1、The study on the stage of the project cost management (Jack (Yan Genfeng); Student ID: 11B310043;Administration specialty)Abstract: Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost managem
2、ent situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives.Keywords: cost of the construction project; the status of construction cost management; management of investment under the market economy of decision-m
3、aking stage; the designphase; theimplementation phase 1IntroductionEven under the WTO andChina's accession to the world community, China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the curren
4、t budget for the construction projects - estimate, budget, Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment.Project cost management is the basic contents to determine reasonable and effective control
5、of the project cost.As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design andimplementation phases. The so-called Project Cost effective control is the optimizationof theconstructionplans anddesignprograms on the
6、basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.2 Engineering and cost managementwork of thecurrent status of project costManagement system was formed in the
7、1950s, and perfect together in the 1980s.It is the activities that the country directly involved in the management of economic. Provisions in the design stage to different estimatesor budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and a
8、pproval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority, and so on.With the historical process of the reform and development, It is formed a relatively complete budget estimate of quota management system. Ho
9、wever, as the socialist market economic development, the system's many problems have also exposed. Generallyspeaking,thebudgetestimateis based on directparticipation in the management of national economic activity as a precondition. Enterprise is not theactual economic entities. Due to theAs the
10、socialistmarketcharacteristics of the planned economy, and, at the time under the conditions of productivity, will inevitably become a shortage in the economy.In severe shortageofcommodities under the conditions, as long as a certain level of investment, will be certain outputs. In this environment,
11、 the project planning and technical argumentation there can be no economic analysis. State control of the project cost, that constitutes key factors equipment and materials prices, wages and taxes of artificial distribution. In this relatively stable economic environment, the budget estimate for the
12、 system approved project cost, help the government to carry out investment economic system established, requires us to predict project investment and control. In recent years, international investment project developed to the requirements of prior pre-control and in the middle of control. China, the
13、 traditional practice in an objective light on the cause decision-making, implementation heavy, light the economy and technology,First, the consequences of victimization, Due to the technical personnel of the project technical and economic concepts and a weak awareness of cost control, cost manageme
14、nt makes the quality difficult to raise. Project Cost control is difficult to achieve long-term可编辑goals.plans to play a major role.Second, the various stages of the decision-making phase of the project management view of the above project cost management circumstances, My first academia in the const
15、ruction project investment 1980s made the whole process of cost decision-making stage is proposed management and control concept, project proposals; conduct a building departments will study the feasibility study to determine feasibility of projects and the budgets investment estimation and the fina
16、l and final accounts to two extended at preparation of design task. At thisthe request of the corresponding regulations put our cost management concepts and methods referred to new height.Our task now is to be modern and cost management in line with China's national conditions of the market econ
17、omy system goal, learn from the advanced experience of the developed countries, and establish sound market economic laws of project cost management system, efforts to increase the project cost levels.Aninvestmentstage, the project's technical and economic decision-making,of thea construction pro
18、ject cost of the project after the completionof theeconomic benefits have a decisive influence, The construction cost is an important stage control.China's current stage of the project cost for the project management for the purpose of clearing price, and focusing only on the construction proces
19、s of cost control, neglected before the start of the project investmentdecision-making stage of cost control.Investmentdecision-makingphase ofinvestment projects is estimated an important basis for decision-making.It has a direct impact on national economic and financial analysis of the results of t
20、he reliability and accuracy. Because of this phase is the preliminary work of projects, the information can not be fully, comparable works more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at
21、 this stage do something.The various stages of the project cost control in the decision-making phase project cost control. Right project planning phase of the cost, many ownershave the wrong understanding thatthe lower the cost the better. Cost control is not a unilateral issue, and should be a numb
22、er of factors, a combinationof practical,comprehensive consideration. The construction project investment decision-making stage, the project's technicaland economicdecision-making, Cost of the project after the completion of the project and the economic benefits, with a decisive role in project
