NC分析仪课件_斯塔米卡帮_第1页
NC分析仪课件_斯塔米卡帮_第2页
NC分析仪课件_斯塔米卡帮_第3页
NC分析仪课件_斯塔米卡帮_第4页
NC分析仪课件_斯塔米卡帮_第5页
已阅读5页,还剩24页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、N/C Metering system for urea plantsThe N/C value is one of the most important parameters to achieve an efficient production of good quality urea.NCpresentation SPIE2Stamicarbon and SPIEFor more than 20 years SPIE has been building N/C meters.Together with Stamicarbon the design is modified trough th

2、e years. NCpresentation SPIE3N/C Metering system for urea plantsWhy measure How measureLab analysisN/C MeterN/C meter designFunctionalityPressure reducerTemperature reducerMeasurementFlushingCoolingComponentsAngle valve & monoblockBack pressure regulatorFlushing installationN/C cabinet Auto flus

3、hStart-upShutdownTroubleshootingQuestions?Density tubeNCpresentation SPIE4Why measure?Control reactants at azeotropic ratio (to do so the, N/C ratio deviations must be as small as possible; the N/C ratio spread should be reduced !) NCpresentation SPIE5 Spread N/C ratio over a period of 24 hours- wit

4、h N/C meter control_ without N/C meter control324 HN/C changes due to difference in cooling water temp. during day and night. Stamicarbon: “We suspect this is mainly due to more CO2 being produced by the NH3 plant and the increased efficiency of the CO2 compressor at night”NCpresentation SPIE6Lab An

5、alyse:CarbamateUrea + water2 NH3 + 1 CO2CarbamateN/C = 2 urea + NH31 urea + CO2Measure WT%:UreaNH3Co2NCpresentation SPIE7N/C Meter MeasurementN/C = f (density, pressure, temperature)If pressure and temperature are controled and constant N/C = f(density)After research Stamicarbon discovered:NCpresent

6、ation SPIE8N/C ratio in the outlet of the reactorTemperature = 50 degPressure = 20 BargNCpresentation SPIE9N/C meter design criteriaSystem must include accurate density measurementSystem must provide and control stable temperature and pressure conditionsSolidification of urea must be prevented at al

7、l timesUndesirable conditions need to be indicatedGives a 4.20 mA output for N/C ratioNCpresentation SPIE10N/C meter connectionsABCreactorstripperc.w. air steamrectifying columnrecirculation heater flushing condensatec.w.steam drainN/C meterNCpresentation SPIE11Angle valve + monoblockCDABA combinati

8、on of two valves (angle valve & 3-way monoblock valve) for sampling, providing the possibility for isolation and flushing of the N/C metering system.NCpresentation SPIE12NCpresentation SPIE13Monoblock NCpresentation SPIE14Pneumatically actuated valveSteam tracingAngle valveMonoblock valveSample

9、INSample (or condensate) to N/C meterCondensate INTwo manual operated valvesProcess connectionNCpresentation SPIE15Flushing PumpCDABFlushing system to feed flushing water to the 3-way monoblock valve and the N/C meter.Automatically activated on flow, pressure, temperature alarm of urea sample.NCpres

10、entation SPIE16Flush pump headNCpresentation SPIE17Back pressure regulatorCDABBack pressure regulator (heated) for fine control of the pressure in the density transmitter. NCpresentation SPIE18BPR in detailNCpresentation SPIE19N/C cabinet (front side)CDABThe N/C meter cabinet with capillary pressure

11、 reducer, safety valve and density transducer.NCpresentation SPIE20Sample drainDensity meter & Sample flow meter and temperature (Trip alarm function)Cabinet temperature measurementSafety relief valveCapillary pressure reducer Condensate pressure swichSample Pressure transmitter Sample Temperatu

12、re Bleed valve密度计和取样流量和温度密度计和取样流量和温度柜内温度测量柜内温度测量取样漏取样漏样品压力变送器样品压力变送器样品温样品温度度安全泄放阀安全泄放阀毛细管减压器毛细管减压器冷凝压力开关冷凝压力开关泄放阀泄放阀NCpresentation SPIE21back-side N/C metering cabinetPressure switch cooling water circulationCooling water outletCooling water safety relieve valveCoolerCooling water inletL.P. steam in

13、letCooling water control valveCooling water pump循环冷却水压力开关循环冷却水压力开关冷却水出口冷却水出口冷却水进水冷却水进水冷却水安全阀冷却水安全阀冷却器冷却器冷却水控制阀冷却水控制阀蒸汽入口蒸汽入口冷却水泵冷却水泵NCpresentation SPIE22FlushingTrip alarmUrea temperature highUrea pressure highUrea flow lowStart flush pump (automatically or manual)Wait for the bleed valve to closeWa

14、it until flushing water pressure is higher than process.Monoblock valve opens and flushing starts.Flush the N/C meter until all conditions are typical.If the N/C meter does not work on water it will not work with sample.Stop flush pump by handNCpresentation SPIE23在线仪表在线仪表加热箱加热箱冲洗泵冲洗泵NCpresentation S

15、PIE24Start-up and shutdownAlways manual flushing.Make sure the sample line is clean and filled with water before shut down. After major maintenance flush for a long time.Do not put the N/C meter if the synthesis temperature is to low. Never put the N/C meter online if the flushing equipment is not s

16、tandby:Flush pump standbySteam condensate available at a temperature above 70CNCpresentation SPIE25TroubleshootingCapillary is blocked:FlushingHeat the capillary with steamMount capillary the other way Pressure is not constant:Check back pressure regulatorOpen regulator 100% and flush for 30 min.Rep

17、lace seat and seal of the back pressure regulatorSample temperature not ok:Cooling water temperature to highDelta pressure not big enoughCheck temperature controller (DCS)Check cooling water valveNCpresentation SPIEMaintenanceEvery Weekly:Start the flushing pump using pump test switch.Check steam pu

18、rge on the sample PSV.Check flow to the drain from the bleed valve.Every year:Beware that due to the local situation scaling can occur in sample coolerTake note that as indicated in the quotation stage the chlorine level should be max. 300 ppm. Is it higher than you should take into account that corrosion can take place.Change the hydraulic and gearbox oil of the flush pump as described in the manual.We suggest you check the packing of the monoblock and angle valve during stops. If necessary replace them.NCpresentation SPIE27Questions?NCpresentation SPIE28Corriolis Mass Flow measurementDens

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论