




免费预览已结束,剩余1页可下载查看
Optimization of Gate, Runner and Sprue in Two-Plate FamilyPlastic Injection Mould..pdf.pdf 免费下载
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Optimization of Gate, Runner and Sprue in Two-Plate Family Plastic Injection Mould M.A. Amran*, M. Hadzley, S. Amri, R. Izamshah, A. Hassan, S. Samsi, and K. Shahir 1Faculty of Manufacturing Engineering, Universiti Teknikal Malaysia (UTeM), Locked Bag 1200, Hang Tuah Jaya, Ayer Keroh, Melaka, Malaysia *Email: .my Abstract. This paper describes the optimization size of gate, runner and sprue in two-plate family plastic injection mould. An Electronic Cash Register (ECR) plastic product was used in this study, which there are three components in electronic cast register plastic product consist of top casing, bottom casing and paper holder. The objectives of this paper are to find out the optimum size of gate, runner and sprue, to locate the optimum layout of cavities and to recognize the defect problems due to the wrong size of gate, runner and sprue. Three types of software were used in this study, which Unigraphics software as CAD tool was used to design 3D modeling, Rhinoceros software as post processing tool was used to design gate, runner and sprue and Moldex software as simulation tool was used to analyze the plastic flow. As result, some modifications were made on size of feeding system and location of cavity to eliminate the short- shot, over filling and welding line problems in two-plate family plastic injection mould. Keywords: Computer Modeling; Flow Simulation; Optimization PACS: 07.05Tp 1. INTRODUCTION The plastic injection generally has three phase processes comprising filling, packing and cooling phases. The introduction of simulation software has made a significant impact in the mould making industry with the increasing use of computers in design engineering, the amount of commercially available software on the market has also increased 1. The ECR plastic product uses same material and colour, however different size of part. Each part has it own mould but on this research, all the parts used family mould. The difficult stage to design family mould is to decide the mould layout, injection location, size of gate, runner, sprue and location of water holes 2, 6, 7. To investigate the flow behaviour the Moldex software as simulation software was used to analyze the plastic flow. 2. METHODOLOGY This study started from design 3D modeling of ECR product using Unigraphic software and then the files were transferred into Rhinoceros software for post processing. In Rhinoceros software the feeding system such as gates, runners, sprues, 309 CREDIT LINE (BELOW) TO BE INSERTED ON THE FIRST PAGE OF EACH PAPER CP1217, International Conference on Advancement of Materials and Nanotechnology 2007 (ICAMN 2007) edited by W. T. Wui, N. Kamarulzaman, R. Y. Subban, K. Noorsal, M. H. Saleh, R. Ibrahim, R. Idris, I. Zainol, and F. A. Zakaria 2010 American Institute of Physics 978-0-7354-0760-2/10/$30.00 waterholes and mould base were designed. Finally, Moldex software is used by importing file from Rhinoceros software. Plastic materials, processing conditions were decided before filling, packing, cooling and warpage analysis. If results do not satisfy, the modification will be done again as shown in Figure 1. E n d In te r p e re t d a ta A is surface area of cavity (mm2) and n is material constant. From calculation surface area of top casing is 84,648 mm2, the width is 5.8 mm. Further calculation, bottom casing width is 5.9 mm and paper holder is 1.27 mm. 3.2 Circular Runner Diameter runner was calculated by taking the weight of part from volume multiply density and distance part from centre of mould as equation 2 4. D = W x L / 30 (2) Where, D is runner diameter, W is part weight and L is distance part to centre mould. Volume of top casing was taken from Rhinoceros software is 78,202 mm3 and the weight is 0.08 kg so the diameter of runner is 6.5 mm. Further calculation, the diameter of bottom casing is 6.7 mm and paper holder is 1.5 mm. 3.3 Sprue The sprue size was decided by taking the thickness cavity plate mouldbase and given angle one degree from diameter 7 mm. Initial cold slug well is 7 mm and base cold slug well is 10 mm. Figure 3 shows the location of top casing, bottom casing and paper holder together with feeding system. FIGURE 3. Layout of two-plate mould. 