上海xxx技术产业研发中心工程监理实施细则(地下室土建工程)总监理工程师:上海xx建设监理有限公司xxx技术产业研发中心项目监理部2010年7月目录一、编制依据················································································································3二、基本要求1.
监理范围····················································································································32.
开工前的准备工作
···································································································3三、施工过程监理·······································································································4四、静压桩施工质量监理1.
施工质量要求
···········································································································62.
静压桩施工质量控制2.1
施工准备的质量控制······························································································92.2
施工过程的质量控制······························································································9五、
土方工程质量监理·······························································································10六、地下室防水工程质量监理···················································································12七、后浇带施工质量监理···························································································16八、模板工程施工质量监理·······················································································19九、钢筋工程质量监理·······························································································20一、工程概况1.项目名称:上海xxx技术产业研发中心2.子项目名称:包括地下室、产业中心、研发中心、图文中心、行政中心、会议中心、服务中心、门卫8个子项目3.参建单位:建设单位:上海xxx工程科技有限公司设计单位:xx大学建筑设计研究院(集团)有限公司;监理单位:上海xx建设监理有限公司施工单位:xx建设集团有限责任公司4.工程地址:上海市闵行区紫竹科学园区xx路南、xx河东、xx路北,xx地块铁5环.帐建筑面积:总贺建筑面积馅109832那m惜2杀,其中地下室继建筑面积介32112m律2皂6.碰建筑层数翼:忽地下一层、地招上暑4闷及南5鹿层拴,建筑最高度牧24柔m词7没.云抗震设防烈度唯:纽7旱度棋8病.随人防区域鼠:粱①该~骨⑧示/eq\o\ac(忽○特,乘A桑)保~eq\o\ac(陈○或,棕G速)规轴内设置平战症结合的甲类、致核六级人防地固下室,建筑面寺积某2000m霸2截,地下室顶板渣室外部分覆土叉厚度绑450mm益9联.补地下室防水:梢抗渗等级何为挺P爷6气、二级,其中摇变电所区域为型一级纪10铸.勺结构性质:设乒计使用年职限印5透0瓣年,安全等级物二级煤11宝.冬施工后浇带:脊设置数道后浇渠带,从基础底稼板至屋面且对首应位置税二、助编制依扎据敲晓1.厉本工程已审批李《监理规划》蜻2.或《设计图纸》粉3.迷《建设工程监吐理规范团》晒GB5031断9-2000伴4.遗《建筑工程施懂工质量验收统葬一标准透》吴GB5030匹0船-亿2001神5逮.赛《混凝土结构孝工程施工质量梦验收规范艇》尼GB5020孩4田—解2002饭6.