1、国际工程管理实务与翻译(04)第04讲作业实用材料翻译英译中The submissi on of the Ten der of the bidder in dicate, in itself, a determ in ati on and agreeme nt: the Owner shall not bear any costs and charges in curred by the bidder un der any con sideratio n, in any eve nt, irrespective olsuch costs and charges are in curred di
2、rectly by the bidder or by other pers ons on behalff the bidder; irrespective ofwhe n such costs and charges are incurred in the preparation or submission ofhe Tender, or in the negotiation with the Owner on the Conditions and Clausesin this Tender after submission of this Ten der, or in the n egoti
3、ati on with Owner on the Con diti ons and Clauses in this Con tract, or further negations on other matters caused by or related to the negotiation or this project.中译英1此外,业主可以在按标书规定将合同授标以前和在施工许可证签发以前,发包开 挖、打桩、和其它土石方工程。可能要求承包商承担发包的土石方工程或者准备好 承担发包的土石方工程,并且/或者接管上述土石方合同下的责任和义务。2此外,任何情况下合同中的合同总价或者任何单价都不得因
4、材料、设备或者人工 价格上涨而变动。材料、设备和人工价格的任何增加已经反映在在投标的时候提交 的工程量清单里了。FIDC翻译3The Engin eer工程师3.1 Engineer s Duties andoAuyhThe Employer shall appoint the Engineer who shall carry out the duties assigned to him in the Con tract. The Engin eers staff shall in clude suitably qualified engin eersa nd other professi o
5、n als who are compete nt to carry out these duties.The Engin eer shall have no authority to ame nd the Con tract.Engin eerThe Engineer may exercisethe authority attributable to the Engineer as specified in or n ecessarilyto be implied from the Con tract. If the Engin eer is required to obtai n the a
6、pproval of the Employer before exercis ing a specified authority, the requireme nts shall be as stated in the Particular Con diti ons. The Employer shall promptly inform the Con tractorof any change to the authority attributed to the Engineer.However, whenever the Engineerexercises a specifiediuthor
7、ity for which the Employers approval is required, the n (for the purposes ofhe Con tract) the Employer shall be deemed to have give n approval.Except as otherwise stated in these Con diti ons:(a) whe never carry ing out duties or exercis in gauthority, specified in or implied by the Con tract, the E
8、ngin eer shall be deemed to act for the Employer;(b) the Engineer has no authority to relieve either Party of any duties, obligations or resp on sibilities un der the Con tract; and(c) any approval, check, certificate, consent, exam in ati on, i nspecti on, in structi on, no tice, proposal, request,
9、 test, or similar act by the Engin eer (in cludi ng abse ncdsisrfpproval) shall not relieve the Con tractor from any resp on sibility he has un der the Con tract, i ncludi ng resp on sibility for errors, omissi ons, discrepa ncies and non-complia nces.(d) Any act by the Engin eer in resp onse to a C
10、on tractors request except otherwise expressly specified shall be no tified in writi ng to the Con tractor withi n 28 daysreceipt.The follow ing provisi ons shall apply:The Engin eer shall obta in the specific approval ohe Employer before tak ing acti on un der the followi ng Sub-Clauses ofhese Con
11、diti ons:(a) Sub-Clause 4.12: Agreeing or determining an extensiortiofe and/or additional cost.(b) Sub-Clause 13.1: In struct ing a Variati on, except;(i) in an emerge ncy situati on as determ ined by the Engin eer, or(ii) if such a Variati on would in creasethe Accepted Con tract Amount by less tha
12、 n the perce ntage specified in the Con tract Data.(c) Sub-Clause13.3: Appro ving a proposal for Variati on submitted by the Con tractor in accorda nee with Sub Clause 13.1 or 13.2.(d) Sub-Clause 13.4: Specifying the amount payable in eacthofapplicable currencies.Notwithsta nding the obligati on, as
13、 set out above, to obta in approval, if, i n the opiniontoe Engineer, an emergency occurs affecting the safety ofe or of the Works or of adjoining property, he may,without relievi ng the Con tractor of any of his duties and resp on sibility un der the Con tract, in struct the Con tractor to execute
