000 hours.4.2 The connecting screws should not be loose. Check screws after running for certain period and tighten the loose screws. 4.3 In transport and installation, protect vane axle from affecting use caused by knocking and deforming.4.4 The vane axle rotating direction: clockwise from top.4.5 The tank surface board should be strong enough to prevent agitator from effecting reducer running normally and service life caused by shaking.4.6 Uninstall the vane axle or install an auxiliary support of vane axle in moving agitator and tank as a whole.4.7 Wash the mud accumulation away around vane axle with mud gun to prevent from the motor burn out result from too big start up load before restart agitator.5 Disassemble and maintain reducer (11kw, 15kw)5.1 Wearing parts list and replace dateWearing partsmodelOil sealChange lubespecChange cycleReducer (KL87)85130121 year5000h or18 months8511012Motor 11KW456585.2 Disassemble and change instruction5.2.1 Screw off oil plug of reducer,drain all the lube in the body.5.2.2 Unscrew the bolts connecting reducer and motor, and the bolt 33 fixed back cover 9. Then disassemble reducer and its back cover, look at the inside structure and clean the broken asbestos paper.5.2.3 Disassemble the output shaft: Unscrew 34, 35 bolts, remove the output flange 10 and steel cover 32 on the output shaft, and retaining ring 19 and gasket 13. Then fill up the reducer with shaft 7 adown. Fill wood block between the big gear and reducer body, remove the output shaft at steel cover 32, and install new bearing to replace the old one. If only to change the disabled oil seal, do following this: disassemble the output flange, remove the disabled oil seal, and review hole surface there and seal packing of fitting surface. If there is no breakage, fix the output flange to the old place, screw up the bolts after cleaning the glue. If the output shaft at the place of oil seal has scar, make good with fine sand paper to avoid oil leaking. When oil seal is passing the output shaft, fill up plastic underlay to protect the lip. Take out the underlay after oil seal placed. Adjust the seal and flange hole for face to face, knock around it into the hole lightly with a small hammer.5.2.4 Disassemble the third class gear shaft: screw off the bolt 36, take down the second steel cover 14, get the sprag17 for hole and spacer 12, then fill up a wood block, extrude the third class gear shaft with hydraulic machine.5.2.5 Disassemble the spiral bevel gear: make the reducer vertical with import department
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年电商直播平台业务拓展项目可行性研究报告及总结分析
- 2023年颍上县材料员考试题库及答案一套
- 2025年台州市仙居县保安员招聘考试题库附答案解析内部题库
- 2025年民宿体验式服务协议
- 2025年智能穿戴行业智能穿戴设备创新与智能健康功能研究报告及未来发展趋势
- 2025年智能制造及产业升级项目可行性研究报告及总结分析
- 2025年智能硬件研发与制造项目可行性研究报告及总结分析
- 2025年航空航天模型加工(多工序数控机床操作调工)理论知识考试题-含答案
- 绵阳市涪城区考核招聘教师考试真题及答案2022
- 2025年3D打印技术应用研发可行性研究报告及总结分析
- 2025年公安局工作总结(汇报报告)
- 2025EAU指南:上尿路尿路上皮癌(更新版)课件
- 2025年生态农业企业有机农业生产模式实施方案
- 国企企划专员考试题库及答案
- 2025国职五级考试题库及答案
- 隧道照明施工组织方案
- 2025年《黄帝内经》知识大赛典型题目及参考答案
- 2025福建省乡总海洋科技有限公司招聘4人考试笔试备考题库及答案解析
- YY/T 0648-2025测量、控制和实验室用电气设备的安全要求第2-101部分:体外诊断(IVD)医用设备的专用要求
- 专题78 人教版高中英语选择性必修二词汇表背默版-2026年高考英语一轮复习知识清单
- 项目实施团队组建与人员配置方案
评论
0/150
提交评论