版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Going Places Under Instrument Rules Entails Three Primary PhasesU.S. U.S. TERMINAL TERMINAL PROCEDURES PROCEDURES PUBLICATIONPUBLICATION(TPP)(TPP) “PLATES” “PLATES”The purpose of the U.S. Terminal Procedures Publication (TPP) is to enable pilots to guide their aircraft into and out of airports. Whet
2、her for departing or arriving, these procedures exist to make the controllers and pilots jobs safer and more efficient. TPPs include approach procedures, arrival and DPs and airport diagram.New and improved old term! SID Standard Instrument DepartureIn the interest of International harmony, the FAA
3、has re-introduced the term “SID” while also utilizing the term “Obstacle Departure Procedures (ODP)” to describe certain procedures. Thus, two separate types of DPs are defined in AIM 5-2-6: SIDs and ODPs.INSTRUMENT DEPARTURE PROCEDURES (DPs)OBSTACLE DEPARTURE PROCEDURE (ODP) TEXTUAL DPs(IFR DEPARTU
4、RE PROCEDURES)ATC/GRAPHICAL DEPARTURE PROCEDURESSIDsOBSTACLE DEPARTURE PROCEDURE (ODP) TEXTUAL DPs(IFR DEPARTURE PROCEDURES)ATC/GRAPHICAL DEPARTURE PROCEDURESSIDSINSTRUMENT DEPARTURE PROCEDURES (DPs)STANDARD TAKE-OFF MINIMUMS: 1 statute mile for single- and twin-engine airplanes, and statute mile fo
5、r aircraft with more than 2 engines.OBSTACLE DEPARTURE PROCEDURE (ODP) TEXTUAL DPs(IFR DEPARTURE PROCEDURES)ATC/GRAPHICAL DEPARTURE PROCEDURESSIDSINSTRUMENT DEPARTURE PROCEDURES (DPs)OBSTACLE DEPARTURE PROCEDURE (ODP) TEXTUAL DPs(IFR DEPARTURE PROCEDURES)Paleo Three DPHenry One DPATC/GRAPHICAL DPsIN
6、STRUMENT DEPARTURE PROCEDURES (DPs)ComplexPilot NavSimpleVectorHenry OneGraphic DPs are relatively simple they graphically show the NavAids and their relationship to each other.The DEPARTURE ROUTE DESCRIPTION is equally simple, providing basic directions from the runway to a minimum altitude where d
7、eparture radar contact is establishedPaleo ThreeSome DPs are more complex, requiring the pilot to navigate him/herself through the entire route to the en-route phase (though radar guidance can realistically be expected). The DEPARTURE ROUTE DESCRIPTION is also more complex, specifying each leg from
8、fix to fix.The DEPARTURE ROUTE DESCRIPTION Gives The Routing Instructions In Textual FormatDPS PALEO THREE . 30 SWANN THREE . 31The “PALEO THREE” DP FOR BWIThe Header Gives The Identifier For The DP and The Area Which It ServesNote That, Upon Revision, The Paleo 3Paleo 3 DP Becomes ThePaleo 4Paleo 4
9、 DP4This is the FAAs Plate Identification Code numberThis Identifies the Date of the DP In this case: Year 2000, 279th DayFOURThe Planview Graphically Illustrates The Route Of Flight Along With Key Points, NavAids, and Altitudes.U.S. Standard for Terminal Instrument Procedures (TERPs)The United Stat
10、es Standard for Terminal Instrument Procedures (TERPS) is the approved criteria for formulating instrument approach procedures.200/NM2004001 NM2 NM 35 Standard Take-Off climb gradient for IFR 200/NM1523041 NM2 NM 35 200/NM 9648TERPs further specifies an obstacle free departure path based on the assu
11、mption that your aircraft is capable of at least 200/NM this provides you with at least 48 of obstacle clearance per NMTERPS specifies a non-penetration slope of 152/NM200/NM152304 35 481 NM2 NMIf an obstacle penetrates the non-penetration slope 250/NMthen the departure slope must be adjusted up to maintain the required obstacle clearance per NM.380 PeakClimb Gradient: 380 / 1.52 = 250/NM120Required climb gradient is 250 per Nautical Mile, but wait- our instrument only reads feet per minute. How do we convert?Li
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 新能源行业技术员面试题集与答案
- 深度解析(2026)《GBT 19163-2010牛蛙》
- 创新思维与问题解决方法创意设计含答案
- 年产xxx保险片项目可行性分析报告
- 带式干燥机项目可行性分析报告范文
- 深度解析(2026)《GBT 18978.171-2024人-系统交互工效学 第171部分:软件无障碍设计指南》
- 交通仪器仪表项目可行性分析报告范文
- 草皮项目可行性研究报告(立项备案申请)
- LED射灯项目可行性分析报告范文
- 特殊人群社区慢性病管理的质量控制策略
- 交款合同范本
- 安全生产法律法规汇编(2025版)
- 《软件工程竣工验收指南》
- 《铁路轨道维护》课件-更换道岔尖轨作业
- 病理生理学(南华大学)知到智慧树章节答案
- 《特种设备重大事故隐患判定标准》培训
- 森林资源动态监测
- 气血疏通中级班教材
- 云南中烟公司招聘笔试真题
- 售后服务技巧提升售后服务的满意度
- 汽车销售实务(第3版)课件 学习情境七 车辆交付
评论
0/150
提交评论