23、cost control is an important stage, rationally define and control the direction of the project cost of accurate positioningand buildingOptimization guiding role.In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investmentand c
24、an form a good proportion.hopeless completion of the beardOtherwise, invest more, less effective, resulting in loss of control and waste of investment.At present, some of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientificproof.Fe
25、asibility Studyuntrue,falseor engineeringfunctions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in the study for the project after the smooth functioning buried a lot of hidden problems, lead to insufficient follow-up funds for the project and ha
26、d to extend the timelimit so that the projectcould nothave plannedtheuse ofcost-effective,evenbecomeworks.Therefore, in order to phase in the investment decision-making effectively control construction costs, we must do the following aspects:1) Implementation oftheconstructionprojectandcorporate acc
27、ountability, Construction of the project from planning to implementation of the entire process and the use of the funds to repay responsibilities to the people. in addition to establishing a legal system and the project supervision matching mechanism by the departments in charge ofthe industry and s
28、upervisiondepartments for setting up a monitoring group to oversee the use of funds.2) Arealisticapproachtomarket analysis, to avoid the blindness of the project decision-making, reduces and reduces investment risk. Fully consider building projectsin the futuremarketcompetitiveness,design task more
29、scientific and reliability.3) Capital financing must have a formal commitment document, the parties must do investment funds in place, and funds must have documents to ensure that the project can be approved after the scheduled implementation. To the various loan conditions should be carefully analy
30、zed to minimize the burden of interest and repayment pressure.4) To strengthen the engineeringgeology,hydrology, geology and land, water, electricity, transport, environmental projects such as external conditions for the work of depth to make the investment estimate there are sufficient grounds.Afte
31、r full technical appraisal and economic evaluation, and the final technologically advanced, functional and reliable , reasonable economic projects, thus calculate a more accurate and realistic estimation of the amount ofinvestment, so that the project cost from the start positioning in a more reason
32、able level.3 Design phase of the project cost controlThe design phase of the project cost control for a long time, China's building control very effective, works on cost control, and they foundthat the cost of the design will not have a great impact, it is wrong, on the contrary, Design phase of
33、 the project cost control is the most important step. Because it determines engineering design, constructionmethods, materials and equipmentCurrently most of the propertythe quality of product design level,owners in the design stage seldomand the design quality productsininvestment projects is not u
34、ncommon, this will affect owners of investment returns, it adds to the owners and within budget, as well as difficulties in fund owners, the impact on the future management orthe owners make payments in arrears, and so on. Hence, the control of the project cost is of great significance, however the
35、project cost is the primary means of control design,types, models of the project cost is of critical significance, design optimization phase of the program or minor changes, project cost will havea significant impact, Design phase of the project cost control of the total project cost of 70%. Followi
36、ng is how to control the project from design tocreate the Law:3.1 As the owners must designThe design selected on the quality level is a direct impact on the level of direct influence on the pricing of the works. Different design units on the same project design are different. the same item of diffe
37、rent design institute works between certain aspects of the project cost on the existence of differences between, We assume that with a design from two different design institute to design, Construction plans after the completion of a requested advisory unit cost to do the budget, certainly different
38、 design institute the total cost of the project is absolutely not the same, and most of the difference between the two over 10% even more than 30%, and not necessarily high cost than the design of low cost, and good design is often low cost, We all know that different people have different design st
39、yles and different levels, the design works naturally, therefore chosen to design units is the control on the first step. Through tender to select the design of the units is a good method, the tender documents to elaborate on this particular aspect of the requirements, cost control targets, and so o
40、n.Otherwise, in the subsequent design process design units will put an increase in the cost of the design requirements; through tendering the project design into the market, compared to select the best design units.3.2 Promoting the design biddingand design optimization campaign modeDesign units ass
41、essed by experts using scientific groupFrance, in accordance with contemporary reducing the project applicable, economic, aesthetic cost on to rack their brains to improve principles and advanced technology,design quality, strive to put the designreasonable structure to meet phase of the project cos
42、t control building energy efficiency and approval of the investment ceiling. environmentalrequirements, 3.3 Strengthening the designcomprehensive assessment of the stage merits of the program design,The design phase to strengthenselection of the best determinationsupervision of the Commissioner toof
