1、The Goal,A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox,The Goal,Back to the story: Q. Where does Alex and company find the bottleneck? They find two bottlenecks, NCX-10 and Heat Treat Q. What is thier first approach to improving the flow through the bottlenecks and ultimately imp
2、roving productivity. 1. Move QC in front of bottlenecks. 2. Make a list of all late jobs and what components from those jobs flow through the bottleneck machines. They then create a schedule/list in due date order and instruct the bottleneck operators to only work on those jobs in that order.,The Go
3、al,Back to the story: Q. Does this scheduling system work (e.g. get late jobs completed while always keeping bottleneck running)? A. No, because the late job components are not always waiting in front of the bottleneck machines. Q. What do they do to rectify this? A. Create a red tag (parts that tra
4、vel through the bottleneck) / green tag system for all jobs throughout the plant such that any job with a red tag which arrives at a machine is given priority. If they are in the middle of a run, then if the run takes longer than 30 minutes to complete, stop that job and start the red tag job. If no
5、 red tags, then ok to process green tag jobs. If more than one red (or green tag), then process job with lower number on tag.,The Goal,Back to the story: Q. What do they do next to further off-load the Herbies / bust the bottleneck? Gold tags placed on parts that have traveled through the bottleneck
6、 everyone extra careful not to damage. Dedicate personnel at NCX-10 and Heat Treat even though they are idle much of the time, just dont let machine idle. Send out some portion of heat treat parts to vendor in town. Found old equipment (that is less efficient) to run in parallel to NCX-10. Fully loa
7、d furnace when possible (e.g. mix batches). Reduce setup time with new fixtures. Were able to process some parts differently so heat treat wasnt required.,The Goal,Back to the story: Q. What were the results of these bottleneck busting tactics? New monthly shipping record from old record of 2 millio
8、n to new record of 3 million. 57 customer orders shipped versus old record of 31. WIP Inventories reduced 12%.,The Goal,What happens next? The bottlenecks are apparently expanding material is backing up at the milling machines, and non-bottleneck parts (green tags) are not reaching assembly even tho
9、ugh all bottleneck parts (red tags) are available at assembly.,The Goal,What happens next? Jonah revisits plant and discusses relationship between bottleneck(X) and non-bottleneck(Y) machines. Y X 3) Y A 4) Y Product A X Y X S X Product B S E M B L Y,The Goal,Jonah believes the “new bottlenecks” are
10、 not real bottlenecks, but self-created bottlenecks. Why? Material is being “released” to the plant just to keep the non-bottleneck machines busy. This improves these machines efficiency measures, but does not help the goal. Jonah: “A system of local optimums is not an optimum system at all; it is a
11、 very inefficient system”. Lesson: Do not try to make non-bottlenecks work all the time. They should be idle some of the time!,The Goal,So how do you go about fixing the problem of keeping the non-bottleneck machines working at the same rate as the bottleneck? Recall the boy scout hike: Herbie is in
12、 the middle of the line and cannot be moved, so how do you keep the kid in the front walking at the same pace as Herbie? Alexs kids: use a rope and a drum. Rope: Attach a rope from Herbie (bottleneck machine) to the kid at the front (assembly). The length of rope represents inventory. Drum: Herbie t
13、ells the kid at the front to slow down or speed up (beats the drum). Need some kind of signaling or communication between assembly and the bottleneck.,The Goal,How is the rope and drum concept implemented in the plant? Identified it takes about 2 weeks from when parts are released to the floor until