关《块体基础大扬体积混凝土施射工技术规程》屡YBJ22梳4射—艺91蒜7.钳《泵送混凝土王施工技术规程醋》锦JG理J害/概T1绒0撤-名95气8.析《混凝土结构岛设计规范彻》寺GB5001喂0-2003狗9悦.施《建筑地基基芬础工程施工质疯量验收规范辅》萄GB5020熊4-2002鬼10线.纠《地下防水工沿程施工质量验嗓收规范玩》元GB50泉208-20晓02输11芦.暖《人防工程施屈工及验收规范区》悬GB50摄134-20最04描12锁.咐《砌体工程施转工质量验收规绪范孤》瞎由GB5积0203-2陷002亦13办.盼《多孔砖砌体溪结构技术规范孤》撞弹J哪GJ137-经2001狸14届.是《工程监理服俱务控制程序委》粘防劣SHPM疾/蓝QB是15.街《委托监理合疮同》及《施工凡合同》毒16换.撇本工程已审批娇《施工组织设递计》暴17.预国家和地方有兽关技术规范标各准总监已审批的工程总进度计划猜三、厉监理工作流程总监已审批的工程总进度计划嫂3.液1撞进度控制的监掀理工作流程承包单位编制的月进度计划承包单位编制的月进度计划专业监理工程师审查专业监理工程师审查人、机、料投入均衡性审查相关单位配合、工艺可行性审查人、机、料投入均衡性审查相关单位配合、工艺可行性审查符合?符合?重新编制不符合重新编制承包单位按计划组织实施承包单位按计划组织实施专业监理工程师对实施检查、分析专业监理工程师对实施检查、分析基本实现计划目标偏向计划目标基本实现计划目标偏向计划目标专业监理工程师签发“监理通知”指令承包单位采取调整措施并编制调整计划承包单位编制下一期专业监理工程师签发“监理通知”指令承包单位采取调整措施并编制调整计划承包单位编制下一期进度计划梅3岭.2勇销质量控制监理降工作流程厕3怕.2.1洁工程材料构配杠件和设备质量侍控制流程价承包单位填写喷材料猪/稳设沈备锈/桃构配件报审表监1.审验证明资料监1.审验证明资料理工2.现场见证取样程师3.进行验证复试审核写承包单位另不丸合格笑选(不合格材料退场)合格奖监理工程师签饰证准予使用冈(承包单位投垃入使用)闭3玻.2.2鼠分包单位审查本承包单位选择授分包单位弦承包单位填写户《分包单位资削质报审表》不同意舰监理工程师审歇查同意蛮总监理工程师嚼签署意见扩承包单位与分竹包单位签合同胡并报监理话分包单位进场饥施工塌3杜.2.3贷工序监理工作扎流程
工序施工荣承包单位自检垂,初验合格却填报工序质量惯报验单盏专业监理工程亩师审核会同现场检查
资料审查合格?合格进行下道工序
不合格
旗整改后重新报扔验整改整改
帝3骂.2.4摧分项、分部(标单位工程)监效理工作流程估开工报告已审虹批说承包单位施工守准备已落实测量放线整改沟承包单位填写骡《报验申报表树》瘦专业监理工程件师审核不合格合格?合格膜进入工序监理读工作程序事分项末工序结慎束境承包单位自检选、初验、资料小齐全牧填写《报验申职报表》斥监理工程师审叉核谨分项工程是否晴完成柱细质量检验擦疯资料是否齐全问有效不符合符合?符合拜进入下一分部赢施工企单位工程全部求分部施工结束
瘦承包单位自检欧、初验合格、叹资料整誓理齐全有效,碎填写《工程竣验工报验单》监理审核姥实物工作量珠睡资料是否齐全贯是否完成菠撕有效不符合符合?符合脾总监理工程师裂组织预验收漆协助建设单位抵组织验收飘3天.3壶造价控制监理给工作流程肥专业监理工程触师施工质量、生工镇程量已签署认丧可付承包单位编制隆工作量清单并迎填报支付申请升专业监理工程被师审核工程资料工程资料审查剧实物量清单、尿计算书审查合格?合格
不合格
段整改后重新编爽报怠报总监审查并裕填报工程款支付证书航建设单位审查其、根据合同处沿理
残3赌.4集安全控制监理于工作流程码承包单位勤按夸JGJ缺/尽/59-99兄看表吗闷内容鸦报安全管理资波料整改不合格监理部审核合格羞承包单位饼按滤JGJ/5椅9-99先原表偷顾、嘱3.0.导5叮、醉、材炼2越、懒证竟及已审批平面开布置组织实施灿承包单位自检而、自评,夫填来写安全检查申陕请表整屿改旦暗监理部、建设骗单位审核不符合符合?符合签署意见报安管站核查遥四梯、剩监理工作控制暴要点庸(一)星截桩与动测金1.务地下室截桩。争应采用人工酸、射风钻相结合进犁行截桩以保证行桩身不受损坏柜而影响桩的质锡量。拍2.傍桩动测。为配敢合检测桩身质奥量,事先复制仗好工程桩施工善编号图,分次丈序进行检测。贸(二)粥混垫层施工偶1.插该工程基坑垫喊层处于淤泥质屿土层,开挖后指虽然采用排水栏措施,但可能出会产生弹簧土抬现象,因按土和方开挖方向达爱到设计标高后滨,按施工图要软求将马上进行战施工,以利缩须短排水和防止飘垫层上浮福。中絮2.止砼垫层浇筑要牺向排水方向筋设鸭1益%怜坡度,以提高宝垫层面层排水纤效果。拌(李三氧)呆钢筋分项工程哈A茅.抽原材料的检验帜:工程中所用鞠的各种型号、补规格、预埋件宗等钢材,施工欠单位应按分批岔组织材料进场室。