43、 the successful program.determine a reasonable design,Successful investment programmature technology, reduction in theestimated to be close to the general construction phase major design construction project scope of changes and changes in the program, investment. This means two design in the effect
44、ive control of the project contracts will help design the cost will play a role. 1 to the design of program of choice and competition to the project if the project supervision ensure that the selected design to get involved, excluding unfavorable advanced technology, unique novelty, factorsmay gener
45、ally is excludedadaptability, as well as to control thefrom the 80% errors. In the entirecost of the project. Designunits process ofbuildingcost control,should strive to improve their qualityconstruction began at best to saveof the project design clever idea, and invest 20%, the key lies in theconst
46、ructionphaseofthe and study, to the design staff costs, toidentificationandcontrolcosts.assist them in the investmentlimit withinSupervision ofthe designphaselimits designed to save and invest.Toinclude: DesignInstitute under theseek a one-time small investmentanddesigndrawingsand noteshelpeconomic
47、good design program madeownersdeal with differentdesignthe most rational economic indicators.optionsfor theeconomy,capital3.4 Design actively promote theexpendituretodevelop theso-called cap limit designpreliminary estimates, to ensure that Even with the approval of the the investment can be most de
48、sign task and investment effectively utilized. With the owners of estimates, guarantee the functional the Commissioner include:requirements of the premise. TheAccording to the Design Institute to preliminary designand controlprovide design drawings and notes tobudget, according to the help owners de
49、al with different designpreliminaryapprovalof the totaloptions for the economy, capitalbudget for the design and expenditures to develop the preliminary construction design control. Limits, plan to ensure that investment can beand every one professional, each of most effectively used; with the owner
50、s of whom have a design threshold of a differentdesignoptions, the need totarget.In thedesignprocess,calculate theirownmaterials anddesigners shouldprogressto moreequipment to conduct a cost analysisprograms, design optimization,ensuring that the design is managementonly emphasizestechnically advanc
51、ed and reasonable, innovative, stylish, and do not break the limit investment objectives, thus eliminating the engineering design raise the factor of safety and design standards, or only consider the technical feasibility of the program, rather than economic rationality phenomenon, the project cost
52、to ensure effective control.Also known as the value of value engineering analysis, is a modern scientific management technique, is a new techno-economic analysis, is the product of functional analysis to conserve resources and reduce the cost of the purpose of an effective method. It made up for the
53、 traditional cost management simply focus on cost reduction and qualityimproving the quality deficiencies, construction is conducive to resolving the long-standing long period, a lot of wastage, poor quality, high-cost problems.ValueEngineeringlawsgenerallydividedinto threesteps:assessment of the de
54、sign of object technologyandeconomicScore;Calculation of the target group of technical and economic indicators; calculate the geometric design of the object, on average; from comparison choose the best design.4 Construction phase of the project implementation unit construction cost managementIt is r
55、easonable to control the costof the project in the project to meet quality standards premise, in the investment decision-making stage,可编辑the design phase and constructionprocess of project management.phase of the project put the projectProject implementation phase of可编辑approval occurred in the contr
56、ol limits, strive in various construction projectsthe project cost managementcanbe dividedinto three parts: therational use of human, material and tender management, constructionfinancial resources to achieve goodmanagementand settlementinvestment returnsand social management.benefits.4.1 Bidding fo
57、r the constructionThe project cost controlandphase of the construction unitsmanagement is a dynamic process.The dynamic market economy, to make the investment in the identification and control become more complex, this will require the construction units to the management of project cost to the proj
58、ect runs through the entire process, it is necessary to have a comprehensive focus.The implementation phase of the project cost management is the implementation of the entireBidding system control engineering cost effective means, bid organization can improve the cost-effectiveness of construction projects and ensure the quality of construction projects, shortening the construction cycle return on the investment, construction units can take full advantage of bidding for th
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 山西省运城市重点中学2024-2025学年高三下学期单元检测试题物理试题含解析
- 山西能源学院《建筑环境交互原理》2023-2024学年第一学期期末试卷
- 吉林省四平市公主岭市第五高级中学2024-2025学年高中毕业班第一次诊断性检测试题语文试题含解析
- 上海市浦东新区第一教育署市级名校2025届初三3月中考适应性调研考试数学试题试卷含解析
- 2025年药剂师资格考试试卷及答案
- 2025年体育教师招聘考试真题及答案
- 辽宁生态工程职业学院《熔焊原理》2023-2024学年第二学期期末试卷
- 2025年土木工程施工管理考试试卷及答案
- 景德镇陶瓷大学《运动心理学》2023-2024学年第一学期期末试卷
- 吉林省前郭尔罗斯蒙古族自治县重点中学2025年初三仿真模拟(二)生物试题试卷含解析
- 主动脉夹层病人的健康宣教
- 2025贵州省专业技术人员继续教育公需科目考试题库(2025公需课课程)
- 《危险化学品企业安全生产标准化规范》专业深度解读与应用培训指导材料之4:5管理要求-5.3 安全生产信息与合规审核(雷泽佳编制-2025A0)
- 车辆采购、维修服务投标方案
- 北师大版英语八年级下册 Unit 4 Lesson 11 Online Time 课件(30张PPT)
- 浅析商业综合体的消防疏散
- 红金大气国际护士节表彰大会PPT模板
- 贝多芬F大调浪漫曲—小提琴谱(带钢伴谱)
- 形式发票格式2 INVOICE
- CDR-临床痴呆评定量表
- 设备计算与选型——孙景海
评论
0/150
提交评论