1、新发展奥克兰中心中船九院深化设计说明暖通空调NDG AUCKLAND CENTRENDRI DEVELOPED DESIGN REPORT HVACPrepared by NDRIRev.D30 Aug 201530Aug15ReviHistoryDierThis is a translated. It is provided strictly for convenience pures only. NDRI dis and excludes allliability and responsibility (whether in contract, tort (including neglig
2、ence), pursuant to sute or on any other basis inlaw, equity or otherwise) for any loss whatsoever whiay be suffered as a result of any reliance by anyonthisbet. Any reliance on thisis entirely atts risk. In the event of any inconsistencyn this translatedand the English language ver, the Chilanguage
3、vershall prevail.Acceptance30Aug15ActionNameSignedDatePrepared byLUO Yalei30 Aug 2015Reviewed bySun Wentong30 Aug 2015Approved bySun Wentong30 Aug 2015on behalf ofNDRIReviNPrepared ByDescriptionDateALUO YaleiHVAC Preliminary Design Report30 April 2015BLUO YaleiRevised Edition after Shanghai Workshop
4、 in May, 201530 June 2015CLUO YaleiHVAC Developed Design Report30 August 2015目录/Table of Contents设计依据/DESIGN BASIS1设计参数/DESIGN CONDITION2通风设计/VENTILATION DESIGN2空调设计/AIRCONDITION DESIGN4防火及防、排烟设计/SMOKE CONTROL DESIGN6建筑设备自动化管理系统/BUILDING EQUIPMENT AUTOMATION MANAGEMENT SYSTEM 7 7节能设计/ENERGY CONSERVA
5、TION DESIGN88管材及保温/MATERIAL AND INSULATION9APPENDIX A1 封闭车道风量计算/AIR FLOW RATE CALCULATION FOR DRIVEWAYAPPENDIX A2 主要设备表/SCHEDULE OF MAIN EQUIPMENTS30Aug15设计依据/Design BasisNDG 业主方的要求/Requirements of NDG新西兰建造规范及标准/NZ Building Code and Design Standards1新西兰工程师发布的设计文件指导/Designation Guidelines Ied by NZCI
6、C九院提供该指导文件中针对建筑专业在初步设计阶段所要求的,并适用于本项目现阶段情况的文件。丽思酒店设计标准/Design Standards of RitzCarlton Ho-The RitzCarlton Hos, HoDesign Standards Rev. January 2014Module 14 Fire Protection & Life Safety, Rev. June 2014奥克兰市政规划部门的公司的专业建议/Profes意见/Offil Advifrom Auckland Councilal Advifrom BECA其他顾问公司的建议/Other Consultan
7、ts Advice130Aug15ItemStandardMechanical (HVAC)NewZealand StandardsNZS 4303:1990 Ventilation for acceptable indoor air qualityAS/NZS 1668.1:2002 The use of mechanical ventilation and air conditioning in buildings Fire and smoke controlAS 1668.2:2002 The use of mechanical ventilation and air condition
8、ing in buildings Ventilation design for indoor air contaminant controlAS/NZS 5601.1:2013 Gas installationsNZS 4219:2009 Specification for seismicof engineering systems in buildingsNZ Department of Labour: Approved Code of Practice for the Design, Safe Operation, Maenance and Serving of BoilersNew Ze
9、aland Building Code:CompliancesD1 Ac s Routes E1 Surface WaterE2 External Moisture E3 ernal Moisture F4 Safety from FallingF6 Visibility in EscRoutes F8 SignsG1al Hygiene G2 LaunderingG3 Food Preparation and Prevention of Contamination G4 VentilationG5erior EnvironmentG6 Airborne and Impact Sound G7
10、 Natural lightG8 Artifil light G12 Waters G13 Foul Water G15 Solid WasteH1 Energy Efficiency2设计参数/Design Condition室外气象设计参数/Local Calculate Criteria室内设计参数/Indoor Criteria注:酒店部分的4303:1990 要求。密度、最小新风量参照 Ritz 及 NZS 4303:1990 要求中的大值;非酒店部分参照 NZSNote: Greater one of occupancy and outdoor air flow rate from