每批钢材进拜场必须持有出笔厂质量合格证买书、出厂检验牢报告井、备案许可证犬/浙交易凭证(进悼沪)有和进场复验报筝告(凡进场钢寿材必须按批量裙抽样送检、见帝证。通过检验堪,达到设计要节求,监理人员锤认可,方可使遣用到工程中去倾)。焊条焊剂役的牌号性能以绩及接头中使用艰的钢板和型钢格均必须符合设骂计要求和有关桃标准的规定;闻对不符合设计刘与规范要求的送材料一律不准命进场。拿B豆.割施工过程中工年序及质量控制衬要点观1唤.沉基础钢筋的绑删扎,应严格按挎设计要求和施重工规范要求施厉工。钢筋的搭筒接长度、焊接探质量、锚固长粮度、钢筋间距痕、弯钩角度必崭须满足规范和内设计要求;头2闲.桌予埋件的埋设闷位置必须满足再规范和设计要称求,预留洞口遵必须严格按要耍求设置加强钢冷筋;预埋件施太工前须先除锈协,外露部分需屡涂红丹底漆二撒道,防锈面漆屈两道。稠3驶.糟及时抽取钢筋耍机械连接接头怪或焊接接头作且力学试验,提缝交试验报告;彼4蒙.普钢筋绑扎完毕础后,施工单位店应首先进行三匆级自检,自检族合格后,报监线理工程师进行负隐蔽工程验收长,验收合格后蛇再报质监站验臂收,通过后方味可浇筑混凝土勺。证5叫.透钢筋绑扎控制辆要点帐①杜钢筋绑扎前必拉须清除其表面框的油漆,同时厘应做好各墙板母预插钢筋的定赖位,浇捣混凝湾土后必须严格破防止扭动,以鹅保证钢筋原有县强度及钢筋与蒸混凝土之间的端紧密咬合不受政影响,防止渗辅水。狐②边基础单向主筋热钢筋网,四周排两行交叉点应漠做到每点扎牢焰,中间部分每碎隔一根相互成防梅花式扎牢。暂现浇柱与插筋楚下端应看用串90累°落弯钩与基础钢之筋进行绑菠扎能,缓插的位置必须刻固定牢摇靠落,译其箍筋比柱的科箍筋缩小一个珍柱箍直狡径缸,却以便连接;僻③歉柱纵向钢筋的投弯钩应朝向柱中心、截面小的烂柱,用插入式踪振动器材时,戚弯钩与模板所存成的角不能小云于蹈15骑°厚。箍筋接头应务交错布置在四训角纵向钢筋上久,并扎牢。躬④轧门框墙施工前滤须将钢门框及脂穿墙管道预埋肾到位,并在门办前顶板内设置姨吊钩锚筋;渔⑤砌临空墙、门窗粮墙钢筋必须一砍次成型,并注郊意防护区内外净的竖向钢筋位姜置不得放反;轨⑥绞基础底板筋均挺采用机械连接咏或焊接,相邻敲钢筋不允许在蹄同一截面接头违,相邻钢筋接治头距漆离服≥遣35允D割,底板中上下栽两层钢筋之间型的固定马凳筋夹应由施工确定淹;榆⑦岗顶板钢筋的负庄筋锚固长度从腊板顶下留弯灌≥题L骗A传,顶板钢筋的熔正筋锚固长度早伸过梁或墙中留心线薄且酿≥温5婶D餐;逐⑧刷钢筋接头位置滥:顶板的顶部巡钢筋、外墙外躺侧的竖向或水呼平钢筋在跨中忙或层高中垫部跃1/煌3框范围内,外墙羽竖向钢筋应满攻足相邻钢筋接矩头距愈离甩≥碎35命D苏;顶板的底部乒钢筋,地下室修外墙板内侧的馆钢筋在支座;瞧梁底部钢筋在枣支座处,顶部顽钢筋在跨廉中茄1/剂3鹊范围内;阅⑨汪受拉钢筋的最柱小锚固长度及住最小搭接长度忆可参照国际图丑集检查;迹C暖.熊质量检查要点悄:粮1期.筋根据设计图纸乏检查钢筋的钢旧号、直径、根承数、间距是否裙正确,特别要埋检查钢筋的位须置;鲜2稀.倘检查钢筋接头张的位置以及搭盐接长度是否符掩合规定;乖3睡.饭检查钢筋绑扎壶是否牢固,有杏无松脱变形;鸡4佛.哪检查混凝土保插护层厚度是否熟符合设计要求新(以上要求可么参壶照吓GB5020沸4-200根2泥规范及设计要浮求)。镰(售四献)卵模板叠分项茎工程芦1.值车审查施工组织泉设计中的模板回施工方案,根放据主体工程结厦构体系、荷载钱大小,审查施取工单位选择的愿模板和支撑系胞统是否安全合揪理,具体为脉:基1.叛1赔能否保证工程呀结构各部分形隆状尺寸和相互眼位置的正确性完;涛季1.2患踢是否有足够的酷承载力、刚度牌和稳定性,能逗否可靠地承受庸新浇筑混凝土都的自重和侧压障力,以及施工悟过程中所产生晓的荷载贝。抱袖1.3休棚是否满足装拆误方便,便于钢魄筋的绑扎、安五装和混凝土浇计筑、养护的要颜求色。久陆1.4缓晴模板的接缝能锯否保证严密不伟漏浆素。途鞠2.月她对照经审核的澡模板工程施工占方案,对模板井施工进行质量完监控和验收差。倾件2.1寒浊现场观京察和丈量模板半、支架及支承税部分的面积,类必须满足施工煤组织方案的要练求贪;抹2.2至他按规定比例抽算查梁、柱、基房础、墙、板的袖模板接缝,接宅缝宽度不应大聪于潮2.5mm热;着2.3白役按规定比例抽傅查模板与混凝膨土的接触面是饿否清理干净,懒是否采取了防迟止粘结的措施爷。顶搭2.4现锄检查模板的安改装尺寸和预埋转件、预留孔洞敲的偏差值,应膨符合下表的规启定隶;纹2.5宁冒监督施工单位云必须在满足设光计规定的拆模老时间及混凝土问达到设计规定站拆模的强度后迹,才能拆除模别板和支架。违(居五饼)砼分项工程蛙1.愈审核《建筑材议料报审表》,跟检查施工单位贡报送的砂、石掏、水泥等原材奶料的出厂合格鼻证、质保书,绣检查其是否按六规定现场见证吉取样送检,检豪查试验报告各妹项技术数据是判否符合标准规桐定,试验项目剃是否齐伞全期;删检查混凝土施腿工配合比,核斧对其各种原材蠢料是否与现场袖使用的相符。怀2.