版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1会计学ATFIntrabeamScatteringResultsATF束内散射的结果束内散射的结果12/14/2021DR2003, Jan. 27 at DaresburyDR2003, Jan. 27 at DaresburySR InterferometerLaser Wire in the ringEnergy Spread by Screen Monitorat the Extraction LineBunch Length by Streak Camera in the RingDR2003, Jan. 27 at DaresburyDR2003, Jan. 27 at Dare
2、sburyDR2003, Jan. 27 at DaresburyComparison with Simulation and TheoryDR2003, Jan. 27 at Daresburymotivation Linear Colliders require nm-size beams Damping rings produce ultra low emittance beams ATF experiment at KEKto demonstrate low emittance beam productiondevelop handling / monitoring technique
3、sstudy beam dynamics ( low emittance, multi-bunch )ATF damping ring1.1 10-9 m rad ( horizontal emit.) 100 mm0.5 10-11 m rad ( vertical emit.) 7 mmbeam energy :1.28 GeV intensity : 1.21010 e/ bunchnumber of bunches : single / multi (220bunches) (2.8ns spacing)need reliable beam size monitorsprinciple
4、 of laserwire monitorthin photon target (laserwire) transversely placed on the beam orbitscan across the electron beam“count” Compton scattered photons CW laserwire with optical cavityenhance laser power (high mirror reflectance high power gain )control laser waist size laser on/off for background s
5、ubtractionImportant issues high intensity small waist sizereliable beam size monitor in Damping ringnon-invasive methoddirect measurement of the beam sizedispersion negligible (straight section) multi-bunch beam (timing detection of gamma rays)work at almost zero current feature other monitors SR in
6、terferometer (arc)X-ray SR monitor (arc)wire scanner (ext)OTR/ODR (ext)1. laserwire2. detector and collimator3. data taking systemreplaced in 2002 summer shutdowncavity modulewhole system mounted on movable tablemovable both vertical/horizontaltable position is monitored by laser position sensorhori
7、zontal wirevertical wireFabry-Perot high power gainnarrow resonance power inside cavity feedback controltransmission intensity = reference voltage 0.1 nm resolution servo systemcontrol cavity lengthpiezo actuatormonolithic elastic hingelaser specification cavity specificationhorizontal wire(vertical
8、 measurement)vertical wire(horizontal measurement)mirror front99.1 %99.8 %reflectanceend99.9 %99.9 %mirror curvature20 mm20 mmfinesse6201700power gain6601300size (rms)5.67 0.1 m14.7 0.2 mRayleigh range760 m5100 mwavelength532 nmCW power300 mWlinewidth10 kHz (1msec)LightWave Series 142 diode-pumped s
9、olid state laser CW freq. doubled YAG laserLaser-ON: Laser-OFF: 113 Hz sinusoidal modulation background subtractionbackground 10kHzLaser-ON / Laser-OFF measurementmodulate intra-cavity power (cavity length modulation)30% (time)85% of power (average)30% (time) 7.5% of power (average) Compton scatteri
10、ng28.6 MeV (max gamma energy)23.0 MeV ( 0.2 mrad scattering angle ) gamma ray detector70 mm 70 mm 300 mm CsI(pure) crystal2” photo-multiplier time resolutionPMT signal leading edge0.56 nsec resolution (signal energy region)enough to separate 2.8ns spacing bunches Energy spectrumsignal/background = 4
11、 / 1 (vertical beamsize measurement)energy window (15MeV 25MeV) “counting” method no event pile-up (10kHz rate / 2MHz ring revolution )energy gate and leading edge detectionbunch identification by gamma ray signal timing20 beam profiles (multi-bunch) at the same time single bunch emittance (Mar 2003
12、) bunch ID by hit timing (bunch marker) laser ON/OFF count ratealign collimatorsbeam based alignment for collimatorslocal orbit bump at laserwire position if needed scanning1 round trip for 1 profileautomatic scan vertical 10sec. for 1 position move 10 micron (6sec.) 6 min. for 1 scan error dominate
13、d by orbit drift horizontal 30sec for 1 position move 50 micron (10sec.) 15 min. for 1scan error dominated by statisticsvertical“bad data”longitudinal laser profilelaserwire size = 5.67 0.1 m(laser divergence method)laserwire size = 5.46 0.2 m(fitting from focus scan)small waist size small Rayleigh