11、 The RitzCarlton Hos, HoDesign Standards or NZS4303:1990 are chosen for hoarea. For retail, NZS 4303 is compd with.3通风设计/Ventilation Design建筑包含地库、裙房和塔楼三部分。其中 B5B3 为车库;B2 为各类站房和酒店后勤,B1L6 为商业,L7L49 为丽思酒店。There are three parts: car park, podium and tower. B5B3 is basement car park; On B2, there are pla
12、nts andhoBOH. B1L6 is retail, L7L49 is the RitzCarlton Ho.车库/Car Park1) 系统的设计及选择/Design of the System:B5B3 为风量根据第出。车库,根据 AS/NZS 1668.2:2002 中 section7车库设置机械通风系统。机械通风的排7.5.4.2 的三种方式计算,按最大的计算值选择排风风机。排风接至排风竖井,在 L3 排230Aug15空间Space夏季Summer冬季Wer密度Occupancy(m2/p)最少新风供应量Outdoor Air (l/s.m2)照明散热量um Lighting
13、 Load(W/m2)噪音Noise RatingNC酒店 Ho大厅Lobby22/50%2132.644335宴会厅Ballrooms22/50%2114.45435宴会前厅 Pre Function22/50%2112.85435餐厅Restaurants22/55%21175435会议室 Meeting Rooms22/50%21255435客房Guestroom22/50%212 人28L/s.间28l/sper room30行政酒廊Regency Club22/50%21273240d.max/day 1%W.max/day1%d.min/day 1%Auckland.Owairak
14、a27235.8后勤区B.O.H22/55%21102.74340商业 Retail公共走道Public Corridor22oC/55%20oC100.251140商场走道Retail Corridor22oC/55%20oC100.251140餐厅Restaurants22oC/55%20oC1101140商场Retails22oC/50%20oC511240Offi22C/50%20oC/40%1011135B5B3 is basement car park. According to the three formulas provided by AS/NZS 1668.2:2002 i
15、n Clause7.5.4.2, the air flow rate is calculated and then is used for the selection of exhaust air fan. The exhaust air is排风口位置/Air Discharge:3)discharge3 through exhaust shaft.排风口设在 L11 裙房屋面上,及 L30、屋面排出。Air discharges of kitchens locate in L11, the roof of the podium, while others locate in L5, L30
16、 and L46, seethe following table:L2B3 为车道,长度大于 20m,根据 AS/NZS1668.2:2002 中 section7 设置机械排风。排风量计算见 Appendix A。According to AS/NZS 1668.2:2002 section 7, the rfrom L2B3, which exceeds 20m, can be determined asdriveway and shall be ventilated by mechanical system. See Appendix A for calculation of air f
17、low rate.进、排风口位置/Air Discharge and Outdoor Air2)ake:车库的进、排风口设在 L3(Albert Street);车道排风口设在 L2(Elliott Street),采用车道L2(Elliott)自然进风。及The air discharge and the outdoor airake of the car park locate in L3, on Albert Street.The air discharge the rlocates in L2, on Elliott Street. The entrance of the rand t
18、he airake in L2,on Elliott Street are used for make up airake.酒店/Ho根据 NZS 4303:1990 及 AS 1668.2:2002 section 5、Ritz 要求设置送、排风系统。Mechanical supply and mechanical exhaust are provided based on NZS 4303:1990, AS 1668.2.:2002 section 5and the RitzCarlton Hos, HoDesign Standards.以下区域房间保持负压,设置通风系统:1)Ventil
19、ation systems are providedhe following plato maain negative prere differen:设置机械排风、机械补风系统:变配电房、水泵房、冷冻站房、锅炉房柴油发电机房等。Subsion, transformer room, pump room, central cooling plant, boiler room and etc: mechanical supplywith mechanical exhaust.设置机械排风、自然补风系统:房、卫生间Garbage chamber and public toilet: natural m
20、akeup air with mechanical exhaust.设置局部机械排风、空调补风系统:、厨房Kitchen and laundry: AHU for makeup air with mechanical local exhaust.在以下区域房间保持正压,设置通风系统:2)Ventilation systems are providedhe following plato maainitive prere differen:进风口位置/Airake:4)客房、客房走道、会议室、餐厅、酒吧、大堂公共区取风口在 L7L10 沿 Albert Street 及 L9L10 Elliot
21、t Street;Airakes for public area locate in L7L10 along Albert Street and L9L10 Elliot Street.Guestroom, guestroom corridor, meeting room, restaurant, bar, lobby330Aug15序号No.房间名称Room Name排风口位置Location of air discharge1B2 厨房、L7L9 厨房Kitchens on B2, L7L9L11(离塔楼15m) L11(Away from tower by 15m)2行政客房厨房 L12
