版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、MS Access MRP Manufacturing Resource PlanningSmall Business MRP - Small Business ERP Microsoft Access Database ERP MRP Program ERP / MRP Manufacturing Software ProgramPEDYN specializes in Small Business Manufacturing Operations, Engineering Management, and Document Control Software. S
2、ee the all in one P2000 Enterprise Resource Planning (ERP / MRP) program that uses Microsoft Access as the program platform. The P2000 is a powerful Low Cost solution for your complete business operations, from design concept, project management and documentations control to purchasing, material con
3、trol, manufacturing, and order entry. It's graphical design and drill down navigation make the P2000 very easy to learn and use. Since the program is completely written using Microsoft Access, it interfaces well with other products, and can be easily customized to fit your ever changing business
4、 requirements. The program can be used along with other ERP / MRP programs that your company may be using by activating only the modules that you require. The P2000 is expandable, flexible and provides the perfect low cost solutions for small to mid size engineering and manufacturing companies.
5、;Why spend a fortune on expensive complicated system programs that are not easily adaptable to your specific needs. Using Microsoft Access as a front-end operating system means that you have full control and flexibility. Create new forms and reports as you need them. Expand your operating system any
6、way you choose. ERP software Categories and Features 1.Manufacturing and Operations Modules:Manufacturing Software, Manufacturing Program, Operations Software, Operations Program, Manufacturing Solutions, Production Management Program, Production Control Management, Discrete Manufacturing,
7、 Production Planning, Material Requirement Planning(MRP), Manufacturing Resource Planning (MRP II), Enterprise Resource Planning, ERP Software, MIS, Stock Replenishment Systems, Production Workflow Management, Product Management, Supply Chain Management, SCM, Supply Management, Materials
8、Management, Business Management, Planning and Scheduling Enterprise, Multi-User Manufacturing Control Software, Inventory Management, Inventory Control, Product Management, Stock Control software, Small Business Soluitions, Small Business MRP, Small Business ERP2.Engineering Modules:Engineering
9、 Management Software, Engineering Software, Engineering Program, Engineering Project Management Software Programs, Design Management Software Engineer Task Management, Engineering Task Management, Daily Task Management, Tasking, Engineering Change Notice, Engineering Change Request, Engineering Chan
10、ge Order, Engineering Change Orders, ECN, ECO, DCO, DCN, ECR, DCR, Engineering Operations, Engineering Project Planning and Scheduling, Online Task Management3.Documentation Modules:Documentation Control software, Document Control Management, Drawing Control, Configuration Control Management, C
11、onfiguration Management Software, Configuration Control Software, Drafting Management, Document Change Order, Change Orders, BOM software, Bill Of Materials, Indented Multi Level, Reference Designators, Drafting Task Management, Draftsman,CAD, AUTOCAD, Configuration Management, Electroni
12、c Document Management, Enterprise Document Management Systems, Specification Management, Release Control, Revision Control, Workflow Systems, Specification Control Drawings, Source Control Drawings, SCD, Fabrication Drawing, Assembly Drawings, Online Sign-off and Approval Forms, Engineering Ch
13、ange Orders, ECN, ECO, DCO, DCN, ECR, DCR, BOM, bom, PDM Product Data Management, PDM Software, PDM Access Database4.Processes:Make To Order, Assemble To Order, Build To Order, Configure To Order, Cellular Manufacturing, , Forecasting, Standard Costing, Material Receiving, Shipping, Resources, Maste
14、r Scheduling, Production Capacity, Shop Loading and Capacity Planning, Business Processes, Job Shop, Routing, Electronic Order Processing, Demand, Scheduling, Scrap, Product Cost, Labor, WIP, Finished Goods, Stock Control, Inventory Control, Standard Cost, Standard Costing, Average Costing, Av
15、erage cost, Forecasting, Delivery, Pick List, Vendor List, Components, Sub Assemblies, Material Planning, Demand Planning, Forecasting, Sales Planning, Distribution Planning, Production Planning, Work Order Management, Customer Order Management, Order Entry, Pricing, Shipping, Load Building, R
16、outing, Item Master, Parts List, Parts Book, Purchase Order, Purchase Orders, PO, Purchasing, Work Order, Sales Order, Order Entry, Customer Order Processing, Shop Order, Back Order, Shipping Order, Parts Allocation, Allocations, Product Costing, Master Production Scheduling, Dock-to-Stoc
17、k, Inspection, Testing, ISO 9000 Compliant, ISO 9001 Compliance, Finance and Accounting Interface, Accounts Payable, Accounts Receivable, General Ledger, Invoicing, Cost Management, Financial Control, Cash Flow Forecasting, Financial Forecasting, Planning System, Invoice, Tracking, Time,