14、length change x-position and confirm laser profile laser has parabolic shapedispersion measurement by laserwire itselfchange Ring RFscan beam by laserwiremeasure the beam position shiftvertical dispersion = 2.0 mm (almost negligible)horizontal dispersion = 2.0 mm (negligible) beta function at two co
15、llision pointsfor vertical measurement x= 9.81 m, y= 4.32 mfor horizontal measurement x= 7.83 m, y= 4.90 mbeamsize measurement as a function of storage timestudy detector response after beam injectionHorizontalEmittanceVerticalEmittanceRecent Results with calculated values on intra-beam scattering a
16、nd pure inductive impedanceBunchLengthEnergySpreadHow to improve resolution?beam size : 5.5 mm laser waist size: 5.6 mm close to the resolution limit possibilities stronger focusing fine tuning of cavity length sensitive to mirror geometries shorter Rayleigh length shorter wave length high quality m
17、irror high power / stable laser use higher transverse modeuse TEM01 resonance mode in the optical cavity as a laserwirefactor 23 resolution improvementinsensitive for beam orbit driftscan freegood resolution for small beam sizemisaligned laser injectionmode degeneration TEM01/10mirror distortion to
18、split these modesmirror distortionhigher order mode resonate in the cavitytransmitted light profiles of each modestable realization of higher order modesTEM00TEM01TEM02ConclusionUltra-low emittance electron beam is good for you.Ultra-short bunched beams are good for my future R&D.Now we are goin
19、g to do nano-beam orbit handling with international collaboration. Sub-nano meter and sub-100f second beam will be realized in the future. Beam diagnostics for above beam are necessary. Idea of such diagnostics exists. However, present technologies are not mature. So, we continue R&D with challe
20、nging spirit for future linear collider project. 1. Installation of 5 wire-scanners into ATF Linac2. Improvement of temperature control of cooling water 3. Stabilization of Magnet Power Supply4. Increase QE of photo-cathode5. Vacuum backing (beam scrubbing) is necessary.6. Adding trim coils to both
21、end poles of wigglers which will be finished in next summer shutdown. Other issues1. Stabilization of extraction kicker system2. More precise beam orbit control3. 100 bunches/pulse electron beam generation and acceleration4. Test on beam loading1. Survey IBS in detail and 2. Longitudinal instability
22、 until 3x1010 electrons/bunch.3. Multi-bunch instability until 3 trains with 20 bunches.4. Especially Fast Ion Instability with vacuum pump turn-off.5. Observation of different beam behavior with wigglerScheduleFirst ATF program (from 1997) will be finished until the end of JFY 2004.Second ATF progr
23、am which includes nano-meter orbit handlingand 1st bunch compression until 1psec(rms) has been already unofficially discussed.12/14/2021DR2003, Jan. 27 at Daresburyhorizontal wirevertical wirelaser specification cavity specificationhorizontal wire(vertical measurement)vertical wire(horizontal measurement)mirror front99.1 %99.8 %reflectanceend99.9 %99.9 %mirror
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 陕西西安科技大学附属中学2026年初三第二学期年级质量调研考试物理试题试卷含解析
- 2026年大学大一(康复治疗学)康复心理学基础阶段测试题及答案
- 2026年大学大一(机械设计制造及其自动化)机械设计基础阶段测试题及答案
- 2025年前台防疫知识卷
- 护理带教中的多学科合作
- 2025年前台电话接听能力训练
- 604 GLD1500皮带式给煤机
- 护理职业安全与持续改进
- 护理安全转运转运安全管理
- 护理安全与安全保障
- 文化旅游嘉年华主题活动方案
- 2026年常州机电职业技术学院单招职业倾向性测试题库附答案详解(a卷)
- 青海国家电网2026年高校毕业生招聘第二批笔试参考题库及答案解析
- 2026及未来5年中国铁路信号微机监测系统行业市场运营态势及未来趋势研判报告
- 2025至2030中国服装市场运行分析及发展前景与投资研究报告
- 2026教育培训产业市场供需分析与未来发展预测研究报告
- 2026年新修订《医疗器械经营质量管理规范》培训考核试题及答案
- 2026春统编版六年级道德与法治下册(全册)课时练习及答案(附目录)
- 2026年《必背60题》抖音本地生活BD经理高频面试题包含详细解答
- 国外马克思主义
- 五年级下册美术《第18课-民间陶瓷》课件-赣美版
评论
0/150
提交评论