22、L29Kitchensforexecutivesuitefrom L12L29L30(风量1000L/s,侧墙排放)L30( air flow rate1000L/s, horizontal discharge)3L47L49 厨房Kitchens on L4749屋顶Roof4B1 洗衣机房Laundry on B1L115公共卫生间(B2、L7L9)Public toilets on B2, L7L9L116客房卫生间(L12L45)Guestroom toilets on L12L45L11、L30、L467L47L49 卫生间Public toilets on L47L49屋顶Roof
23、8L2房Garbage Room on L2L5(风量1000L/s,侧墙排放)L5(air flow rate15m) L11(Away from tower by 15m)2L2房Garbage Room on L2L5(风量1000l/s,侧墙排放)L5(air flow rate1000L/s,horizontal序号No.面积Area(m2)冷负荷Cooling Load(kW)冷负荷Cooling Loer Square Meter(W/m)热负荷Heating Load(kW)热负荷Heating Loer Square Meter(W/m)备注Comment1548813800
24、70170031discharge)3楼层排风 L2L5Spill air for each floor from L2L5L4、L5药剂泵可调节电磁阀自动排污系统及以下化学药剂缓蚀剂沉淀溶解剂抗微生物药剂酸碱度值调整剂Heating hot water of 8060 provided by boilers is used as heat resource, and low temperature hot water of7060 from plate heat exchanger is used for heating for B2 and floors above L30.容器:4) 空
25、调水系统/Water Side System空调冷冻水系统采用一次泵变流量系统(由制冷机生产商提供制冷控制系统 (CCS));空调热水系统采用一次泵定流量,二次泵变频系统。Variableprimary flow chilled watumsystem is used. The chiller control system (CCS) is provided byThe cooling load for hois used for chillerection. In addition, 562kW for retail public area is takenomanufacturer. Co
26、nstant primary flow and variablesecondary flow hot watumsystem are used.account. As required by RitzCarlton, there is a 20% allowance in selection of chillers. Thus, 3 sets of watercooled centrifugal chillers (two of them are 2100kW and the third is 1050kW) are used as cooling resource.空调水系统为四系统。冷冻及
27、热水分配输送系统将按后勤区( B2 )、地上公共区域(L711)、客房(L1229)、酒店高区(L3149)四个部分分别设置供回水总管。Fourpipe system is used. The distribution of chilled water and heating hot water is based on four zones:d at 5.5One of them is heating recovery type, two of them are provided with VSD. Chilled water iand returned at 12. Chillers are
28、 placed at B1, while cooling towers are at roof of the podium. Recirculating cooling water consumption for hois 965 m3/h, calculated based on t=5.5.ppB.O.H (B2), uppublic area (L711), guestroom (L1229) and high zone of the ho(L3149). Each has itsown supply and return main pipes.空调水系统进行竖向分区。制冷机组供回水温度
29、是 5.5/12,提供低区(L7 L29)冷冻水;在 L30 设置两组冷冻水板式换热器,提供酒店高区(L31L49)6.5/13冷冻水;为降低 B2 空调设备承压,在 B1 置两组冷冻水板式换热Cooling towers are located at podium roof, assembled by five square shcooling tower, each of whichhasan ability of 200 m3/h,er of 11 kW, inlet water temperature 35 , outlet water temperature 29.5,designe
30、d wet bulb temperature 23. Recirculating cooling watump is put in central cooling planB1. Aset of automatic filter wi n ability of less n 1000 m3/h is attached to the main inlet pipe of cooling tower. To ensure the quality of circulating water, an automatic chemicals dosing system are provided to ea
31、ch recirculating cooling system, including:a Dissolved Solid Sensor b Dosing Pumpc Adjustable Electromagnetic Valve器,提供 B1 冷冻水 6.5。/13(L7 L29)空调热水由热水锅炉直接提供 8070热水。在 B1、L30 设置空调热水板式换热器,锅炉水经换热器,提供供回水温度 70/60空调热水供 B2、酒店高区(L31L49)使用。 Airconditioning water side system is separated vertically.Chillers pro
