工程量汇总,,,,,,,,,,
项目名称,单位,工程量,20孔,15孔,4孔,20孔涂塑管,3*1.5电缆井,6*1.8电缆井,6*1.8电缆弯井,拖管
人工挖沟槽土方,m3,23091.35,13893.39,176.80,180.00,593.61,180.74,7144.61,922.22,
土方外运,m3,23081.53,13893.39,176.80,180.00,593.61,170.92,7144.61,922.22,
土方回填,m3,7017.79,5343.61,66.30,80.60,228.31,35.29,1113.18,150.50,
砂石回填,m3,3399.68,1789.83,24.70,36.71,76.47,274.52,1058.46,138.98,
碎石垫层,m3,859.20,554.70,9.75,10.77,23.70,8.99,224.25,27.05,
20孔,,,3698.00,,,,,,,
C15混凝土偎管,m3,3738.68,3738.68,,,,,,,
模版,m2,8579.36,8579.36,,,,,,,
D150mm排管,m,73960.00,73960.00,,,,,,,
管内预留8#铁丝,kg,,,,,,,,,
15孔,,,,65.00,,,,,,
C15混凝土偎管,m3,51.81,,51.81,,,,,,
模版,m2,117.00,,117.00,,,,,,
D150mm排管,m,975.00,,975.00,,,,,,
,,,,,,,,,,,
4孔,,,,,133.00,,,,,
C15混凝土偎管,m3,38.76,,,38.76,,,,,
模版,m2,170.24,,,170.24,,,,,
D150mm排管,m,532.00,,,532.00,,,,,
,,,,,,,,,,,
4孔,,,,,,,,,,
C15混凝土偎管,m3,,,,,,,,,
模版,m2,,,,,,,,,
D100mm排管,m,,,,,,,,,
,,,,,,,,,,,
2孔,,,,,,,,,,
C15混凝土偎管,m3,,,,,,,,,
模版,m2,,,,,,,,,
D150mm排管,m,,,,,,,,,
,,,,,,,,,,,
20孔D150*4涂塑钢管,,,,,,158.00,,,,
C15混凝土偎管,m3,159.74,,,,159.74,,,,
模版,m2,366.56,,,,366.56,,,,
D150mm排管,m,3160.00,,,,3160.00,,,,
,,,,,,,,,,,
拖管,,,,,,,,,,
2孔,m,30,,,,,,,,
15孔,m,25,,,,,,,,
20孔,m,2878,,,,,,,,
,,,,,,,,,,,
管内预留铁丝8#,kg,13487.32,13487.32,,,,,,,
,,,,,,,,,,,
,,,,,,,,,,,
3*1.5电缆井,座,,,,,,14.00,,,
槽底平整,m2,115.95,,,,,115.95,,,
C15混凝土垫层,m3,16.85,,,,,16.85,,,
模版,m2,16.41,,,,,16.41,,,
C25钢筋混凝土底板,m3,16.85,,,,,16.85,,,
模版(底板),m2,24.61,,,,,24.61,,,
仓面,m2,112.31,,,,,112.31,,,
M10水泥砂浆砌MU10墙身,m3,32.46,,,,,32.46,,,
单排脚手架,m2,224.29,,,,,224.29,,,
1:2水泥砂浆,m2,135.26,,,,,135.26,,,
C25钢筋混凝土盖板预制,m3,11.66,,,,,11.66,,,
模版(盖板板),m2,380.52,,,,,380.52,,,
钢筋(盖板),kg,240.22,,,,,240.22,,,
,kg,276.24,,,,,276.24,,,
,kg,971.51,,,,,971.51,,,
,kg,2197.24,,,,,2197.24,,,
,kg,679.49,,,,,679.49,,,
,kg,4115.06,,,,,4115.06,,,
垫梁C30预制,m3,4.56,,,,,4.56,,,
模版,m2,55.24,,,,,55.24,,,
钢筋(垫梁),kg,71.67,,,,,71.67,,,
,kg,279.87,,,,,279.87,,,
,kg,48.72,,,,,48.72,,,
,kg,685.84,,,,,685.84,,,
,,,,,,,,,,,
,,,,,,,,,,,
6*1.8电缆井,座,,,,,,,138.00,,
槽底平整,m2,2421.90,,,,,,2421.90,,
C15混凝土垫层,m3,224.25,,,,,,224.25,,
模版,m2,248.40,,,,,,248.40,,
C25钢筋混凝土底板,m3,972.90,,,,,,972.90,,
模版(底板),m2,728.64,,,,,,728.64,,
仓面,m2,2063.10,,,,,,2063.10,,
C25钢筋混凝土墙身,m3,1030.86,,,,,,1030.86,,
模版(墙身),m2,4371.84,,,,,,4371.84,,
模版(墙身),m2,3875.04,,,,,,3875.04,,
双排脚手架,m2,13447.66,,,,,,13447.66,,
仓面,m2,3875.04,,,,,,3875.04,,
C25钢筋混凝土顶板,m3,515.78,,,,,,515.78,,
模版(顶板),m2,3566.40,,,,,,3566.40,,
脚手架,m3,2682.72,,,,,,2682.72,,
仓面,m2,2063.10,,,,,,2063.10,,
混凝土井筒,m3,106.77,,,,,,106.77,,