胳检查工序交接厦记录,模板、采钢筋经检查合斯格隐蔽签证后吵,方可浇筑混淹凝土。宏3.墓检查模板内是泡否清扫干净,率木模是否浇水拉湿润,模板内坟是否无积水。谈4.胡检查商品混凝置土供应商提供限的混凝土配合蛇比和开盘记录污是否与工程实唐际需要相符。翻5.说检查混凝土坍顷落度是否符合们要求,每一工士作班不少吧于走2李次。妇6.葬检查是否有专饥门的护模、护神筋人员,随时灵处理出现的问爱题。沃7.肿检查并监督施迅工人员,在浇银筑竖向结构混访凝土前一定要立先在底部填示以证5滚0贪—饰100mm俭厚与混凝土内旁砂浆成份相同疲的水泥砂浆。投8.润检查混凝土运魔输、浇筑及间暂歇的全部时间衡,是否不超过僚下表规定:观混凝土等级袍气熔梁温榜≤区25感℃往〉稳25蜜℃圈≤船C30司21沟0伸分钟致18解0赞分钟仓〉絮C30初18峰0尤分钟室15浙0低分钟工注:蜘掺外加剂混凝辜土汉,呜按试验确定奴。支9.殊检查混凝土浇诊筑厚度是否不电大于插入式振挎捣器作用部分牢长度搂的嚷1.2炸5班倍。巧10.伯检查混凝土浇箭筑是否连续进慈行,当必须间怀歇时,是否在引前层混凝土凝奴结之前将次层爷混凝土浇筑完佩毕且振捣器插娃入前层混凝土竿的深度不少于少50mm远;客如果间歇超过干混凝土的凝结白时间,应要求叮施工单位采取驱措施留置施工农缝。评11.加检查插入式振浅捣器的插入点干间距是否不大轧于振捣器作用削半径嚼的街1.慧5饥倍,且应避免脸碰撞钢筋、模粉板司等衰;怠振捣器应快插挤慢拔振捣至混诵凝土表面呈浮脉浆且不再沉落涛为止。待12.敢检查施工单位堤是否按规范要受求留置混凝土沙试块。瓶13.迹检查混凝土浇缩筑完杆毕释1思2庙小时内是否进咳行覆盖并浇水寨养护,养护时定间不得少庙于强7立天。密14.锯拆模后应按有推关规范的规定默对整体构件混祥凝土进行全面棵检查,出现蜂签窝、露筋、孔认洞等缺陷时,午施工单位应将盛处理方案报监征理工程师确认庸后方可进行修眉补处辣理哈;漠对影响混凝土腿结构性能的缺相陷,须会同设姜计等单位研究想处理。晚15.梢检查并记录现来浇混凝土构件银的偏差,核对奇其是否在规范爪允许范围内。越16嚷.牵大体积砼施工野监理工作县:愉对于地下室底配板砼体量较大客时,畅按大体积砼施垒工方案考虑逆。沙①贱店基本要求:筑(积1眠)矮.往混凝土所用的梯水泥、水、骨轻料、外加剂等牧必须符合施工震规范各有关的禽规定。歼(论2阵)抓.等混凝土的配合度比、原材料计晌量、搅拌、养款护和施工缝处予理必须符合施垦工规范的规定絮。羡(迅3刺)辅.虽砼试块的取样危、制作、养护积和试验必须符族合规范要求,另其强度必须达芳到规范标准。岂(涂4瓜)瓶.腔对设计不允许表有裂缝的结构冠,严禁出现裂吨缝,设计允许膨出现裂缝的结仔构其裂缝宽度敲不大于桌2阶mm荷。脑(碗5轿)乏.良砼应振捣密实阴,蜂窝面积、倍孔洞面积、漏葬筋长度及施工五缝处夹渣层长弹度必须符合暑规范殃规定抢,②风险分析:问A.滥基础底板大体差积砼施工具有搬以下特点:轿(乖1锤)娱.蚕砼一次性浇捣觉方量较大,浇脉捣时间长,砼渴自流淌距离长耍,振捣面较广叔,不允许预留希施工缝,砼分擦层浇捣,因此衬施工组织难度兵较高。斧(戒2视)现.慧由于基础底板控一般钢筋较为晚密集,板厚大京而板面标高变根化较多,因此终砼浇捣难度较夸大。站(房3乡)狗.轰大体积砼内温报度应力及收缩枪应力较高,防既止裂缝开展责群任较大。愁B.谊大体积砼浇捣难易产生的质量股问题包括:荣(算1拢)播.抚由于砼自流淌骨距离长,振捣困数量不足钢筋稿较为密集等原亏因,导致局部雾砼疏松。榜(挣2毁)联.霸由于砼供应渠熊道不畅,初凝歼时间控制不当批及施工组织不焦力等原因导致咸施工缝;尤其反垂直向施工缝贯直接影响板整柿体刚度。琴(树3弄)象.面由于浇捣程度浮不当及养护不多及时导致板面访裂缝;基础出判现贯穿裂缝等贷。进其它质量问题粪还包括板面平桶整度偏差较大脚,墙、柱、电悬梯井钢筋移位类,蜂窝麻面、匙露筋等等。嗓C.乐大体积砼施工糖质量末控制你关键:砍(叫1届)灌.意编制严密的大桑体积砼施工方垫案;重点审查单大体积砼在砼红供应方案,砼欢浇捣方案,砼敲养护方案方面际完备性及其落悲实情况。精(枣2剧)霸.吨结合工程施工收特点及工程周塌围环境制定相穷应对策,确保内砼连接供应及穷有序地组织浇膝捣。输(棍3维)拦.伶明确监理重点茧,包括板由浇里捣难度较高部腾分(如梁板基种础部分、深坑倘四周,外墙板循区域等)及砼殃浇捣关键工序舒(如砼质量控蚀制,砼振捣数辉量及振捣程序奴和砼养护措施穿落实等)分别钢制定相应对策奴。劈(危4浓)麻.你落实全过程旁候站监理,明确汁专班监理人员眯分及职责。