32、vide 5.5/12 chilled water to lower zone(L7L29). Two sets of plate heat exchangers are placedd Automatic Waste Discharging System and Chemicals Storageof following listed one:30 to produce 6.5/13 chilled water for high zone of the ho . In order to reduce the bearing pretwo sets of plate heat exchange
33、rs on B1 are used to produce 6.5/13 chilled water for B2. 80/70 heating hot water from boilers is provided to L729.Heating hot water is provided to the heat exchangers to get low temperature hot water of 70/60 for B2 and high zone of the ho (L31L49). The heat exchangers are placed at B1 and L30, whi
34、le the heating hot water is provided by boilers.CorroInhibitorre,AntiPrecipiion AgentAntiMicrobial AgentRegulation Agent3) 空调热源/Heating Resour:锅炉供热须满足空调、生活热水以及泳池加热的需求。供热负荷为 3380kW,配置 1350kW 的油气两用承压热水锅炉 3 台。锅炉自带节能器,最高热效率约 104%。锅炉仅在天然气停止供应燃用柴油。三台锅炉同时工作可满足峰值供热要求,两台同时工作也可满足 80%最高负荷要求。5) 空调风系统/Air Side S
35、ystems:后勤区、包房、SPA 一般采用风机盘管加新风系统,便于室温独立控制。FCU+PAU systems are used in B.O.H, VIP rooms, and SPAs for separate temperature control.大堂、全日餐厅、宴会厅及其前厅等大空间公共区域采用全空气系统,气流方式为上送上回或上送下回。锅炉燃烧烟气通过烟囱,于裙房顶排除。烟囱高出屋顶,距离旁边建筑米。6 米,距红线6 米,距主楼6空调热源为锅炉提供的 8070 高温热水,B2、L30 以上经板式换热器产生 7060的空调用热水。his building, the heating l
36、oad contains hoaircondition heating, domestic hotwater and swimming poolAHU systems are used in lobbies, all day dining rooms, ballrooms, prefunction and etc. Air iupper area and returned from upper or lower area.会议室采用 VAV 系统。VAV system is used for meeting rooms.ppd fromheating. The total heating lo
37、ad is about 3380kW, we choose three units of 1350kW dualfuel (diesel oil &gas) hot water prere boiler with economizer; the highest thermal efficiency of each boiler is about104%. The oil for boilers is only used when the nature gapply stop.Three boilers running at the same time can meet the peak hea
38、ting requirement, and two boilers running at客房层(L12L29)、(L31L45)空调采用风机盘管加独立新风的系统,其新风直接送入室内,新风空调箱集中设在 L11F、L30、L46。the same time also can meet the requirement of 80%um load.The flue gas is removed at the roof of podium. The discharge outlet shall be highern the roof,and shallbe apart from the main bu
39、ilding 6 meters, from red line 6 meters, and from other buildings 6 meters.530Aug15FCU+PAU systems are used in guestrooms (L12L29 and L31L45). Outdoor air isroom. PAUs locate in L11, L30 and L46.roduced directlyo eachd. 自动排污系统及以下化学药剂缓蚀剂沉淀溶解剂抗微生物药剂酸碱度值调整剂容器:厨房、等采用全新风空调。PAUs are used in kitchens and l
40、aundries toroduce 100% outdoor air.6) 其他/Others泳池设置专业的除湿空调机组。Packaged dehumidification type heat pump unit is used in indoor pool.机房、网络机房、消防控制中心等房间设置独立分体空调器。Retail on B1L6 consists of retail, F&B, supermarket and cinema which could be operating at different hours.Thus, outdoor air and condenser wate
41、r are provided for retail. Electricity is used for heating. Recirculating cooling water consumption for retail is 800 m3/h, calculated based on t=5.5.Cooling towers are located11, assembled by three square shcooling tower, each of which has anSplittype airconditioners are provided in rooms likefire