311 4. FILLING ANALYSIS OF TWO PLATE MOULD Result from filling analysis shows that the total filling period is 1.041 seconds. At the stage, 100% there were two results where the top casing was short shot and the plastic cannot flow to the impression of paper holder as shown in Figure 4. FIGURE 4. Filling process The top casing was redesigned because of the meeting area of flow front situated at side body, as result a welding line was developed on that area as shown in Figure 5. Welding line is the result of a flow front, which easily breaks up into two separate parts. When the two fronts meet, they try to welding back together again so as result form a single front line which it can be easily broken down 5. FIGURE 5. Welding line at top casing 4.1 Modification on Two-Plate Mould Modification was done on gate of bottom casing by decreasing 25% from 5.9 mm to 4.3 mm and runner from 6.7 mm to 5 mm due to over filling. Location of paper holder was moved from 50 mm from center of mould to 25 mm and increase runner size by 25%. A set of groove was added on surface of top casing to ensure the plastic flow toward corner of top casing as shown in Figure 6. FIGURE 6. Modification of Two-Plate mould. 312 4.2 Filling process after Modification Result from filling analysis after modification shows the melt of plastic of three components were balance on each other. The total filling melt front time is 7.804x10-1 seconds. The welding line has been eliminated on the centre side body of top casing and as result melt plastic flows towards on the corner as shown in Figure 7. FIGURE 7. Filling process after modification 5. DISCUSSION The size of runner of paper holder was increased and shifted to eliminate the unfilling. Gate and runner of bottom casing were decreased due to the over filling. Top casing was redesigned by adding a set of groove on the top surface of top casing to eliminate the welding line. As the result the welding line on centre side body of top casing was eliminated. From results it was found that the size of gate and runner in two-plate mould for paper holder increased by 25% due to the short shot problem and gate and runner for bottom casing reduced by 25% due to the over filling. 6. CONCLUSION This study was success on analyzing the flow of plastic materials in two-plate mould. The modifications was done on layout of cavities and feeding system as result improved the quality of the product. Furthermore, the defects of plastic product on short shot, over filling and welding line were eliminated before the actual mould is fabricated. REFERENCES 1. S.S.S. Imehezri., S.M. Sapuan, S. Sulaiman, Journal Material and Design, volume 26, pp. 157 166, 2005. 2. L.T. Manzione, Applications of Computer Aided Engineering in Injection Molding, Hanser, New York, 1987. 3. R.G.W. Pye, Injection Moulding Design,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 汽车品牌忠诚度分析-洞察及研究
- 2025年护士执业资格考试妇产科护理学专项题库:孕期营养护理要点试题
- 2025年消防执业资格考试题库:消防技术规范修订案例分析试题
- 2025-2030工业元宇宙应用场景开发与商业模式探索研究报告
- 2025-2030工业互联网平台赋能制造业数字化转型的实践案例深度剖析
- 2025-2030工业互联网平台行业发展分析及投资价值评估报告
- 2025-2030工业互联网平台生态构建与垂直行业解决方案价值报告
- 2025-2030工业互联网平台标准化建设与生态构建策略
- 2025-2030工业互联网平台服务模式创新与市场增长预测报告
- 2025-2030工业互联网平台数据中台架构优化与行业解决方案报告
- 工具式型钢悬挑脚手架施工工法
- GB/T 9113-2010整体钢制管法兰
- GB/T 3792.1-1983文献著录总则
- GB/T 32465-2015化学分析方法验证确认和内部质量控制要求
- GB/T 26567-2011水泥原料易磨性试验方法(邦德法)
- 西师版三年级上册四则混合运算形成性测试题
- 企业知识产权管理中的专利挖掘工作概述课件
- 【高等数学练习题】兰州交通大学专升本自考真题汇总(附答案解析)
- 【完整版】锁骨骨折护理查房课件
- 在商会中秋团圆会上的讲话
- 大学信息系统建设与运行维护管理办法
评论
0/150
提交评论