缘③椅质量坏控制点:旷序充号可项找婚学目档要烘陪点埋1耽控制砼表面收泳缩裂缝撒a葬、配制砼时,杀要严格控制水某灰比及水泥用箭量荒b党、砼初逝凝判1-瑞2直小时前用木蟹牺打抹两遍,以美闭合微裂缝榴c抱、砼初凝后及己时覆盖,以防娘水份过量蒸发袖2愤控制温度裂缝艇a绸、降低砼水化虏热,包括采用盟低水化热的矿归渣水泥,调整轻配合比,掺加停粉煤灰及外掺枯剂,降低水泥吐用量羽b尾、掺加微膨胀做剂,尽如查UE牵A如以控制温度裂蜡缝可能力妨c板、降低砼入模版温度箭d网、及时落实养夏护措施控制内爷外温差不大于晋25°C钳3努控制砼板内施集工缝产生付a壁、严格控制砼盯初凝时间,配执合比要进行严近格试配工作,章确保初凝时间酷准确性,同时毫初凝时间要根到据实际浇捣作订业而及间隔时恰间确定炊b纠、合理安排浇奥捣作业流程,涝切忌出现浇沸捣暂“维死烈角塞”莫c飘、落实专业人答员检查砼面情凭况,及时调整鹿砼浇捣工序镜d秃、严格控制砼呼质量衔e诵、控制石子规皆格,掺入物捐等搭1/块5从及认盼成水剂,确保叙砼可泵性,减栽少外堵管可能碑性裹4投.孔防止出现砼疏较松次a舍、严格控制砼街质量,包括和甜易性,塌落度驻检查严禁现场判砼内加水自b捏、钢筋密集处怜及砼流淌坡脚拜(下排筋部位尖)要落实专人鬼振捣垒c网、砼必须按规盲程分层振捣密呈实,严禁漏振说d絮、根据砼泵送倚要求,板厚(贵涉及砼自流淌陷距离)及气候每条件等因素选忧择合理的砼塌品落度恢5愉砼板面平整度扎控制责a至、砼浇捣前用眨钢筋或木料做庙成与板厚相同龟的标志,放在羊浇捣地点顿b型、底板上下排兼钢筋支撑应保团证足够刚度,谁以防浇捣时变轿形办c映、砼面应采用旁平板式振动器缴,辅以铁板,罗木蟹等落实专正门小组进行抹接面肢d枪、砼强度应达站到呈1.2MP臂a青以后方可在已名浇捣的结构上差走动淹6根防砼板面蜂窝祥麻面漏筋等拣a枣、砼浇捣前检国查侧模处钢筋辛位置及保护层似厚度小b馆、模板应保证烦密封性,钢模编板脱模剂要涂组刷均匀不得漏翠刷,木模板浇丛捣砼前应用清鄙水湿润清理钳c捏、混凝土必须梅按操作规程分仍层振捣密实,誓严禁漏振耀17箱.动后浇带砼质量罪控制:舍①简后浇带混凝土直的质量监控蓄,第审查的内容及仙对策如下表:边序衰号纤检查项目虾质量要求或标石准泉针对性对策朗1辛强度和坍落度雹等指标港符合配合比设先计于检查核实主要摄指标,并随机疑抽样测定坍落黑度值绘2牲初凝时惭间奇(歼商品伟砼哗)仅未超过设计配虚合比中规定的愈时间归核实使用时的纱时间减发车时拾的时间,两者跪之差未超过初坛凝时间粥②役监督承包商留蝶置后浇带混凝庆土试件塔序播奸号落试块种类胸取样频率比取样方法采1他后浇带砼抗压赔试块察每础100m3荐相同配合比的继砼,取样不少摇于一组柄在浇筑现场随催机取线,挤样一个工作班猛相同配合比的喊砼,不足需100m3翁时,取样不少尼于一组芹2墓后浇带砼抗渗徒试块骄连续浇筑相同投配合比的砼量途500m3坐以下时,留匹置盾2淡组祥在浇筑现场随念机取样尚,周每班增亦加额250~50壳0
m回3牛砼量,再留简置影2观组勿18.牲地下室防水监砼血质量监理拘:拢(请1购)嘉.倡防水工程中使朽用的原材料、所外加剂等均须匠符合设计及施佣工要求,并具诚备质检合格证旺。同(迷2卸)滤.参督促施工单位残提前申报地下袄室混凝土浇筑呢方案并做好审男核,协助施工馒单位协调施工侦中各工种密切粗配合。薯(授3特)语.倡挽防水混凝土结程构中,混凝土却必须密实,抗种压强度和抗渗湖等级必须符合疾设计要求,期帽间施工缝、变贡形缝、止水片峡、穿墙管件、鄙支模铁件等设逐置和构造必须遍符合设计要求敞和施工规范卷。尝董(肤4).贷穿墙管道的防甲水施工应符合税下列规定:先4.1宰穿墙管止水环授与主管或翼环采与套管应连续臂满焊,并做好警防腐处理。穿做墙管止水环宽砖度感为片200
m尤m萝(用于人防工俭程恭部位建)。支4.2表穿墙管处防水信层施工前,应堆将套管内表面柳清理干净。虽4.3坏套管内的管道才安装完毕后,垄应两管间嵌入驳内衬填料,端律部用密封材料捉填缝。柔性穿烘墙时,穿墙内滋侧应用法兰压朗紧。自4)纹穿墙管外侧防巴水层应铺设严暗密,不留接茬墨,铺设附加层消时,应按设计恋要求施工。陶(房5).为埋设件的防水斑施工应符合下由列规定:钻5.1认埋设件端部或北预留(槽)底贼部的混凝土厚揉度不得小于翼250mm定时,必须局部来加厚或采取其挠它防水措施。既5.2智预留地坑、孔邪洞、沟槽内的掠防水层,应与出孔(槽)外的环结构防水层保拢持连续。忆5.3沾固定模板用的乏螺栓必须穿过咽混凝土结构时袄,螺栓或套管盼应满焊止水环册或翼环,采用穴工具式螺栓或初螺栓加堵头做删法,拆模后应捕采取加强防水慌措施将留下的役凹槽封堵密实随。恼(孕6).污浇筑防水混凝欣土前对结构钢谅筋和模板的检丑查刺:案貌检查防水混凝饺土结构内部设莲置的各种钢筋敲或绑扎铁丝,侄不得与模板接遗触,固定模板圾的螺栓必须穿闲过混凝土结构乖时,可采用在侨螺栓或套管上径加焊止水环或杠在螺栓上加堵钻头处理。明①歌防水混凝土浇供筑妖监理啊检查夜内容及对策方:馅(初1)肚审查防水混凝视土配合比设计博,审查的内容炉及对策如下:层序溪号蕉检查项目宗质量要求或标础准牢针对性对策且1犁原材料质量妥水泥在不受侵绳蚀介质作用时哲,宜使用普通喜硅酸盐水泥、夏火山灰质硅酸却盐水泥、粉煤瞧灰硅酸盐水泥胁,如采用矿渣腰硅酸盐水泥,柳则必须掺用外芦加剂以降低泌洲水率。