1、Dig tal y signed byDN cn= o=设计工程 ou=亚洲不动产=aaron linwalmart com c=USDate 2017 11 14 11 25 03+0800CHANGE ORDER FORMProject Name亩Walmart The Mall Nanchang project亩Project Number亩60442816C nt Walmart Asia Reality Property Development (Nanchang) CO.,PCMShanghai BranchContractor/r/GDWJ、Contractor/ cr No.1
2、59293Contract NameELV work sub-contractGeneral contractorGJJS Contractor/ cr No.136689Contract NumberInitiated ByC ntPCMQSDesignerContractorOther亮CO No.3501-ME-001-CO-003Ref PMI No.亩Description of Changes Additional change requests were raised by WaRealty on distribution system. The ELV drawings was
3、 updated according to these changes on electrical drawings, and these ELV works are to be detailedly designed and then implemented by ELV contractor. These works briefly described as BA systems design change based on Ee-CH-14,16,17. (Related ELV design change is Ee-CH-14 iner distribution design. De
4、tails please refer to-RFI-014, the item on additionaler for advertising lighting box.Notes: the design fee portion he RFI will be charged separa y he LDIs change order). , BA 14,16,17(亩 -RFI-014亩RFIWaRealty confirmed theer demand, and the ELV drawings were detailedly designed by ELV contractor accor
5、ding to these changes, and these ELV woks are to be implemented by ELV contractor. These works briefly described as BA systems design change based on Ee-CH-14,16,17. (Related ELV design change is Ee-CH-16,17, detaileder demand please refer to 3305-GJJS-RFI-045, the item on theer design for advertisi
6、ng panels on facade.) BA 14,16,17(亩16,173305-GJJS-RFI-045亩1.0 Schedule ImpactNo2.0 Cost ImpactItemDateCost breakdownDESCRIPTIONTOTAL PRICE()RemarkCodeDetailed DescriptionRMB12017-8-3035406Small Current System (PA, Communication,ephone, Security, CATV, CCTV, People Counting & etc.)BA system adjusted
7、based on design change no. Ee-CH-14,16,17BA14,16,17158,484.00 1.傼 仍95%2 仍5%TOTAL (Lump Sum)158,484.003.0 Other ImpactSupportingsC nt InstructionChange review form(Att 3)(3)3 Gleeds Request For Information (Att1)( 1)1 RFI ()PM Instruction亩Design Change NoticeOthers (Pls. Specify) (Att2,4)(2,4)2: ()4
8、Contractor/r/DrawingsConfirmation to Change OrderC ntGeneral ContractorContractor/r/NameDateC ntProject Manager亩Project Manager亩,.THISIS VALID ONLY IF SIGNED BY THREE PARTIES.附件1 RFI 节选=aar,c=USDate: 2017.04.20 16:06:50 +0800Request for Information (RFI)Project Information:RFI Number:亩 RFI Project N
9、ame:Contract Package and亩Contactor:Originator Name:Initial DateRespondent NameDate Response Due:Subject仈er Distribution DesignOriginator Proed Information:亩BackgroundRegarding theer distribution system design, the following requests are raised:1. waRealty requested someer demand on the following ite
