必修2英语第二单元课件_第1页
必修2英语第二单元课件_第2页
必修2英语第二单元课件_第3页
必修2英语第二单元课件_第4页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、必修2英语第二单元课件必修2英语第二单元课件已经为大家准备好啦,老师们,大家可以参考以下教案内容,整理好自己的授课思路哦!Teaching Aims:1.Get the Ss to grasp the main meaning of the whole text.2.Ask the Ss to retell the text according to the questions.Teaching procedures:Step I Lead in1.Check homework:2.Show the map of Egypt and Africa3.Get the Ss to respond

2、the teachers questions:T: Where is Africa ?Where is Egypt ?What is the river?What is the dam ?4.Ask one student to say something about Egypt.Step II. Watch the video1.可以在(探索)中查找关于埃及或金字塔或阿司旺大坝或阿布神庙.2. 或者观看本文的录象资料。Q: Is the High Dam a successful project ? (No)Step III. Presentation1.Read the text agai

3、n and give them three questions ,Qs: (1).Why was the High Dam built ?(2).What is the High Dam like ?(3).What were the problems with the building of the dam?2.Discuss the answers in pairs.3.Discuss the answers in class.4.Try to help the Ss to be able to retell the text in their own words.The possible

4、 answers:1) The River Nile used to flood large areas every year and destroyed houses and crops. The new dam can control the waters of the Nile so that they run regularly all through the year. Electricity(20-50%of the electricity which Egypt needs )can be produced from the water which runs through th

5、e base of the dam.2) The High Dam is the biggest in the world. It is 3830 meters long, 980 meters wide an the base and 40 meters wide at the top. The lake made by the dam is 500 kilometers long.3) The water level of the lake was going to rise by 63 meters. It would be necessary to move 53000 people

6、from their villages. A lot of important old temples dated from about 1250 BC would be covered by the water of the new lake so they would be in danger.Step III DiscussThe Three Gorges Dam Project and the problems.建议:提供有关三峡工程的一些数据(开始,进程,及规模)三峡工程全称为长江三峡水利枢纽工程。整个工程包括一座混凝重力式大坝,泄水闸,一座堤后式水电站,一座永久性通航船闸和一架升船

7、机。三峡工程建筑由大坝。水电站厂房和通航建筑物三大部分组成。大坝坝顶总长3035米,坝高185米,水电站左岸设14台,右岸12台,共装机26台,前排容量为70万千瓦的小轮发电机组,总装机容量为1820千瓦时,年发电量847亿千瓦时。通航建筑物位于左岸,永久通航建筑物为双线五包连续级船闸及早线一级垂直升船机。Step III Practice.根据问答提示,写一篇短文。(可做口头练习)1. Where is the Palace Museum ? (in the center of Beijing)2. How big is it ? (an area of 72 hectares)3. Whe

8、n was it first built? (in the early 15thcentury)4. How many people did it take to work on it? (1,000,000)5. How long did the building of the project last? When was it finished? (14 years,1492)6. What happened to some of the houses during the later years? (rebuild)7. Who used to live in it ? (twenty-

9、four emperors)8. When didi it become a museum and open to the public ? (1925)答案:The Palace Museum is in the center of Beijing. It covers an area of 72 hectares(公顷). It was first built in the early 15thcentury. It took 1,000,000 people to work on it. The building of the project lasted 14 years and was finished in 1420. During the later years, some of the houses were rebuilt. Twenty-four emperors used to live in it. It was not until 1925 that the Palace Museum became a museum. Since then the place has been open to the public.

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论