版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、VALEO 10 Tools deployment2012,2012 I 2,Customer Voice :,Valeo Quality System tool-box is good and we see the added value of Special Product & Process Characteristics (SPPC), RAISE, Supplier Quality Step Up (SQSU). But you must ensure : Teams understand and execute these tools Deployment consistently
2、 between sites and regions Speed of execution is the same between sites / regions The tools are in your culture You get results,TO SATISFY US: Good Quality, Right Quantity, Perfect Launch, Launch must be perfect and a breakthrough.,2012 I 3,10 Tools coming from 5 AXES,Our System A complete toolbox W
3、ith a focus on ourmanufacturing sites. Which of our tools will we focus on to control our operation, projects, suppliers in a standardway. site by site?,2012 I 4,10 Tools. Starting with Basic Attitude,QRQC (All),Basic Attitude,Line QRQC VPS 2.5.2,APU QRQC VPS 2.5.2,Plant QRQC VPS 2.5.2,Safety QRQC I
4、P 1.2,Warranty QRQC CI 3.14,Project QRQC CI 3.6,Supplier QRQC SI 4.1.1 / 2,Logistics QRQC VPS 2.5.2,2012 I 5,10 Tools Conditions to Produce Quality,QRQC (All),5S (VPS 2.1.1) Work Instructions / Operator Certification Zero Rework Stop Scrap Change Control (4M Matrix),Basic Attitude,Conditions to Prod
5、uce Quality,We are as weak as our weakest Operation, Project, Supplier.,Sweep Away Sort & Organize Spotless & Inspect Standardize Sustain & Progress,2012 I 6,10 Tools Conditions to Produce Quality,QRQC (All),5S Work Instructions / Operator Cert. (IP 1.5) Zero Rework Stop Scrap Change Control (4M Mat
6、rix),Basic Attitude,Conditions to Produce Quality,We are as weak as our weakest Operation, Project, Supplier.,2012 I 7,QRQC (All),5S Work Instructions / Operator Certification Zero Rework Stop Scrap Change Control (4M Matrix),Basic Attitude,Conditions to Produce Quality,We are as weak as our weakest
7、 Operation, Project, Supplier.,Rework not under control Rework out of process under control Rework in process - under control 100% rework elimination,10 Tools Conditions to Produce Quality,2012 I 8,10 Tools Conditions to Produce Quality,QRQC (All),5S Work Instructions / Operator Certification Zero R
8、ework Stop Scrap (VPS 2.5.2) Change Control (4M Matrix),Basic Attitude,Conditions to Produce Quality,We are as weak as our weakest Operation, Project, Supplier.,2012 I 9,10 Tools Conditions to Produce Quality,QRQC (All),5S Work Instructions / Operator Certification Zero Rework Stop Scrap Change Cont
9、rol (CI 3.9) (4M Matrix),Basic Attitude,Conditions to Produce Quality,We are as weak as our weakest Operation, Project, Supplier.,Defining level of required communication and validation (Valeo, Suppliers and Tier II) Minimum requirement Perfect 4M Application required,2012 I 10,10 Tools Built in Qua
10、lity / Anticipation,SPPC Man. (VPS 2.5.1) / Project (CI 3.10.3) Launch Control (FDPR) Standardization Committee / Technical Committee PFMEA check on Genba,Built in Quality / Anticipation,We are as weak as our weakest Operation, Project, Supplier,Special Product & Process Characteristic Project Manuf
11、acturing Supplier,2012 I 11,10 Tools Built in Quality / Anticipation,SPPC - Manufacturing / Project Launch Control (FDPR (CI 3.9) Standardization Committee / Technical Committee PFMEA check on Genba,Built in Quality / Anticipation,We are as weak as our weakest Operation, Project, Supplier,Full Day P
12、roduction Run Assure process readiness on time Safety, Quality, Efficiency - Supply PV,2012 I 12,10 Tools Built in Quality / Anticipation,SPPC - Manufacturing / Project Launch Control (FDPR) Standardization Committee / Technical Committee PFMEA check on Genba,Built in Quality / Anticipation,We are a
13、s weak as our weakest Operation, Project, Supplier.,Integral part of Raise - managing and controlling robust standards Standardization Committee is at Product Group Level Owning the standards Technical Committee is at Development Center Level Applying the standards VTES in Manufacturing sites,2012 I
14、 13,10 Tools Built in Quality / Anticipation,SPPC - Manufacturing / Project Launch Control (FDPR) Standardization Committee /Tech. Committee (CI 3.12) PFMEA check on Genba (TQ 5.4),Built in Quality / Anticipation,We are as weak as our weakest Operation, Project, Supplier.,Creating a culture of obser
15、vation with a San Gen Shugi mindset Owned by Site General Management Managing detection of risk to safety and product Quality,2012 I 14,10 Tools are,QRQC (All),5S Work Instructions / Operator Certification Zero Rework Stop Scrap Change Control (4M Matrix),SPPC - Manufacturing / Project Launch Control (FDPR) Standardization Committee / Technical Committee PFMEA check on Genba,Basic Attitude,Conditions t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 壁内血肿并发症的预防与护理
- 护理管理学课件及答案
- 肺结节手术患者的术前教育及术后指导
- 审计案例公布制度
- 审计局信息化建设制度
- 交易风控制度
- 对下属基层审计制度
- 加工厂财务规章制度
- 审计署机关档案管理制度
- 套保风控制度
- 2026河北衡水恒通热力有限责任公司招聘28人笔试备考试题及答案解析
- 2026届甘肃省兰州市下学期高三一模物理试题(含答案)
- 1.3“开元盛世”与唐朝经济的繁荣 课件(内嵌视频) 2025-2026学年统编版七年级历史下册
- 初中英语语法填空专项练习含答案解析
- 2026年人教版三年级下册数学全册教学设计(春改版教材)
- 华为班组长培训课件
- 电力线路巡检报告模板
- 劳务合同2026年合同协议
- 2025年四川省拟任县处级领导干部任职资格试题及参考答案
- 鼾症科普宣传课件
- 中国特发性颅内压增高诊断与治疗专家共识(新版)课件
评论
0/150
提交评论