10、ms. See Appendix 1 for the specific requirements. waRealty亩1.Wayfiding system signsAdvertising lighting box 3). Kiosk sockets4). Promotion eventsSams thermal roll-up doorr provided theer demand. Leasing terovided theer demand from tenants. See Appendix 2 for the specific requirement.Solutions evalua
11、teddesign team shall overall design theer distribution system, together with regular sockets, lighting fixture in common area, and road ls on e:PCM suggest the design work to be performed by LDI. Construction work to be performed by GC PCMPre-Estimation SCHEDULE IMPACT:Rough Estimate On S
12、cheduleDESIGN COST IMPACT:Rough Estimate On DesignCONSTRUCTION COST IMPACT:Rough Estimate On ConstructionPROJECT BUDGET IMPACT:Rough Estimate OnBudget亴SupportingAppendix1 er requirement Appendix2 er demand for tenants Appendix3 Design fee pro alCatergory of RFI RFIValue Engineering Design Negligence
13、/Omis/C nt WorksSpecificationss / I esProject Acceleration亩Actual Field Routing Conditions/ I esScopesOther, Provide ExplanationPMDate Submitted2017-4-18亩Response to RFIResponse:Respondents Signature:Digitally signed byDate Responded:DN: cn=o=设计工程, ou=亚洲不动产28,100 RMBNOYESNOYESNOYESNOYES2017-4-20waRe
14、alty_C nt2017-4-18The Mall Nanchang Project亩-RFI-014 3305-GJJS-RFI-024DesignLDI/construction: GC _PCM+0800Request for Information (RFI)PRFI Number:RFIPContract Package andContactor:OInitial DateRDate Response Due:SPecathlon logo and basketball courtOBTt on April 1.Ton April 24.Tonfirmed by c nt on M
15、ay 24.D, theer design only includes the feed to the Decathlons owner distribution room. The detaileder design for thTntedhe design change.SAAed by LDI. The construction will be done by GC.APSRough Estimate On ScheduleDRough Estimate On DesignCRough Estimate OnConstructionPRough Estimate OnBudgetSC/u
16、esns/ I esPMDate Submitted2017-6-14Response to RFIResponse:Digitally signed byDN: cn=o=设计工程 ou=Respondents亚洲不动产,Date Responded:Signature:c=US =aar,Date: 2017.06.17 12:48:50RMB 165,000NOYESNOYESNOYESNOYES2017-6-162017-6-143305-GJJS-RFI-045General contractuoji construction group Co., (GJJS)/附件2 供应商报价(
17、含图纸)变更单变更金额备注1Ee-CH-1444,731.442Ee-CH-16108,988.883Ee-CH-1728,027.79总计181,748.11Ee-CH-14项目描述品牌型号数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:增加一个照明箱CXAL1的BA控制接入,S1-CXAL和S1-RKAL两个照明箱移位配合改线;ADDC控制器箱NrA.01直接数字控制器NrHONEYWELLPUB6438SR32,710.0045.002,755.008,265.00A.02Sylk IO 扩展模块ANrHONEYWELLSIO1200021,750.0054.001
18、,804.003,608.00A.03Sylk IO 扩展模块BNrHONEYWELLSIO604211,860.0054.001,914.001,914.00A.04Sylk IO 扩展模块CNrHONEYWELLSIO402211,720.0054.001,774.001,774.00A.05DDC控制箱,包括空气开关,接线端子排,导轨NrHONEYWELLDDC-JX-L11,780.00450.002,230.002,230.00BSC20m广州珠江20*1.25504.206.3010.505,775.00DRS485总线:RVSP2*1.5m帝一RVSP2*1.53003.830.