模版,m2,282.26,,,,,,282.26,,
,,,,,,,,,,,
,,,,,,,,,,,
6*1.8转弯电缆井,座,,,,,,,,14.00,
槽底平整,m2,318.01,,,,,,,318.01,
C15混凝土垫层,m3,29.45,,,,,,,29.45,
模版,m2,29.56,,,,,,,29.56,
C25钢筋混凝土底板,m3,112.05,,,,,,,112.05,
模版(底板),m2,87.23,,,,,,,87.23,
仓面,m2,270.89,,,,,,,270.89,
C25钢筋混凝土墙身,m3,125.44,,,,,,,125.44,
模版(墙身),m2,596.06,,,,,,,596.06,
模版(墙身),m2,480.17,,,,,,,480.17,
双排脚手架,m2,1051.63,,,,,,,1051.63,
仓面,m2,501.77,,,,,,,501.77,
C25钢筋混凝土顶板,m3,67.72,,,,,,,67.72,
模版(顶板),m2,334.47,,,,,,,334.47,
脚手架,m3,362.17,,,,,,,362.17,
仓面,m2,270.89,,,,,,,270.89,
混凝土井筒,m3,9.28,,,,,,,9.28,
模版,m2,13.93,,,,,,,13.93,
钢板桩,,,,,,,,,,
,名称部位,长度,高度,宽度,面积(支撑),每米根数,总重,,,
水泥维纶管,2孔,0.000,1.080,1.010,0.000,,,,,
,4孔,133.000,1.080,1.010,287.280,,,,,
,15孔,65.000,1.340,1.700,174.200,,,,,
,20孔,3698.000,2.210,1.700,16345.160,,,,,
涂塑钢管,20孔,158.000,2.210,1.700,698.360,,,,,
,3*1.5电缆井,48.720,1.470,2.180,143.237,,,,,
,6*1.8电缆井,897.000,2.950,2.700,5292.300,,,,,
,6*1.8*转弯电缆井,137.410,2.900,2.700,796.978,,,,,
,,5137.130,,,23737.515,,,,,
,,,,,,,,,,,
钢板桩根数,,,,,,4.425,,,,
,,,,,,,,,,,
钢板桩重量,,,,,,,8564.914,,,
2[25b,,5137.130,,,,,645.224,,,
273*7钢管,根数,0.000,,,,0.000,,,,
,,44.777,,,,44.333,,,,
,,36.833,,,,21.667,,,,
,,2095.533,,,,1232.667,,,,
,,89.533,,,,52.667,,,,
,,807.300,,,,299.000,,,,
,,123.669,,,,45.803,,,,
,总长,3197.646,,,,,148.051,,,
300*300*10钢板,个数,6784.547,,,,,47.933,,,
,,,,,,,,,,,
根据工期及现场实际情况:北边要求5月15号完工,工期75天,考虑天气及外部原因每天确保150米,分四个作业队。则钢板桩按100米实际购货数量:1、150米*4.42根*6米*31.4kg/m*2/1000=250.5吨;2、150*31.4*4/000=18.84吨;3、150/3*2.7*46.3=6.25。钢板桩租赁费按70元则算为110万,而购买250.5吨为100万另加采保费;横撑测算根据周转20次计价;,,,,,,,,,,
模版套数计算,,,,,,,,,,
根据工期及现场实际情况:北边要求5月15号完工,工期75天,考虑天气及外部原因每天确保4座井,分2个作业队。根据技术规范和实践经验:内膜和顶膜14天才能拆模,则一套模版实次数5次、则内膜外膜需要274/5=55套;外膜按7天拆模考虑,则一套模版需要周转11次、则外膜需要138/11=13套。,,,,,,,,,,
部位,单位,含量,容重,重量和(t),定额含量折算模版重量(t),增加模版(t),,,,
底模,m2,5.28,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 高三地理一轮复习教学设计:非洲区域地理核心考点突破与思维构建
- 高中一年级英语必修一Unit 2 Travelling Around听说课教学设计
- 初中九年级历史中考冲刺“小切口·大主线”专题复习教学设计
- 初中八年级道德与法治“向校园欺凌说‘不’”主题班会教案设计
- 高三地理教学设计:生态脆弱区综合治理的区域认知与实践路径
- 小学三年级劳动浙教版“煮鸡蛋与蒸馒头”教学设计
- 初中八年级地理教学设计:素养导向下热爱富饶的中国区域认知实践
- 七年级数学教学设计:不等式与方程组综合应用专题复习
- 初中语文七年级上册第四单元写作思路清晰教学设计
- 初中九年级科学《物体的内能(第一课时)》教学设计
- GB/T 26071-2026太阳能电池用硅单晶及硅单晶片
- 《中国教育史》孙培青1
- 雨课堂学堂云在线《经典与思考-人文清华大师面对面 》单元测试考核答案
- T-ACRI 0049-2025 锂离子电池正极材料烧结用匣钵
- e基建2.0成功施工方案
- 草原有害生物防治项目施工方案
- 透析患者病历汇报
- 贵州家乡介绍课件
- 2025榆林能源集团有限公司招聘工作人员(473人)笔试参考题库附带答案详解
- 互联网骨干直联点监测系统项目需求
- 基于HAL库的STM32F1开发实践教程-课件全套 第1-11章 GPIO输出-云平台接入(485、CAN、云平台)
评论
0/150
提交评论