14、all such work or to do all such things as may, in the opinion of the Engineer, be necessaryto abate or reduce the risk. The Con tractor shall forthwith comply, despite the abse nee ofapproval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the
15、Con tract Price, in respect ofsuch in structi on, in accorda nce with Clause 13 and shall no tify the Con tractor accord in gly, with a copy to the Employer.讲义Employer2.2 Permits, Licences or Approves许可、执照或批准The Employer shall (where he is in a positi on to do so) provide reas on able assista nce to
16、 the Con tractor at the request ofthe Con tractor:雇主应(按其所能)根据承包商的请求,对其提供以下合理的协助:(a) by obta ining copies ofthe Laws of the Country which are releva nt to the Con tract but are not readily available, and取得与合同有关,但不易得到的工程所在国的法律文本;(b) for the Con tractor s application? foermits, lice nces or approvals r
17、equired by the Laws of the Coun try:协助承包商申办工程所在国法律要求的以下任何许可、执照或批准:(i) which the Con tractor is required to obtai n un der Sub-Clause 1.13 Complia nce with Laws,根据第1.13款遵守法律的规定,承包商需要得到的,(ii) for the delivery of Goods, in clud ing cleara nce through customs, and为运送货物,包括结关需要的,(iii) for the export of Co
18、n tractor s Equipme nt whe n it is removed from the Site.当承包商设备运离现场出口时需要的。2.3 Employer s personnel雇主人员The Employer shall be responsible for ensuring that the Employer Personneland the Employer s other con tractors on the Site:雇主应负责保证在现场的雇主人员和其他承包商做到:(a) co-operate with the Con tractor s effo-tClansl
19、e 4SuCo-operati on, and根据第4.6款合作的规定,与承包商的各项努力进行合作。(b) take actions similar to those which the Con tractor is required to take un der sub-paragraphs (a), (b) and (c) oSub-Clause 4.8 Safety Procedures and un der Sub-Clause 4.18 protectio n of the En vir onmen t.采取与根据第4.8款安全程序(a)(b)(c项和第4.18款环境保护要求承包商采
20、取的类 似行动。2.4 Employer s FirialnArrangements 雇主的资金安排The Employer shall submit, within 28 days after recei ving any request from the Con tractor, reas on able evide nee that finan cial arran geme nts have bee n made and are being maintained which will en able the Employer to pay the Con tract Price (as
21、 estimatedat that time) in accorda nee with Clause 14 Co ntract Price and Payme nt.the Employer intends to make any material changeto his financial arrangementsthe Employer shall give notice to the Con tractor with detailed particulars.雇主在应在收到承包商的任何要求28天内,提出其已做并将维持的资金安排的合理证明,说明雇主能够按照第14条合同价格和付款的规定,支
22、付合同价格(按当时估 算)。如果雇主拟对其资金安排做任何重要变更,应将其变更的详细的情节通知承包 商。2.5 Employer s Claims雇主的索赔If the Employer considers himselfto be entitled to any payment under any Clause dhese Con diti ons or otherwise in conn ecti on with the Con tract, an d/or to any exte nsion of the Defects Notificati on Period, he shall giv
23、e no tice and particulars to the Con tractor. However, notice is not required for payments due under Sub-Clause 4.19 Electricity, Water and Gas, under Sub-Clause 4.20 Employer lEquipment and Free-Issue Material, or for other services requested by the Con tractor.如果雇主认为,根据本条件任何条款、或合同有关的另外事项,他有权得到任何付款
24、, 和(或)缺陷通知期限的任何延长,他应向承包商发出通知,说明细节。但对承包 商根据第4.19款电、水和燃气和第4.20款雇主的设备和免费供应的材料规定的到 期付款,或承包商要求的其他服务的应付款,不需发出通知。The notice shall be given as soon as practicableafter the Employer becameawareof the eve nt or circumsta ncesg iving rise to the claim. A no tice relati ng to any exte nsion of the Defects Notif
25、icatio n Period shall be give n before the expiry ofuch period.通知应在雇主了解引起索赔的事件或情况后尽快发出。关于缺陷通知缺陷任何延长 的通知,应在该期限到期前发出。The particulars shall specify the Clause or other basis of the claim, and shall include substa ntiati on of the amount an d/or exte nsion to which the Employer con siders himsetb be en
26、titled in conn ecti on with the Con tract. The employer shall the n proceed in accorda nce with Sub-Clause 3.5 Determ in ati on s to agree or determ in&() the amount (if any) which the Employer is en titled to be paid by the Con tractor, an d/or (ii )the exte nsion (if any) of the Defects Notificati