19、904.731,419.00E电源线:RVV 3*1.5m帝一RVV3*1.53004.401.355.751,725.00F控制线:RVS 2*0.75m帝一RVS 2*0.752001.370.902.27454.00G控制线:RVS 4*0.75m帝一RVVS 4*0.752003.261.354.61922.00H控制线:RVS 6*0.75m帝一RVVS 6*0.7525004.621.355.9714,925.00I镀锌线槽m宏际100*100mm10041.0022.5063.506,350.00合计43,011.00税费(4%)1,720.44总计44,731.44Ee-CH-
20、16项目描述品牌型号数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:楼层照明箱增加控制点位;A.01直接数字控制器NrHONEYWELLPUB6438SR92,710.0045.002,755.0024,795.00A.02Sylk IO 扩展模块ANrHONEYWELLSIO1200061,750.0054.001,804.0010,824.00A.03Sylk IO 扩展模块BNrHONEYWELLSIO604231,860.0054.001,914.005,742.00A.04Sylk IO 扩展模块CNrHONEYWELLSIO402241,720.0054.00
21、1,774.007,096.00BSC20m广州珠江20*1.26004.206.3010.506,300.00CSC25m广州珠江25*1.610005.856.3012.1512,150.00DRS485总线:RVSP2*15m帝一RVSP2*1.55003.830.904.732,365.00E电源线:RVV 3*1.5m帝一RVV3*1.55004.401.355.752,875.00F控制线:RVS 2*0.75m帝一RVS 2*0.7528751.370.902.276,526.25G控制线:RVS 4*0.75m帝一RVVS 4*0.7528753.261.354.6113,25
22、3.75H控制线:RVS 6*0.75m帝一RVVS 6*0.7510004.621.355.975,970.00I镀锌线槽m宏际50*50mm20016.5018.0034.506,900.00合计104,797.00税费(4%)4,191.88总计108,988.88Ee-CH-17项目描述品牌型号数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:增加智能接入ASC20m广州珠江20*1.24004.206.3010.504,200.00B控制线:RVS 4*0.75m帝一RVVS 4*0.758003.261.354.613,688.00变更内容:增加光纤A.01光纤
23、交接箱ODF(24芯单模,含尾纤、耦合器)套TCL-3265100(24芯单模,含尾纤、耦合器)21,950.00198.002,148.004,296.00A.02光模块个HX121 1G SFP LC SX21,420.0013.501,433.502,867.00TransceiverA.03LTE套光桥GQ5143-SSC-202380.0018.00398.00796.00-1光4电口B6芯单模光纤mTCL-3251506L9805.362.257.617,457.80每处LED屏需要12芯,放两根6芯光纤可满足CJDG25m广州珠江25*1.63005.856.3012.153,6
24、45.00合计26,949.80税费(4%)1,077.99总计28,027.79楼宇设备自动控制系统照明新增点表序号楼层DDC箱电箱受控设备设备数量运行状态手自动状态设备注停控一、新增1负二层负一层DDC-B2-1B2-RAL1照明预留3条回路控制3333对应Ec-CH- 16号变更单1B2-RAL1照明根据配电图增加11112DDC-B2-3B2-RAL2照明预留3条回路控制33332B2-RAL2照明根据配电图增加22223DDC-B2-4B2-RAL3照明预留3条回路控制33333B2-RAL3照明根据配电图增加11114DDC-B2-6B2-RAL4照明预留3条回路控制33334B2
25、-RAL4照明根据配电图增加22225DDC-B1-1B1-1AL照明根据配电图增加11115B1-1AL照明预留3条回路控制33336DDC-B1-9B1-4AL照明预留3条回路控制33336B1-4AL照明根据配电图增加22227DDC-B1-11B1-3AL照明预留3条回路控制33337B1-3AL照明根据配电图增加11118B1-5AL照明预留3条回路控制33338B1-5AL照明根据配电图增加11119DDC-B1-13B1-RAL3照明预留3条回路控制33339B1-RAL3照明根据配电图增加111110DDC-B1-20B1-RAL2照明预留3条回路控制333310B1-RAL2
26、照明根据配电图增加1111一层DDC-1-12CXAL1促销照明根据配电图增加10101010对应Ec-CH- 14号变更单11三层DDC-3-8S3-2AL1照明预留5条回路控制5555对应Ec-CH- 16号变更单11S3-2AL1照明根据配电图增加5555新增控制回路合计:28新增控制点位合计:84二、修改1一层DDC-1-4S1-CXAL照明根据图纸移位10个回路10101010对应Ec-CH- 14号变更单2S1-RKAL照明根据图纸移位10个回路10101010移位回路合计:20移位点位合计:60序号楼层DDC箱电箱受控设备数量运行状态手自动状设备启停控材料类型(单点长度:含水平长
27、度、垂直长度、弯曲及跨接)小计14号变更单SC2 0SC25镀锌线槽6芯单模光纤RVSP2*1.5RVV3*1.5RVS2*0.75RVS4*0.75RVS6*0.75SC20SC25镀锌线槽6芯单模光纤RVSP2*1.5RVV3*1.5RVS2*0.75RVS4*0.75RVS6*0.751一层DDC-1-12CXAL1促销照明1010101039020015020203902001502002002一层DDC-1-4S1-CXAL照明101010108050100150150805010015015003一层S1-RKAL照明10101010805010080501000合计5501003
