版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、PROCEDURES FOR CONTROL OF NON-CONFORMING PRODUCT1. PurposeIn respect of management of the Company and in the process of implementation of the Companys undertaken projects, proper methods shall be initiated to prevent unintended occurrence and use of non-conformities. 2. Application ScopeWhile exerti
2、ng control on the non-conforming products, the Procedures shall be applied by the departments of the Company in relation to quality management system and in the process of implementation of the Companys undertaken projects (except the customer-supplied product).3. DefinitionsThe Procedures applies G
3、B/T19000-2000 idt ISO09000:2000 standard, GB/T19001-2000 idt ISO9001:2000 standard, and related definitions in the Quality Management Manual of the Company. 4. Responsibilities4.1The related department managers of the Company shall be responsible for the effective implementation of the Procedures wi
4、thin the department. 4.2The project manager shall be responsible for the effective implementation of the Procedures in the Project Management Office, and where necessary, shall be responsible for reporting to the competent department on the upper level in order for the Company to direct the Project
5、Management Office to review and dispose non-conformities.。4.3 The person in charge of project quality shall be responsible for supervising the identification, recording, review, segregation (where possible) and disposition for the non-conformities. 5.Procedure Diagram The following procedure diagram
6、 describes procedures for control of non-conforming product. For the detailed explanations, please see Clause 6 of the Procedures Commencement12To record non-conformitiesTo repor t to the superior where necessaryRelated personnel in the department/Person in charge of project qualityDepartment manage
7、r/Project manager3Supervising classification, identification and recording of non-conformitiesRelated personnel in the department/Person in charge of project quality4To organize review, audit and put forward disposing schemeDepartment manager/Project manager5NoTo submit to the superior/customer for
8、approvalDepartment manager/Project manager6 YesTo supervise implementation of disposing scheme for non-conformitiesRelated personnel in the department/Person in charge of project quality7NoTo organize or supervise re-inspections after being disposed.Person in charge of project quality 8YesTo maintai
9、n the recordsPerson in charge of project quality Completion6.Procedures and Explanations6.1 To record non-conformitiesIf the related personnel/person in charge of project quality find major non-conformity, they shall made record and fill in “Non-conforming Product and Disposition Record Form” (Form
10、No. 02-07) to clarify description, location and presentation of non-conformity, etc. When the major non-conformity is found by the sub-contractor, the person in charge of project quality shall requires the sub-contractor to submit related records. When the non-conformity is found by the customer rep
11、resentative (usually means supervision engineer), the person in charge of project quality shall make records and validation. 6.2 To report to the superior where necessary The related personnel in the department/person in charge of project quality shall timely report the above records to the departme
12、nt manager/project manager, and report to the competent department on the upper level, where necessary.6.3To supervise the classification, identification and recording for the non-conformities. The person in charge of project quality shall supervise the identification, classification for the non-con
13、formities and make records in the “Non-conforming Product and Disposition Record Form” 6.4 To organize the review and audit and put forward the disposition scheme. Review shall be chaired by the person in charge on the different level according to the seriousness of non-conformities: For the ordinar
14、y non-conformities, the related personnel in the department/person in charge of project quality shall organize the related personnel to make review, who might be sub-contractor representative, invited specialized technical personnel and customer representative, etc. For the serious non-conformities,
15、 the department manager/project manager shall organize the related personnel to make review, and competent department on the upper level shall be responsible for organizing the review, where necessary. The appropriate disposition scheme for the non-conformity shall be determined through review.a. Fo
16、r a project, the disposition scheme for the non-conformity shall be one or more kinds among such methods as reworked, repaired, accepted by concession without repair, degraded, rejected or scrapped, etc. For the product accepted with concession by the customer, the ground for concession shall be ela
17、borated, and concession application shall be put forward after relevant technical certification and implementation scheme are submitted. The disposition scheme for serious non-conformity shall be submitted to the customer for approval. Only being approved could the scheme be implemented, and the act
18、ual condition of non-conformity shall be clarified in the document and related records shall be maintained. If the disposition scheme failed to be accepted by the customer, it shall be worked out again as per the comments and suggestions of the customer.b. The disposition scheme for the non-conformi
19、ties occurred in the comprehensive management shall generally be to take corrective actions for rectification in time after discussion with related personnel. 6.5To supervise implementation of disposition scheme for non-conformities. The person in charge of project manager shall be responsible for s
20、upervising the implementation of the disposition scheme for the non-conformities. In order to avoid misuse due to mixing position of conforming and non-conforming products, the person in charge of project quality shall segregate the non-conforming products if conditions allow. And the person in char
21、ge of project quality shall be entitled to determine the disposition scheme for slight non-conformities. The department managers of the Company shall be responsible for supervising the implementation of the disposition scheme for the non-conformities within the department. 6.6 To organize or supervi
22、se re-inspections after disposition The person in charge of project quality shall organize re-inspections for the reworked or repaired products according to the relevant standard. If the products are proved to be not qualified, the new disposition scheme shall be put forward as per Clause To
23、 maintain the records The related department personnel/person in charge of project quality of the Company shall maintain the review records and “Non-conforming Product and Disposition Record Form” according to the requirements of “Procedures for Control of Quality Records” of the Company. 7. Normative References and Supporting Documents7.1 GB/T190012000 idt ISO9001:2000 Standard;7.2 GB/T190002000
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026盘州市第四中学面向社会公开招聘食堂工作人员笔试备考题库及答案解析
- 2026年喀喇沁左翼蒙古族自治县教师招聘笔试备考试题及答案解析
- 2026-广西水文站宣传新媒体招聘考试参考题库-含答案
- 2026-安徽水文站招聘考试参考题库-含答案
- 中国建筑西南设计研究院有限公司2027届校园招聘笔试参考题库及答案解析
- 2026广东工业大学先进材料与技术研究院诚聘“青年百人计划”教师与博士后研究人员笔试备考试题及答案解析
- 2026年阜南县教师招聘考试备考题库及答案解析
- 2026年计算机整机制造行业现状及前景展望报告及未来五至十年智能体与场景落地
- 2026年喀什地区中医医院招聘编制外工作人员的(45人)笔试备考试题及答案解析
- 2026年昔阳县教师招聘笔试备考题库及答案解析
- 1.2数据的计算课件-高中信息技术必修一
- 数字音频处理器培训课件
- 云南劳动合同续签协议书
- 《钢结构设计原理》课件 第6章 拉弯和压弯构件
- 《宫颈癌的早期诊断》课件
- 气道管理及呼吸支持
- 借款担保人协议书
- 人教版中考物理复习第三章物态变化教学课件
- DBJ52T 088-2018 贵州省建筑桩基设计与施工技术规程
- 看图猜词游戏规则模板
- 发票开具协议书范本
评论
0/150
提交评论