27、on Period in accordancewith Sub-Clause11.3 Extension of the Defects Notification Period.通知的细节应说明提出索赔根据的条款或其他依据,还应包括雇主认为根据合同他有权得到的索赔金额和(或)延长期的事实依据。然后,雇主应按照第3.5款确定的要 求,商定或确定(i )雇主有权得到承包商支付的金额(如果有),和(或)(ii)按照第11.3款 缺陷通知期限的延长的规定,得到缺陷通知期限的延长期(如果有)。The Employer may deduct this amount from any mon eysdue,
28、or to become due, to the Con tractor. The Employer shall only be en titled to set off aga inst or make any deducti on from an amount due to the Con tractor, or to otherwise claim aga in stthe Con tractor, i n accorda nee with this Sub-Clause or with sub-paragraph (a) an d/or (b) ofSub-Clause 14.6 In
29、 terim Payme nts.雇主可将上述金额在给承包商的到期或将到期的任何应付款中扣减。雇主应仅有权 根据本款或第14.6款期中付款(a)和(或)(b)项的规定从给承包商的应付款中冲销或 扣减,或另外对承包商提出索赔。实用翻译1. 总包是全厂施工总图及临设的归口管理单位,对厂区施工总图及各类临设工程进行统一规划和管理。总包公司编制施工总图及临设布置统筹方案,报监理和业主批 准后实施。The Main Con tractor shall be resp on sible for the man ageme nt of layout pla ns and temporary faciliti
30、es on construction site, and he shall manageand plan for all the layout arra ngeme nts in the factory and all sorts ofemporary facilities there. The Mai n Con tractor shall prepare the general layout plan and arrangementplan for temporary facilities, and submit the same to the Con sult ing Engin eer
31、s and the Employer for approval before the executi on of the pla ns.2. 在施工区域内可以自行规划小型暂设,主要用于材料堆放及工地必须的临时仓库和办公室等,在永久性建筑物不得安排住宿。Small-scale temporary facilities on the con struct ion site can be pla nned and arran ged by the con tractor himself, which shall be used as material stock yard, temporary wa
32、rehousea nd offices n ecessaryto the con struct ion works. Perma nent structures shall not be used as accommodati on for anyone.3. 进入厂区施工必须切实保护好现场的临时供水、供电、通讯、道路、防洪、防雷 击、消防以及方格网坐标点等设施。一旦发生损坏时,应立即向业主报告,并组织 人员进行抢修,抢修完成,经业主和监理公司验收合格后方可继续使用。Facilities in the factory area like the ones for temporary water
33、 power supply and firefighting, com muni cati on n etwork, roads,a nti-flood equipme nt, lighte ning arrestors,a nd coord in ate points in the square grids on con struct ion site shall be well protected. In case damage to any of them, the Employer shall be no tified and the Con tractor shall immedia
34、tely carry out emergencyrepairs for the facilities. Upon completion of repairs, the facilities shall be in spected and checked by the Employer and the Con sult ing Engin eers for approval to use.投标阶段的翻译我们审阅了贵方11月5日来信附录的标书文件并考察了现场,发现标书文件中有些 描述不清楚,有些描述与现场情况不一致。因此,我们希望贵方能够就下述问题进 行澄清:1)2)非常感谢,若能澄清上述两项,我
35、们就能在正确的基础上投标检查贵方标书后,我们发现以下错误恳请尽快确认是否有错误,告知贵方希望我们采取的行动。根据评标规则,你可以: 要么:保持标书工程量清单的原单价不变,允许我们调整由于上述错误影响到的乘 积或者取回标书。On exam in ati onof the ten der docume nts en closedwith your letter of (date)and following our inspection of the site, it is found that some descriptions in the tender docume nts are ambig
36、uous and that there are some discrepa ncies betwee n what is described therein and what has been observed at the site. Therefore, we wish to draw the following matters to your atte nti on.We shall be grateful ifyou can clarify these two items so that we may be certa in that we are ten deri ng on the
37、 correct basis.An exam in ati on of your ten der datedhas disclosed the follow ing appare nterror:Will you please, as a matter ofirgency, confirm the existence ofthis error and let us know your instructions as to the action you wish us to take. In accordance with our rules, you may:either maintain the origi nal rate show n in the bill
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026江苏南通如东县岔河镇村卫生室工作人员招聘2人备考题库附参考答案详解(综合卷)
- 2026年湖南永州市中考语文真题试题(含答案)
- 2026年陕西省咸阳中小学教师招聘考试题库及答案
- 2026年湖南娄底市中考英语试题(附答案)
- 2026年湖北咸宁市中考历史真题试题(含答案)
- 2026年河南省周口市重点学校小升初数学考试真题试卷(含答案)
- 2026年湖北鄂州市中考地理考试真题带答案
- 2025年大庆市萨尔图区事业单位招聘笔试试题及答案解析
- 2025安徽合肥市庐江县工业投资有限公司招聘考察考试备考题库及答案解析
- 第4课《灯笼》教学设计-统编版语文八年级下册
- 绍兴市2026公安机关辅警招聘考试笔试题库(含答案)
- 银屑病诊疗指南(2026年版)基层规范化诊疗
- 2026年中国超高丁腈氢化丁腈橡胶市场数据研究及竞争策略分析报告
- “大展宏图”系列研究二:特朗普如何重构石油美元2.0体系
- 2026贵州茅台集团校园招聘89人考试参考试题及答案解析
- 2025年陕西国防工业职业技术学院单招职业技能考试试题及答案解析
- 介入治疗围手术期疼痛管理专家共识2026
- 2025年青岛地铁校园招聘笔试题及答案
- 2025年扬州市职业大学单招职业技能考试题库附答案解析
- 三国空城计课件
- 中药饮片GSP培训课件
评论
0/150
提交评论