42、protection control centers and etc.需供应蒸汽,由专业设备公司设计安装。eone exchange rooms, network computer rooms,er of 12 kW, inlet water temperature 35 , outlet watertemperature 29.5,ability of 220 m3/h,designed wet bulb temperature 23. Recirculating cooling watump is put in L6 Mezzanine plant room. Ais needed for
43、 the laundry. The system would be designed and installed by the equipment provider.set of automatic filter witower.n ability of lessn 1000 m3/h is attached to the main inlet pipe of coolingTo ensure the quality of circulating water, an automatic chemicals dosing system are provided to eachrecirculat
44、ing cooling system, including: a Dissolved Solid Sensorb Dosing Pumpc Adjustable Electromagnetic Valve商业/Retail1) 空调冷、热负荷估算/Estimation of Cooling and Heating Load:d Automatic Waste Discharging System and Chemicals Storageof following listed one:CorroInhibitorAntiPrecipiion AgentAntiMicrobial AgentRe
45、gulation Agent3) 系统设置/System Arrangement:冷却水在 L6 夹层经板换后为闭式冷却系统,接至用户。冷却水一次侧采用定流量,二次侧采用变流量。L1L6 的公共区采用 water cooled packaged AHU;空气经处理后送至室内,气流方式为上送上回或上送下回。设可变新风比功能,过度季节可采用室外空气全新风工况运行;用户预留冷却水管及新风。Plate heat exchangers and primary watumps are placed6, sot the condenser water system is a2) 空调冷、热源/Cooling
46、 and Heating ResourB1L6 商业由零售店、餐厅、超市和closed loop on water cooled packaged unit side. Constant flow condenser watumsystem is used for院等组成。其不同的性质用途可以在不同的时间营业,因primary side. Variable flow condenser watumsystem is used for secondary side.此,商业部分提供新风(OA)和冷却水。热源采用电加热系统。空调冷却用水量为: Q=633 立方米/时,t=5.5。Water coo
47、led packaged AHUs are used for circulations on L1L6. Air ippd from upper area and returnedfrom upper or lower area. The outdoor air flow rate is adjustable. A 100% outdoor air system is available inmild weather.Outdoor air and condenser water are provided for retail.冷却塔设在 L11,采用三组方形冷却塔组合式安装,每台立方米/时,
48、N=11 千瓦,进塔水温Q=22035, 出塔水温 29.5,设计湿球温度 23。冷却循环水泵设在在 L6 夹层机房内。冷却塔进水总管上设置全自动过滤器一套,处理能力小于 1000 立方米/小时。为保证循环水水质,每套系统设全自动化投药系统,并配置如下装置:可溶解固体物测量表药剂泵可调节电磁阀5防火及防、排烟设计/Smoke Control Design1) 加压系统/Prerization根据 AS1668.1 section 9,在所有通往安全出口的楼梯提供楼梯间加压。630Aug15序号No.面积Area(m2)冷负荷Cooling Load(kW)冷负荷Cooling Loer Squ
49、are Meter(W/m)热负荷Heating Load(kW)热负荷Heating Loer Square Meter(W/m)备注Comment1226452855126100845商业公共区 562kW 的冷量由酒店冷冻机提供。562kW for retail public area is provided by hochillers.Stairwell pre9.rization to be provided in all safe path egress stairs in accordance wiS1668 Part 1 SectionRetail atrium to be p
50、rotected with high level mechanical extract (fans on L11). Make up air come fromoutdoor and AHUs. Smoke curtains are provided on L4 and L5 to reduce air flow rate to 105m3/sec.(To be determined by Fire Engineer)天空酒吧在屋面层设置排烟风机,风量约为 30m3/sec. (待防程师提供)Mechanical extract from upper level of rooftop bar
51、to protect mezzanine floors. Smoke extract fans are placed at roof1. Volumes to be designed as 30m3/sec extract. (To be determined by Fire Engineer)消防楼梯井大堂和电梯遵照 AS1668.1 section 10 加压。Fire fighting shaft lobby and lifts to be pre加压设备设置位置见下表:rized in accordance wiS1668Location ons is as followed:根据 R
52、itz 要求,在以下部位设置防烟系统,排烟量按 12 次/h 计算:According to The RitzCarlton Hos, HoDesign Standards, mechanical smoke extract system are providedhe following pla, and the air flow rate is calculated based on 12ACH:酒店的公共区逃生通道(L7L10)在L11 设置了排烟风机.通过空调箱新风补风;排烟风量约为 8.3m3/s。Hopublic corridors in front of the house on