并具备书出厂合格证、罩抽检合格;砂汽、碎石必须符万合防水混凝土嗽的要求,并检恼验合格,适合怎设计强度等级纽的砼拌制;外烛加剂具备出厂榆合格证。仆检查各种指标洗2绘混凝土设计强丙度践强度符合设计盒要求结。透检查配合比设摔计报告赞3诱坍落度戒非泵送混凝土迁不宜大于傍5cm招灵进场时随机抽堆样测定坍落度折值芦,侮如掺外加剂或店泵送混凝土应部为姨8~票18cm逃。泳4狠抗渗等级须抗渗等级应比阀设计要求提馋高购0.2Mpa德。朝检查配合比设铃计报较告霉灵②夜防水商品混凝芦土进场时的质任量监控,审查浩的内容及对策躬如下:话序凝号岩检查项目缸质量要求或标冶准遵针对性对策挪1堆强度和坍落度绘等指标农符合配合比设醉计白检查核实主要曾指标,并随机码抽样测定坍落游度值觉2歌初凝时符间笼(燕商品归砼明)扰未超过设计配屿合比中规定的虏时间仇核实使用时的荣时间减发车时雄的时间,两者说之差未超过初湾凝时间陷③漠防水混凝土浇替筑过程的质量饲监控体:聪(扯1).位与砼接触面表堂面洁净;缝隙勾、孔洞不会造帽成漏浆哈,残后浇带砼浇筑责前会同承包商锯的有关人员检担查,发现问题哀立即要求解决递。场劳(粘2).快自由倾落高度娇不超过填2仔米麦,狂如超过珍2哪米舞应采用串筒、有斜槽溜管等下饭料,严禁苏直接下料太。显者(筝3).原浇筑砼应连续骄进行,当必须摆间歇时,应保融证在前层砼凝袜结之前,将次村层砼浇筑完毕灶。如超过,则嘉应设置施工缝样。滩政(蝴4).疫检查混凝土厚饼度,不超过规其定,否则应分灰层藏。蹄曲插入式振捣器抛为莲作用部分高霜度奥1.2喉5汗倍膜;旗松表面振动银器为扔200mm物。屠(寒5).愧在浇筑完毕巨12辨小时内进行低,址砼施工方案中银应有专门的养珍护方案,旁站揉监理员督促承组包商执行。占砼五养护期不得少石于臭2泽8蓬天竖。繁晶④液防水混凝土宜粥少留施工缝。灵当留设施工缝筋时,督促承包乖商遵守以下规圣定胁:口贫a.将栏顶板、底板不谷宜留施工缝,拔墙体水平施工斩缝不宜留在剪投力与弯矩最大尝处和底板与侧松墙的交接处,绩应留在高出底拥板表面不小于混20糠0援毫米曲的墙体上。墙岸体有孔洞时,闲施工缝距孔洞箩边缘不宜小于故30佛0畏毫米晴。倚烫b.失聋垂直施工缝应蔬避开地下水和抱裂缝水较多的壳地段,并宜与坑变形缝相结合护。甲哄c.情骆在施工缝上浇休灌混凝土前,项应将施工缝处贷的混凝土表面东凿毛,清除浮摧粒和杂物,用猜水冲洗干净,淋保持湿润,再管铺上一熊层猛2丑0科-梅2企5音毫米贝厚夏的孙1禁:祸1播水泥砂浆。逐⑤式防水混凝土常逗见质量问题及遗对策欲5.1扭混凝土底板渗跪漏:挖土前开回始采取降水措怪施、基坑有采当取排水措施、剪混凝土浇筑时说基坑内无积水疑、垫层无渗漏障。易5.2家墙面施工缝及困以下部位渗漏较:混凝土坍落待度适宜、施工斧缝吊模处混凝火土振捣充分、杀施工缝处钢板腿止水带焊接严屠密固定牢固位纤置准确(遇水红膨胀橡胶腻子贯止水条固定牢听固准确)、外握墙防水卷材(寻涂料)施工至五少至底板距墙局面幻30点0柔宽处、防水卷述材(涂料)施路工质量良好点。泡5.3立墙面渗漏:混收凝土坍落度适循宜、振捣充分金;对拉螺栓切蚊割进墙面汉20mm寇深,凹坑用微签膨胀防水砂浆厘封堵;、外墙婚防水卷材(涂猪料)施工质量婶良好雅。丸5.4旧穿墙管处渗漏扯:预埋穿墙管岁加焊止水环;相套管内的管道面安装完毕后,坐应将两管间嵌有入内衬填料,拦端部用密封材石料填缝密实薪。替19圈.尸地下室防水工液程质量监理:A.预控:攻(坑1答).晒对施工单位的牌资质进行审查越和认定;对施找工单位的管理崭人员及技术操软作人员进行考说核,对施工方捷案及技术交底区文件进行审核脉,并在必要时踏进行样板试验班引路。知(纱2挽).搂对防水工程使杀用的主要材料法、辅助材料要思进行质量预控坛,要有出厂产侦品合格证或质息量鉴定文件及朝建材备案锯许可证骄(进沪)将,进入施工现恼场的防水材料消要进行复试和激外观检查。妈(绍3饰).三对基层的标高串、坡度、表面蜂平整度、表面缓清理、清扫、眯均应对照图纸堆及已施工部位曾的相对关系进赏行校验。航B.办控制要点念:死(供1).耻基层控制要点截:焦结构和找平层夸的刚度、平整直度、强度,表惑面完善无起砂锯、起皮、裂缝刚、基层的含水俘率等都是保证弄防水层施工质蜜量的基础。在(怨2)恰平整度控制要擦点锅:革用柏病2滴决米师靠尺检查平整观度。阔(栽3)样设计要求防水玩层(卷材、涂还层)与基层全恭粘结,基层表某面必须具备强杀度高、表面光将滑、不起砂、快不起皮、不开斯裂的条件。剖(碌4).立细部节点施工高条件的控制要高点遇:敌大面积防水层鼻施工前,应先耗对节点进行处俩理,做好密封技材料填嵌、墓附加层的铺设凶。但也有些节允点如:防水层梨收头、变形缝侍等要在大面煤防水层做完后鞋单独进行。肤防水层在建筑武的阴、阳角处浆基层应按设计杠做成圆角或倒释角;并在此增令铺附加防水层麦,其做法及宽经度严格按设计戴要求进行;防藏水层的收头、歌防舟水层及保护层与的固定要按设蓄计图纸施工或升遵守施工工艺魄进惩行。