28、00300200200250016号变更单1负二层DDC-B2-1B2-RAL1照明111150909011010050502702703302DDC-B2-3B2-RAL2照明222250100301121121501003055404484483DDC-B2-4B2-RAL3照明111172107772150724504DDC-B2-6B2-RAL4照明222245983010075901963057504004005负二层DDC-B1-1B1-1AL照明111150841105048403362206DDC-B1-9B1-4AL照明2222658050110110195160504440
29、4404407DDC-B1-11B1-3AL照明1111255020909075502052553603608B1-5AL照明1112046502402049DDC-B1-13B1-RAL3照明1134012010DDC-B1-20B1-RAL2照明11160300225合计6001000200500500287528751000号变更单智能接入650增加光纤150490300980合计400300980650附件3 Gleeds审核意见汇总表承包商报价Gleeds审核变更金额备注38,989.3994,976.9624,518.00158,484.35变更单变更金额1Ee-CH-1444,7
30、31.442Ee-CH-16108,988.883Ee-CH-1728,027.79总计181,748.11Ee-CH-14Gleeds审核承包商报价数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价32,710 0045.002,755.008,265 00PUB6438 SR21,750 0054.001,804.003,608 0011,860 0054.001,914.001,914 0011,720 0054.001,774.001,774 0011,780 00450.002,230.002,230 00DDC-Panel-L3204.206.3010 503,360 0
31、01703.830.904.73804.101504.401.355.75862 502001.370.902 27454 001203.261.354 61553 2020004.621.355 9711,940 005016 5018.0034 501,725 0050*50mm37,489 801,499.5938,989.39项目描述品牌型号数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:增加一个照明箱CXAL1的BA控制接入,S1-CXAL和S1-RKAL两个照明箱移位配合改线;ADDC控制器箱NrA.01直接数字控制器NrHONEYWE LLPUB6438SR
32、32,710.0045.002,755.008,265.00A.02Sylk IO 扩展模块ANrHONEYWE LLSIO1200021,750.0054.001,804.003,608.00A.03Sylk IO 扩展模块BNrHONEYWE LLSIO604211,860.0054.001,914.001,914.00A.04Sylk IO 扩展模块CNrHONEYWE LLSIO402211,720.0054.001,774.001,774.00A.05DDC控制箱,包括空气开关,接线端子排,导轨NrHONEYWE LLDDC-JX-L11,780.00450.002,230.002,
33、230.00BSC20m广州珠江20*1.25504 206.3010.505,775.00DRS485总线:RVSP2*1.5m帝一RVSP2*1 53003 830.904.731,419.00E电源线:RVV 3*1 5m帝一RVV3*1 53004.401.355.751,725.00F控制线:RVS 2*0.75m帝一RVS 2*0.752001 370.902.27454 00G控制线:RVS 4*0.75m帝一RVVS 4*0.752003 261.354.61922 00H控制线:RVS 6*0.75m帝一RVVS 6*0.7525004 621.355.9714,925.00
34、I镀锌线槽m宏际100*100mm10041 0022.5063.506,350.00合计43,011 00税费(4%)1,720.44总计44,731.44Ee-CH-16承包商报价Gleeds审核数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价92,710 0045.002,755 0024,795 0061,750 0054.001,804 0010,824 0031,860 0054.001,914 005,742.0041,720 0054.001,774 007,096.006004.206.3010.506,300.0010005.856.3012.1512,150
35、005003.830.904.732,365.003204.401.355.751,840.0020001.370.902.274,540.0015003.261.354.616,915.006004.621.355.973,582.0015016.5018.0034.505,175.0091,324 003,652.9694,976.96项目描述品牌型号数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:楼层照明箱增加控制点位;A.01直接数字控制器NrHONEYWE LLPUB6438SR92,710.0045 002,755.0024,795.00A.02Sylk IO
36、 扩展模块ANrHONEYWE LLSIO1200061,750.0054 001,804.0010,824.00A.03Sylk IO 扩展模块BNrHONEYWE LLSIO604231,860.0054 001,914.005,742.00A.04Sylk IO 扩展模块CNrHONEYWE LLSIO402241,720.0054 001,774.007,096.00BSC20m广州珠江20*1 26004.206.3010.506,300.00CSC25m广州珠江25*1 610005.856.3012.1512,150.00DRS485总线:RVSP 2*1.5m帝一RVSP2*1