53、L7L10 are protected by mechanical smoke extract system.The smoke extract fan is located in L11. The air flow rate is 8.3m3/s Make up air is provided by AHUs.酒店大堂在 L9 及 L11 均设置了排烟风机.由空调箱补风.;排烟风量约为:16.6m3/s。Holobby on L9 is provided with mechanical smoke extraction system. Besides the fan on L11, ther
54、e isanother smoke extract fan on L9 mezzanine. The total air flow rate is 16.6m3/s. Make up air is provided by AHUs.客房走道中间设置排烟口,走道的两端设置消防补风口;排烟风机分别设在 L30 及 L46.排烟风量约为:1.56m3/s;补风由客房及客房走道新风系统提供.For hoguestroom corridor, one smoke extract grille is placed in the middle of the corridor, while twosupply
55、 grilles locate at ends of the corridor on each floor. Smoke extract fans are on L30 and L46. The total airflow rate is 1.56m3/s. Make up air is provided by g System).L47 酒店的餐厅阅览走道设置了排烟风机, 通过空调箱新风补风;风量约为:5 m3/sSmoke extract fan for corridor of restaurant and library is placed at roof1. The air flow
56、rate is 5 m3/s. Make up air is provided by AHUs.orridor and guestroom DOAS (Dedicated Outside Air6建筑设备自动化管理系统/Building Equipment Automation ManagementSystem1) 本工程在商业和酒店分别设置建筑设备自动化管理系统,系统采用集散型控制系统(集中管理、分散控制),它是用网络结构将分布在各现场的控制器(DDC)连接起来,通过对供配电系统、照明系统、空调系统、给排水系统等机电设备的监视或控制,以达到管理和分散控制的目的,确保建筑物内舒适和安全的工作环
57、境,同时实现高效节能的要求,系统具有扩展和升级的功能。The project set up building equipment automation management system in commerce and ho . The system will adopt the distributed control system (centralized management and decentralized control), which uses network structure to link the controllers (DDC) which are decentraliz
58、ed in each monitoring site. Through2) 防烟系统/Smoke Control Systemsmonitoring or controlling theer supply and distribution system, lighting system, air conditioning system,根据消防工程及建筑平面图,在以下部位设置防烟系统:water supply and drainage system and other electromechanically equipments, the system achieves theresult o
59、f the unified management and decentralized control, to ensure the comfortable and safe workingSmoke control system requirements identified in current Fire Engineering Report and architectural layoutsinclude:零售中庭在 L6 设置排烟风机,通过外门及空调箱进行补风。在中庭 L4L5 设置挡垂壁烟,以降低排烟量,environment and meanwhile realize the pur
60、the function of extending and upgrade.e of high efficiency and energy saving. The system also has排烟风量约为 105m3/sec.(待防程师提供)730Aug15序号No.加压位置Space风机位置Location on加压风量(m3/s) Air flow rate1楼梯 S01 Stair S01B1L8L11L30L46B5L2:10.56 L249:28.97 L3L8:112楼梯 S02 Stair S02B5 L11L30L46B5L2:9.24 L2L49:27.653楼梯 S03
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 江苏省盐城市大丰区四校联考2025-2026学年七年级上学期12月月考历史试卷(含答案)
- 辅警执勤培训课件
- 房地产销售礼仪培训课件
- 2026年深圳中考数学阶段提升检测试卷(附答案可下载)
- 2026年深圳中考历史启蒙运动专项训练试卷(附答案可下载)
- 2026年深圳中考地理行星地球专项试卷(附答案可下载)
- 2026-2032年中国三维激光检测设备行业市场全景分析及发展前景研判报告
- 2026年公共关系与传播学试题
- 2026年信息安全技术与应用操作试题集
- 完善职业发展体系
- 初中寒假前心理健康教育主题班会课件
- 事业编退休报告申请书
- 原发性骨髓纤维化2026
- 2023-2024学年北京市海淀区清华附中八年级(上)期末数学试卷(含解析)
- 临终决策中的医患共同决策模式
- 2025年贵州省辅警考试真题附答案解析
- 半导体厂务项目工程管理 课件 项目6 净化室系统的设计与维护
- 河南省洛阳强基联盟2025-2026学年高二上学期1月月考英语试题含答案
- 防护网施工专项方案
- 2026年中考数学模拟试卷试题汇编-尺规作图
- 2026年及未来5年市场数据中国聚甲醛市场运行态势及行业发展前景预测报告
评论
0/150
提交评论