土20.际砌体工程:刑施工单位应按椅照《砌体工程讽施工及验收规响范》厅(披GB5020陶3-9荡8核)规定进行施偶工,水泥砂浆净和水泥混合砂解浆必须在拌成流后历3-捎4络小时内使用完访毕,隔日砂浆蛮不能使用。砌语块应提治前粪1-触2状天浇水湿润,萌含水率大约饺在悔10%-15矮%州之间。严禁干点砌块上墙,灰胶缝饱满度一般漆为殖1凉0趋毫米匙并不小于纺8尸毫米醉,砂浆灰缝饱蝶满度不低悟于里85犁%询,竖缝应饱满此,当需要留槎剖时,其部位和贝形式要合理,向接槎处必须清桂理干净,并浇国水湿润。类21攀地面与楼面工耐程:帝施工单位应按盆规范盛规定进行施工创自检后,监理派按规定陶检查、甚验收。兽(胡1)婶对垫层和找平再层,其材质、加强度(配合比湖)、密实度以签及厚度、标高炼、坡度等必须赖符合设计要求醉和施工规范。匠(园2)虎对混凝土面层垫,其中砂或粗仆砂的含泥量不着大盒于慈3址%窗,石子粒径不捕大心于搬1挤5佳毫米以及面层吃厚度其的闸2/不5音,水泥标号不欣低飞于话32.5贩#搂。严格控制水复泥砂浆的水灰顺比。水泥地面互磨光后,要求狼施工单位怒在急1己2介小时后洒水养扮护,连续养护狐不应少悼于奴7娱天。庭五、翁施工质量控制杆对策屠(和一药)缸钢筋混凝土工跳程影响质量的早因素及控制对悔策:密(用1)怕.疤模板工程:桑影扮秀哄响每置苗质寻精碌量亲邀榆因撑半姥素侵控示廉般制暗吃避对康染俯策爹制找模润斜支撑过陡无节力资注意检查坡度让不大害于该60%遥截面内部尺寸付不符合设计要盲求携复核截面内部骂尺寸陶底模上表面标捏高不对简根据施工单位隶放的标高复线愤梁、柱的轴线疲位置偏差拾督促施工单位柱及时纠偏豪钢模板表面局印部不平么要求施工单位址及时调换或修洋复削钢模板板面挠订曲六对超出允许偏蚁差的要求施工堵单位调换或修意复映两块钢模之间蛙的拼缝大恼注意检查模板碍内部尺寸,要流求施工单位精韵心施工蓝拼装模板面不湿平:预埋件、回预埋及预留洞抛遗漏或尺寸、誓位置不对蹈注意检查,要糠求施工单位精脚心施工,根据驳设计图纸要求仿检查验收,认域真复核数量、邪尺寸,并根据确施工单位放的机轴线复核位置贼模板表面漏刷认隔离剂洽要求施工单位弃满刷隔离剂,洒且不能污染钢引筋挠拆油模唉过早座顺序不当乘混凝土强度达偷到规范规定,淡方准拆模掉要求控制操作溉规程施工绣未适当留些顶径撑妻要求按施工组怠织设计和技术飞交底执行奋(刺2).妹钢筋绑扎工程励:访影躁秒菜响兆伤痰质范灭惜量赌励秤因纯值脱素饺控债很制外茂对版帜房策四材邪料庭制醋作迟钢筋锈蚀严重查断面减少部要求施工单位兆除锈,除锈后牢按实际断面使贴用但原材料曲折词要求施工单位挎调直证成型后,弯曲挖处有裂缝蚂不准使用厨无材质合格证圈检验合格证,轧如无合格证,图不准进场畏成型尺寸变形德要求施工单位卸加强钢筋配料富管理,大批加式工形状比较复犬杂的钢筋,应壶先放大样武成型钢筋变形志要求在搬运,吵堆放时应轻抬芽轻放,放置地粉点应平整干箍筋不规范处要求施工单位姜注意操作,使量成型尺寸准确景圆形螺旋筋直灶径不准三应根据钢筋原督材料实际性能泪和构件要求螺比距大小预先确倒定卷筒的直径极钢筋遗漏或截月面不对塑根据设计图纸勇,检查验收薯保护层过小扁设保护层垫块韵,要求用高标古号水泥制作参同截面接头过痒多狮检查同截面的毛接头应符合规群范要求出箍筋间距不匀肌应要求施工单枪位预先算好箍慰筋实际分布间辽距,绑扎时在育钢筋上划印熊接头松扣,箍益筋接头同向蝇要求在搭接处盾用钢丝扎紧,项绑扎时将箍筋水接头位置错开享绑扎迅柱子外伸钢筋尽错位阻应要求在外伸斤部位的钢筋加情箍筋扎实并按臂图位置固定闲主筋碰焊质量舅不符合要求,糖搭接长度不足壶,焊缝不饱满钱,不连续旷应注意检查碰警焊部位有否裂烈缝,是否焊透趣(征3).摩混凝土工程浮影引志豆响梅烛掠质简繁之量屠句最因将掉寇素怒控袭照制公饲对幼阵策霜混肺凝晌土瘦商品砼时间过终长粮要求施工单位僚严格控制商品奔砼从搅拌站到依现场开始浇捣粪的时间,对时饺间过长的砼严压禁使用罪商品砼的坍落伯度过大或过小缠检测砼的坍落梁度,对坍落度卖过大或过小的吴砼不准使用冬现场搅拌砼水附泥、砂、石料驳没有出厂合格形证勒核验水泥、砂拦、石料的材质疫保证书,对无受质保书或不合去格的原材料严软禁使用如现场搅拌砼配向合比控制不严亚要求严格控制勾配合比,水泥委、砂石料要求趟盘盘过磅洪振泡捣俩一次下料过厚齿要求一次下料角厚度不超过振塘动棒长度佳的搞1.2叮5拘倍跌未设溜槽、溜择桶,自由倾落纲高度过高祥自由倾落高度毕超过料2联米暴,应要求设溜联槽吹间隔时间长,昏没有留缝浊注意检查间隔见时间不能超过鼠水泥初凝时间怜施工缝留设的欠位置不合要求读应要求施工单馋位按规范和设锈计要求留设冰漏振贺注意检查棒棒盲相接不漏振谢未分层振捣湾要求控制下料轮厚度,一定要有分层振捣弦施工缝处未清隙干净寨应要求清理干肾净,用水冲洗蛮湿润蛮振捣时碰移钢革筋衔注意钢筋不准斗移位,要求钢颈筋工配合,随魔时修整费养鹿护昏不及时瓶浇灌蛾完请1睁2锁小时应检查是姨否养护供时间不够卵一般砼需养护膝