37、.55003.830.904.732,365.00E电源线:RVV 3*1.5m帝一RVV3*1.55004.401.355.752,875.00F控制线:RVS 2*0.75m帝一RVS 2*0.7528751.370.902.276,526.25G控制线:RVS 4*0.75m帝一RVVS 4*0.7528753.261.354.6113,253.75H控制线:RVS 6*0.75m帝一RVVS 6*0.7510004.621.355.975,970.00I镀锌线槽m宏际50*50mm20016.5018 0034.506,900.00合计104,797 00税费(4%)4,191.88总
38、计108,988.88Ee-CH-17承包商报价Gleeds审核数量综合单价合价注释主材价格人工安装,机械及调试单价综合单价3204.206.3010.503,360.006003.261.354.612,766.0021,950 00198.002,148.004,296 0021,420.0013.501,433.502,867 002380.0018.00398.00796 008005 362.257.616,088 00每处LED屏需要12芯,放两根6芯光纤可满足2805 856.3012.153,402 0023,575 00943 0024,518 00项目描述品牌型号数量综合单
39、价合价注释主材价格人工安装,机械及调试单价综合单价变更内容:增加智能接入ASC20m广州珠江20*1.24004.206.3010.504,200.00B控制线:RVS 4*0.75m帝一RVVS 4*0.758003.261.354.613,688.00变更内容:增加光纤A.01光纤交接箱ODF(24芯单模,含尾纤、耦合器)套TCL-3265100(24芯单模,含尾纤、耦合器)21,950 00198.002,148.004,296 00A.02光模块个HX121 1G SFP21,420.0013.501,433.502,867 00SX TransceiverA.03LTE套光桥GQ51
40、43-SSC-202380.0018.00398.00796 00-1光4电口B6芯单模光纤mTCL-3251506L9805 362.257.617,457 80每处LED屏需要12芯,放两根6芯光纤可满足CJDG25m广州珠江25*1.63005 856.3012.153,645 00合计26,949 80税费(4%)1,077 99总计28,027.79楼宇设备自动控制系统照明新增点表运行状态手自动状态设备停控序号楼层DDC箱电箱受控设备设备数量注一、新增11B2-RAL1照明预留3条回路控制3333DDC-B2-1B2-RAL1照明根据配电图增加1111照明预留3条回路控制22B2-R
41、AL23333DDC-B2-3照明根据配电图增加B2-RAL22222负二层照明预留3条回路控制33B2-RAL33333DDC-B2-4照明根据配电图增加B2-RAL31111照明预留3条回路控制44B2-RAL43333DDC-B2-6照明根据配电图增加B2-RAL42222照明根据配电图增加55B1-1AL1111DDC-B1-1照明预留3条回路控制对应Ec-CH- 16号变更单B1-1AL3333照明预留3条回路控制66B1-4AL3333DDC-B1-9照明根据配电图增加B1-4AL2222照明预留3条回路控制7788B1-3AL3333照明根据配电图增加B1-3AL1111负一层D
42、DC-B1-11照明预留3条回路控制B1-5AL3333照明根据配电图增加B1-5AL111199B1-RAL3照明预留3条回路控制3333DDC-B1-13B1-RAL3照明根据配电图增加11111010B1-RAL2照明预留3条回路控制3333DDC-B1-20B1-RAL2照明根据配电图增加1111对应Ec-CH- 14号变更单一层促销照明根据配电图增加DDC-1-12CXAL110101010照明预留5条回路控制11S3-2AL15555对应Ec-CH- 16号变更单三层DDC-3-8照明根据配电图增加11S3-2AL15555新增控制回路合计:28新增控制点位合计:84二、修改照明根据图纸移位10个回路12S1-CXAL10101010对应Ec-CH- 14号变更单一层DDC-1-4照明根据图纸移位10个回路S1-RKAL10101010移位回路合计:20移位点位合计:60工程量计算手自动状态设备启停控制序号楼层DDC箱电箱受控设备数量材料类型(单点长度:含水平长度、垂直长度、弯曲及跨接)小计运行状态SC2 SC2 镀锌线槽6芯单模光纤RVSP2*1 RVV3*1.5 RVS2*0.75 RVS4*0.7 RVS6*0.7SC2 0SC2 镀锌线槽6芯单模光纤RVSP2*1 RVV3*1.5 RVS2*0.7 RVS4*0.7 RVS6*0.714号变
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026住院医师规培-江苏-江苏住院医师规培(感染科)历年参考题库含答案详解
- 2026云南卫生系统招聘考试(耳鼻喉科)历年参考题库含答案详解
- 2026事业单位笔试-贵州-贵州急诊科(医疗招聘)历年参考题库含答案详解
- 2026事业单位笔试-新疆-新疆肿瘤科(医疗招聘)历年参考题库含答案详解
- 2026事业单位笔试-北京-北京中药学(医疗招聘)历年参考题库含答案详解
- 2026事业单位工勤技能-黑龙江-黑龙江工程测量员一级(高级技师)历年参考题库含答案详解
- 2026事业单位工勤技能-重庆-重庆汽车驾驶与维修员五级(初级工)历年参考题库含答案详解
- 2026事业单位工勤技能-贵州-贵州计算机文字录入处理员五级(初级工)历年参考题库含答案详解
- 单元二任务一将软件需求转化为测试需求
- 程序员双列式商务风职场人简历模板
- 华文版六年级上册书法教案
- 县域精神富有评价指南
- 20CJ88-1 20CS02-1 餐厨废弃物智能处理设备选用与安装图集(一)
- 《光伏发电工程可行性研究报告编制规程》(NB/T32043-201)中文版
- 建设法规与案例分析教案
- 医疗废物和污水管理领导小组及岗位职责
- 第八版妇产科学配套ppt课件-妊娠特有疾病
- PHP+MySQL动态网站开发基础教程全套完整教学课件
- 端点效应(共12张PPT)
- 体育教学团队申请
- GB/T 1216-2004外径千分尺
评论
0/150
提交评论