14、 they get to bottleneck. Setup system that monitors when inventory is processed at the bottleneck. Material required 2 weeks later is then released to the floor. Non-bottleneck parts are released according using the same principle but tied to assembly.,Bottleneck,Material Release,2 weeks lead time,C
15、ommunicate release,The Goal,What is the result of this new release system? WIP is down. Revenues are up. Efficiencies dropped initially, but have come back up. The backlog of orders is completely gone (satisfied customers). How does management respond? Happy Somewhat skeptical success will last Want
16、s 15% more revenue next month!,The Goal,In order to improve by another 15% what does Jonah suggest as the “next logical step”? Cut batch sizes for non-bottleneck parts in half. What is the impact of reducing these batch sizes? WIP for non-bottleneck parts reduced by half. Significantly reduce time p
17、arts spend in plant. Leads to increased responsiveness (from 6-8 weeks to 3-4 weeks). What about the time to handle increased number of setup? Doesnt matter if occurs on non-bottleneck operations.,Process Time,Setup Time,Queue Time,Wait for Assembly Time,Time parts spend in the plant,The Goal,Also t
18、o help get the 15%, Alex calls the marketing/sales manager and bets him he can reduce lead time to fill orders. What does Alex expect to gain by reducing lead times to ship from what used to be 4 months to 4 weeks? Increased sales! The bottleneck had moved to customer demand. Quick response on promi
19、sed due dates should translate to a competitive advantage.,The Goal,Everything is going good now except it looks like part costs are going up. However, in reality all costs have gone down. How can this be? The accounting rules: Cost per part = raw material + direct labor + burden cost Burden cost is
20、 all the indirect labor costs. Burden = direct labor x burden factor Cost per part has risen because more setups are occurring because of smaller batch sizes. However, workers were idle, so the increased number of setups didnt really increase costs.,The Goal,What other performance measure made them
21、not look as good as they actually were. Answer: Inventory Inventory is counted as an asset on the balance sheet. When the plant worked hard to reduce inventories to improve their throughput and responsiveness, it looked as if their assets had fallen.,The Goal,Sacred Cows Slaughtered: Worker efficien
22、cy Optimal batch size Releasing work to the floor to keep people busy Accounting rules,The Goal,Why Alexs plant was successful: Change in Focus from the “cost world” to the “throughput world”,Cost,Throughput,Inventory,Throughput,Inventory,Cost,The Goal,What process did they use to shift their focus
23、to the “throughput world”? The Theory of Constraints Step 1: Identify the systems constraints (NCX10 and oven) Step 2: Decide how to exploit the systems constraint (dont take lunch break on bottleneck machines) Step 3: Subordinate everything else to the above decision (red tags and green tags) Step 4: Elevate the systems constraint (bring back
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年水发集团招聘试题及答案
- 2026年大名县医疗事业单位人员招聘笔试模拟试题及答案解析
- 2026年灵寿县医疗事业单位人员招聘笔试模拟试题及答案解析
- 2026年三原县医疗事业单位人员招聘考试模拟试题及答案解析
- 2026年宜章县医疗事业单位人员招聘笔试备考题库及答案解析
- 2026年江陵县医疗事业单位人员招聘考试备考试题及答案解析
- 2026年景泰县带编教师招聘笔试备考题库及答案解析
- 2026年阜平县带编教师招聘笔试备考试题及答案解析
- 2026年康保县带编教师招聘考试模拟试题及答案解析
- 2026年射阳县医疗事业单位人员招聘考试备考试题及答案解析
- 第5课 古代希腊 课件(26张 内嵌视频)
- 2026广东省电力工业燃料有限公司新能源分公司招聘15人笔试模拟试题及答案详解
- 2025年中级会计师《经济法》真题及答案解析
- 2026-2030中国大型锻件市场应用规模及需求前景分析研究报告
- 公共综合廊道工程社会稳定风险评估报告
- 2026日本智能手机行业市场现状供需调研及投资前景规划分析报告
- 2026年秋季湘教版(新版)九年级上册数学教学计划及进度表
- 2026全球智能机器人行业市场深度分析及未来趋势与发展战略研究报告
- 湖北省荆州市监利市2025-2026学年七年级下学期6月期末数学试题(含答案)
- 小学生爱国主义教育与使命担当小学主题班会课件
- 2026年湖北省中考历史试卷(含答案)
评论
0/150
提交评论