18、 Analysis, Human Resources, Payroll, Time, Personnel5.Platform:MS Access Database Platform, Microsoft Access Database, MS Access97, MS Access2000, MS Access 97, MS Access 2000, Access XP 2002 2003, MSAccess Forms, MSAccess Reports, Microsoft Windows 98, Microsoft Windows 2000, Microsoft NT, Microsof
19、t XP, Excel, SQL, MySQL, ACCESS PEDYNE, PEDYNAMICS, P2000, Software, Program, Custom, Customized, Access Programming, Custom Database, Low Cost, LOW COST, Free Demo, Free Trial6.Other:PDM Product Data Management, Repetitive Production Management, Business Planning, Sales and Operations Planning,
20、0; Distribution Requirements Planning, Capacity Requirements Planning, CRP, Process Management, Product Data Management, Information Management Systems, Warehousing, Distribution Center Operations, Warehouse Management Systems, WMS, Electronic Data Interchange, EDI, Customer Relationship
21、 Management, CRM, Company Solutions, QRM, Quick Response Manufacturing, Supply Chain Planning, Vendor Managed Inventory, VMI, Site Location Planning, Distribution Resource Planning, DRP, Resource Monitoring, Administrative Management, JIT, Demand Planning, Demand Chain, Business Int
22、elligence, Intelligent Enterprise, Flow Techniques, Business Solutions, Agile E-Business, QuickBooks, PeachTree, Quality ManagementMaterial Requirements Planning OverviewMaterial Requirements Planning (MRP) is designed to assist manufacturers in inventory and production management. Using MRP h
23、elps ensure that materials will be available in sufficient quantity and at the proper time for production to occur, without incurring excess costs by having the materials on hand too early. MRP assists in generating and (as needed) revising production plans to meet expected demands and replenishment
24、 plans to assure the timely availability of raw materials and all levels of product components.MRP begins by compiling a Bill of Materials (BOM) for each end product or component of interest. This is a listing of the components and quantities that are needed to manufacture the end product or compone
25、nt. Theoretically, the compilation of BOMs continues recursively, enumerating the subcomponents that are needed to manufacture each component, until only raw materials appear in the generated BOMs. In practice, a manufacturer may prefer to extend the BOM enumeration for only a specified number of le
26、vels and to assume that components and/or raw materials beneath that level are available on demand.Next, MRP requires information on the lead times associated with each manufacturing or assembly procedure that is required to produce the components and end products. Lead time is the time required to
27、assemble or manufacture the needed components into the end product (or higher-level component), and thus is the time elapsed between the point at which all needed components are present and the end of assembly or manufacturing. These lead times may be compiled per unit of each component/product or m
28、ay be based on predetermined batch sizes.MRP combines the BOMs, the lead times, and estimates of demand for end products to generate the Master Production Schedule, which details a schedule of assembly and production that enables the manufacturer to meet the estimated demand. This schedule addresses
29、 only the final level of assembly or production (resulting in end products), and includes both the timing and quantities of production. The Master Production Schedule serves as the basis for all further output information from MRP.Using the Master Production Schedule as a starting point, it is a con
30、ceptually simple (but computationally demanding) task to combine it with the data on lead times and BOMs to derive a schedule of component (and possibly raw materials) requirements, through as many levels of assembly and production as the manufacturer chooses. This schedule can account for such fact
31、ors as work-in-progress, current inventory of and pending orders for materials and components, and direct demand for components as service items. Using this schedule of requirements, the manufacturer must determine a material replenishment strategy that satisfies these requirements. A wide variety o
32、f ordering rules and heuristics can be incorporated into computer-based MRP models.In addition to the material requirements, other useful data can be generated from the Master Production Schedule. These include the projected inventory levels for any end product, the projected schedule for any assembly or production process, and the projected utilization of capacity for a particular production operation. Any of this information should aid in evaluating current or potential materials replenishment strategies.Compute
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 退市知识竞赛
- 输血相关知识及不良反应
- 输电线路知识讲座
- 输液港的相关知识
- ICU护理安全管理制度
- 软件培训速成班
- 23危险作业安全管理制度
- 贵阳宣传教程培训
- 团队协作拓展与团队合作游戏互动方案
- 合作共赢伙伴关系建立承诺书3篇
- 2026届山东省济南市高三上学期第一次模拟考试物理试题(原卷+解析)
- 医患沟通学与医学的关系
- 洗浴中心服务规范与流程(标准版)
- 北京市怀柔区2026年国有企业管培生公开招聘21人考试题库必考题
- 2026年陕西财经职业技术学院单招职业技能测试题库参考答案详解
- 2026年区块链基础培训课件与可信数据应用场景指南
- 雨课堂学堂在线学堂云《课程与教学论( 华师)》单元测试考核答案
- 2025年豆制品千张销量及餐桌烹饪调研汇报
- 不良事件上报流程及处理
- 为老年人更换纸尿裤
- DB64-T 1991-2024 地质灾害监测设施建设技术规范
评论
0/150
提交评论