七昼夜月冬季无防冻措调施乐应要求制订冬许天砼防冻措施神,并检查执行谎夏季无覆盖措霉施扇夏季应要求用贴草袋覆盖纳(盗二刺)弱砌体工程挥影响砌筑质量辫的因素的控制岭对策迎影仙私萍响瓣搅毛质办喘巷量武武护因膀扛妹素厘控眯秃制次填对殊息策矮材岁料陈砖进场后未经伏检验估核验出厂合格变证从砂浆砂子颗粒猛过细载要求调整砂浆与配合比巩和易性不好(尺砂浆)笑要求掺微沫剂英砂浆配合比控威制不准卡要求承建单位找派专人负责,昏标准养护,定牲期试压许砂浆试块制作茄、养护,试压格不符合要求枯督促承建单位敞派专人负责,赞标准养护,定疗期试压歌施工操作哑大铲使用不当左要求执凶行悟“斜一铲灰,一块泡砖,一揉努擦粱”咐砌筑方法久干砌上墙或浇伟水不足苦注意检查砌上客墙前的浇水工户作是否落实鹰墙身位移百高降提答水平灰缝高低昨不平厚注意检查每层闪砖与皮数杆是宏否对平糊砌砖留直搓刑按规范要求验衣收过皮数杆不平贸闯睡菜演靠尺板少私要求砌筑工人刺每人一个控线坠板少伴要求砌筑工人汇每人一个闹脚手架高度不烛适宜传注意检查每步爬架不超过杯1.伸2怪米嘱高米(三)添地面脉工程廉(同水泥砂浆面层稠的整体楼地各面亡)披影响施工质量故的因素及控制婚对策总影唉芳或响项兵闭质半燃悦量事鼓屈因卧乱洗素右控羽丝制侮嘴对妈昆策劲材料仰水泥、黄砂、读石子趋进场后核验材屯料质保书、出育厂合格证,对度有疑问的复验痒合格后才能使蹈用只施工操作稍面层起砂裙严格控制水泥女比,水泥砂浆谷稠度和砼坍落暂度,并注意检酬查养护时间,兼避免过早上人鼓地面空鼓景要求承建单位建认真清理底层锹,对基层要浇扇水湿润,注意始结合层的施工灭质量,先涂刷还素水泥浆再抹墨面层巴面层不规则裂线缝毛锡帖巴问接搓不平,表苗面不平果要求菌3绩米瓦直尺刮平劣刑(姐四氏)改贱装饰工程鞭(一般抹灰)锯影响质量的因犹素和控制对策德影件拳协响羊失着质粗框剃量味怎回因晨厚箩素生控熔素制来霸对置魔策事材嘴料红水泥无出厂合浅格证现检查水泥出厂援合格证排水泥过期结块披要求过筛后抽胞样复验,重新弹确定标号段水灰熟化时间膜不够,有生石钥灰颗粒束严格控制熟化杠时间,常温下跳不少薄于菊1心5割天,用于罩面京时不应少纲于演3舞0洋天乖砂含泥量高,嗓含杂质多臂含泥量应控制雄在茧3-5绪%竹,并应过筛,米不得含有杂物佩施帖工庆操另作婚顶棚抹灰,空则鼓脱落避要求认真清扫引,素浆打底,返不得超厚荷墙面干燥旅抹灰前要求洒摊水湿润袜接搓不平,表袋面不平蜜经常检查,提布醒操作人员精姐心施工萌不清扫落地灰脸要求随时清扫疏,文明施工季抹灰层的平均府总厚度不符合罪要求增应严格控制抹新灰层的平均厚额度,不得超过负规范和设计的外标准蚊冬季施工,无修保温措施演要求采取保温聋措施,施工时路,环境温度不惜低于零度旨室内抹灰无措扛施,风干裂缝伍要求采取相应填措施,减少风梁干裂缝席靠尺板不标准霸经常检查靠尺捐板是否标准忽操作人员无阴患阳角尺习要求人手一把胀六包、辅监理工作的方纺法、措施及手贴段暴本监理部将以俩事前控制(预营防)、事中控件制(过程)及眠事后控制(验酿证、分析)的奋
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年下半年中共山东省委党校(山东行政学院)博士后招收5人模拟试卷含答案详解(综合卷)
- 2026山东青岛中国海洋大学食品科学与工程学院招聘工程技术人员1人模拟试卷及参考答案详解(黄金题型)
- 2026南开大学部分科研助理岗位招聘模拟试卷附参考答案详解【B卷】
- 2026年宁波市江北区公立学校招聘编外教师28人备考题库含答案详解【达标题】
- 2026广东深圳市崛起实验中学招聘笔试题库附参考答案详解(黄金题型)
- 2026江苏镇江市高等专科学校招聘高层次紧缺人才1人模拟试卷含答案详解【培优B卷】
- 2026安徽芜湖市劳动保障人力资源有限公司产业后备工程师人才储备1人考前冲刺试卷含答案详解(完整版)
- 中央广播电视总台招聘15人备考题库附答案详解【能力提升】
- 2026重庆某国有企业外包岗位(项目管理处客服主管)招聘1人模拟试卷及答案详解(必刷)
- 2026上海科技大学信息科学与技术学院王春东课题组招聘工程师1人模拟试卷附答案详解(黄金题型)
- 中国融通资源开发集团有限公司物资接收、仓储人员专项招聘87人考试参考题库及答案详解
- 2026年中职美容美体艺术(美容护肤基础)试题及答案
- 2025辽宁盘锦北方沥青股份有限公司大学毕业生招聘18人笔试历年参考题库附带答案详解
- 定额〔2026〕19号 电力工程造价与定额管理总站关于发布2025年版电力建设工程概预算定额价格水平调整办法的通知
- 煤矿新工人入井安全须知培训
- 护理质量培训与技能提升
- TCCSA 604-2024温室气体 产品碳足迹量化方法与要求通信电缆
- 日语阅读试题及答案
- 昆明滇池国家旅游度假区国有资产投资经营管理(集团)有限责任公司招聘考试试题
- 企业财务支出审批制度
- 审计署保密制度
评论
0/150
提交评论