下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、聚苯乙烯泡沫塑料板Left: The CBF process starts with upward extrusion of a “dose”. Right: The dose is sliced off by a rotating tool and deposited in a compression molding cavity on another wheel.CBF machines combine elements of compression moulding and blow moulding in a continuous rotary process. CBF uses an
2、 integrated in-line sequence that does not require station-to-station transfer. Material is extruded, cut and transferred into a compression cavity. A preform is produced, and bottles are then pre-blown before the blow mould cavity closes over the preform. Then, the mould cavity closes and the bottl
3、e is blown.Left: After compression moulding, the preform is immediately pre-blown to release it from the cavity/core and ensure uniform material distribution. Right: Final blowing occurs in the same mold station as the previous two steps, with no transfer of the preform. Stretching can be added.Inst
4、ead of using a manifold for melt distribution, an extruded shot of resin is transferred directly into the compression mould, giving producers more control over the quality of the container. Eliminating a manifold also eliminates differences in temperature, so theres less chance of particulate contam
5、ination, resin burning, and other defects, like the black specks seen with injection blow mouldingEach bottle is leak tested before leaving the machine. Left: The next step in the three-stage, in-machine QC system is an IR camera system that checks for dimensional varitiations and contamination on o
6、r in the bottle wall. Right: The final in-machine QC step is an atmospheric plasma treatment system that ensures adhesion of full-wrap labels and induction cap seals.The technology is said to offer more uniform weight distribution, as the weight of each resin shot is controlled with a servo-controll
7、ed melt pump.The pre-blow process allows a more consistent and uniform wall thickness by making it easier to separate plastic from the compression core. The blow process begins immediately after compressing the preform, leaving less chance of material sticking to the metal core rod.Largely thanks to
8、 lower process temperatures the system economises on energy compared to other processes. As the machines conveyor features an air conditioner and dehumidifier, the bottles can be taken out hotter, reducing cycle time.A leak detection is fully-integrated immediately after the bottle is blown, while the system uses infrared cameras to detect surface and internal contamination, like finish variations or metal particulates. Furthermore a plasma surface treatment system is installed as
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 译林版英语三年级下册Unit 6 On the farm单元测试(无答案)
- 企业内部沟通与协作方法与技巧手册(标准版)
- 园林景观设计施工与维护指南
- 医疗机构财务审计操作手册
- 食品添加剂使用与监管规范
- 教育辅导机构服务规范与教学质量提升
- 环境保护与治理操作指南(标准版)
- 建设工程项目质量与安全控制手册
- 通信网络优化维护规范
- 市政设施养护与管理操作手册(标准版)
- 废品回收投资合同范本
- 选煤厂消防安全知识培训
- 2025年甘肃公务员考试申论试题及答案(省级卷)
- 药企QA岗位培训课件
- 2025年中国建筑装饰行业发展研究报告
- (2025版)快速眼动睡眠期行为障碍诊断和治疗指南解读课件
- 2025年广西普法考试试题及答案
- 艺术展览管理办法
- 2025年新疆维吾尔自治区公务员录用考试公安专业科目试题
- 人教版英语八年级上学期《期末测试卷》附答案
- 上海市社区工作者管理办法
评论
0/150
提交评论