版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Date : 2007.01.171、CURRENT STATUS:PROJECT:Latte printerLINE:Main frame & sub lineOperators (original):Leader : 2 EARepairer: 1EAMobile OP: 1EADirect OP: 20EA(Main line)Direct OP: 17EA(Five Sub)Total Operators:41 EATake Time:45 SecTarget Capability:80pcs/hExpectation Effect:Planning ActionReduce the
2、headcount 1.Balance the line; 2.Optimize operation; 3.reduce transitReduce Lead time1.reduce over production; 2.reduce WIPIncrease the value of space1.change layout ; 2.reduce over productionImprove quality1.reduce transit ; 2.using fixture to fool proofingLine Status:Line Area:=12M*6.6M-8*1.5 =67.2
3、mm2、MAIN LINE & SUB LAYOUT (original)12M6.6M8M1.5M3. WORK SAMPLING STATISTICS & H/C EVALUATION:4.Main Line & Sub Layout (improved)Line Status:Line Area:12M*4.5M =54mm12M4.5M5. PROCESS FLOW CHART MainFrameBarrow,70m,40EA/time(16EA/BOX)AssemblyBarrow,5m,36EA/time(12EA/BOX)Left FrameAssemblyRight Frame
4、ACMGear TrainDuplex AssyBarrow,70m,160EA/time(80EA/BOX)Barrow,10m32EA/time(16EA/BOX)MainFrameAssemblyLeft FrameAssemblyRight FrameACMGear TrainDuplex AssyChange6.6.BALANCE PRODUCTION LINE Eliminate waiting, Neither make anybody too busy, Nor make anybody too free! Only a Fair Environment is able to
5、found high work morale.7. DIFFERENCE差异项目 Difference Item当前实际 Actual改善后 Improved比率 Ratio备注 Remark人员 Human Leader210.50 Now we dont need to transit five sub to main line.Repairer111.00 Mobile OP111.00 Direct OP37280.76 Total41310.76 设备/夹具 FixtureFixture18110.61 Rack200.00 Screw driver21200.95 Screw Su
6、pplier661.0 占用面积 Area67mm54mm0.80 Lead Time ( hour )1.42 0.66 0.46 每小时人均产能 Capability PPH2.16 2.86 1.32 8-1. DETAIL OF KAIZEN(1) Before ImprovingAfter ImprovingType of Waste Improving ActionTransportation: Ops need transit printer from conveyer belt to workstation. Use roller line, So Ops dont need
7、to transit printer from conveyer belt to workstation. And every Op will almost reduce a little transportation.8-2. DETAIL OF KAIZEN(2) Before ImprovingAfter ImprovingType of Waste Improve ActionMotion: Materials isnt appropriate level of reachPut screw driver on material bracket ,So the distance fro
8、m screw driver to screw hole is much shorter then before. In line there are many station like this.8-3. DETAIL OF KAIZEN(3) Before ImprovingAfter ImprovingType of Waste Improve ActionOver-processing, Transportation , Inventory, Over production, Defect: Pool layout make almost these five types waste
9、in old line.Redesign new “JIT” layout ,Reduce Batch Size to “one piece flow”. (please refer 4.Main Line & Sub Layout (improved)8-4. DETAIL OF KAIZEN(4) Before ImprovingAfter ImprovingType of Waste Improve ActionMotion: Switch used with foot press, Op would keep one leg standing, that made them tired
10、.Put switch on collet,Op can press the switch in the same time when move to the relevant position.Switch used with footSwitch used with finger8-5. OTHER KAIZEN (1)Before ImprovingAfter ImprovingType of Waste Improve ActionMotion/Cost: The part put one side(A side)to opposite side(B side) from A fixt
11、ure to B fixture.Improve a little A fixture ,Then the part can be put on one fixture, whenever A side or B side. Total Seven fixture eliminate in new line.B sideSwitch used with fingerA sideA sideB side8-6. OTHER KAIZEN (2)Before ImprovingAfter ImprovingType of Waste Improve ActionCost :The metal claw is expensive (142RMB/set),and they are easy to damaged, We need to replace them ter
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 畜禽屠宰无害化处理工复测水平考核试卷含答案
- 乙炔发生工岗前沟通协调考核试卷含答案
- 煤焦油加氢制油工创新意识知识考核试卷含答案
- 玻璃制品热加工工岗前理论综合技能考核试卷含答案
- 石英手表装配工岗前绩效目标考核试卷含答案
- 钟表零件加工工岗前技能竞赛考核试卷含答案
- 金属铬浸滤工创新实践竞赛考核试卷含答案
- 拖拉机机械加工生产线操作调整工操作规程水平考核试卷含答案
- 食品安全管理师安全管理水平考核试卷含答案
- 摩托车装调工班组考核评优考核试卷含答案
- 分子蒸馏完整版本
- 转动设备的检修课件
- 波动光学及医学应用-课件
- 不同水质与底质条件对沉水植物的生长影响差异研究的开题报告
- 一年级-民族团结教育主题班会
- 小动物常规临床检查皮肤
- 三好三维构造识图题库
- TCCUA 003-2019 金融信息科技服务外包风险管理能力成熟度评估规范
- 湖北省建筑工程施工统一用表(2023年版全套)
- 烟草专卖违法行为课件
- YY/T 0634-2022眼科仪器眼底照相机
评论
0/150
提交评论