版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、基金会现场总线Foundation Fieldbus,魏 华 WEI HUA 中海石油化学股份有限公司 China Blue Chemical Ltd.,安装与调试 Installation and commissioning,概 述 /Brief introduction,我不是Ff专家,没有高深的理论基础 Im not a Ff expert, and dont have deep theoretical knowledge 我也不是产品销售人员,虽然讲述的案例中有某些产品有关 I am not a sales man, although some products are mention
2、ed in the presentation 工作生涯中使用过气动仪表、电动仪表、DCS、DCS+HART、Ff I used Pneumatic/ Electrical instrument, DCS、DCS+HART、Ff in my career 全程参与了4套基金会现场总线项目的设计、安装、调试及维护工作 Full participation in 4 Ff projects, including design, installation, commissioning and maintenance 安装和调试案例全部来自于工程实践 Cases mentioned in the pre
3、sentation all come from engineering practice,演讲提纲/AGENDA,基金会现场总线的安装 Foundation fieldbus installation,基金会现场总线调试 Foundation Fieldbus commissioning,安装案例分析 Case analysis of on-site installation,基金会现场总线安装指南 Foundation Fieldbus Installation Guide,严格区分信号地(Signal grounding)和保护地(Protection grounding),信号地按照小于
4、1.5标准 Strict distinction between the Signal grounding and Protection grounding, Grounding resistance of signal grounding should be less than 1.5 对施工单位单独进行基金会现场总线施工和接线培训,培训的内容可以参考PEPPERL+FUCHS公司的Wiring And Installation Guide For Foundation Fieldbus和基金会现场总线的文件Fieldbus Foundation 31.25kbit/s Wiring and
5、 Installation Guide Provide workers with specialized training on installation and wiring, the content of the training can refer to from P+F and 严格按照基金会现场总线设计文件进行施工和检查,对于现场电缆长度和总线设备的位置变更都必须得到仪表首席工程师(Instrument Leader Engineer)的书面批准 Construction and inspection must strictly comply with Foundation Fiel
6、dbus design file, the modification of cable length or location of Field device must be approved in writing by the Instrument Lead Engineer,对Ff施工管理的三点建议: Three suggestions for Ff construction management:,屏蔽与接地(一) Shielding and grounding (1),图1 机柜硬接地、设备硬接地 Direct grounding at both sides,图2 机柜电容接地、设备硬接
7、地 Field side is earthed directly and cabinet side capacitively,现场设备/Field device,现场设备/Field device,屏蔽与接地(二) Shielding and grounding (2),图3 机柜硬接地、设备电容接地 Cabinet side is earthed directly and field side capacitively,图4 机柜单点接地 Only cabinet side of the shield is earthed,机柜 Cabinet,接地/Ground,屏蔽/Shield,机柜
8、Cabinet,接地/Ground,屏蔽/Shield,现场设备/Field device,现场设备/Field device,屏蔽与接地(三) Shielding and grounding (3),北美安装规范(North America Specification): 北美绝大部分的工程设计和安装都按照图4所示的接地方式进行设计和施工,这种接地安装方式在传统的DCS系统中普遍采用。 In North America, most of the projects grounding systems are designed as shown in Figure 4, this groundi
9、ng method is commonly used in traditional DCS. 欧洲安装规范(Europe Specificaiton) 在欧洲的工程设计和安装一般都要求按照图3所示的接地方式进行设计和施工,Ff接地推荐采用图3的方式。 In Europe, normally the projects grounding systems are designed as shown in Figure 3. For Ff project, this grounding method is recommended.,注意:Ff现场运行中故障的80%-90%都是由于接地或者屏蔽原因导致
10、的! Note: 80% -90% of the Ff operation failures are due to bad grounding or shielding! ! !,基金会现场总线电缆 FOUNDATION fieldbus cable,IEC 61158-2对现场总线电缆的要求: Specifications of the fieldbus cable according to IEC 61158-2,基金会现场总线电缆 FOUNDATION fieldbus cable,IEC物理层规定标准的A型电缆参数如下表: Typical Ff cable characteristic
11、s per IEC Physical Layer Standard,基金会现场总线电缆 Foundation Fieldbus Cable,电缆桥架的布置 Cable tray layout,Lurgi公司设计的电缆桥架 Cable tray design from Lurqi,F3:现场总线电缆桥架 F3: For Fieldbus I3:本安信号电缆桥架 I3: For IS signals N3:非本安电缆桥架 N3: For Non-IS signals 电缆桥架布置建议: Some advices of Cable tray: 1、Ff和本安、非本安信号分开 Separation b
12、etween Ff, IS and Non-IS. 2、强电信号和弱电信号分开 Separation between Power supply system and Control System 3、桥架间距大于400mm Tray spacing greater than 400mm,现场总线安装费用对比(Ff) Comparison of Installation Costs(Ff),2000年安装工程预算定额海南省基本价(海南省建设厅) Basis price, By Department of construction of Hainan Province,2000,现场总线安装费用对
13、比(HART) Comparison of Installation Costs(HART),演讲提纲/AGENDA,基金会现场总线的安装 Foundation fieldbus installation,基金会现场总线调试 Foundation Fieldbus commissioning,安装案例分析 Case analysis of on-site installation,基金会现场总线调试需要的条件,基金会现场总线调试的重点 Main focuses of the Foundation Fieldbus commissioning,物理层测试工具 Test Equipment,FBT
14、 5,FBT 3,475,DM-AM,HD2-DM-A,物理层安装调试 Physical Layer Installation and Commissioning,现场总线网段电压(Segment Voltage) 现场总线网段电流(Segment Current) 信号幅值(Signal Level) 噪音幅值(Noise Level) 抖动(Jitter) DC不平衡(DC Unbalance),1、可以在主控室诊断电脑完成所有的物理层诊断工作 The physical layer diagnosis can be done in CCR. 2、诊断结果可以对物理层设备安装进行全面检查,精
15、度提高 The diagnosis conducts a comprehensive inspection of the physical layer components installed 3、效率极大提高,使用移动测试工具可以节约95%的时间,采用在线先进诊断工具可以节约99%的时间 A very eFficient way, Reduces commissioning time by up to 95%,以P+F公司的现场总线先进诊断工具HD2-DM-A为例: Take HD2-DM-A(Advanced Diagnostic Tool for Fieldbus, by P+F)for
16、 example:,物理层安装调试 Physical Layer Installation and Commissioning,控制功能调试 Control Function Test,控制功能调试 Control Function Test,控制功能调试 Control Function Test,控制功能调试案例 Control function commissioning case,1、试验PT011224A/B/C的高选功能和PID控制功能 Test high selection function and PID function of PT011224A/B/C 2、试验PT0112
17、24A/B/C量程修改和PV011224自动标定功能 Test scale modification and automatic calibration of PT011224A/B/C 3、测试电源冗余、接口卡冗余、设备的离线和在线功能、短路保护功能、即插即用功能 Test power redundancy, interface card redundancy, equipment oFfline and online features, short circuit protection, plug-and-play functionality,现场总线的诊断功能 Fieldbus diag
18、nosis,2020/7/22,物理层监测Physical Layer : 自诊断Diagnostics 物理层监测Physical Layer Monitoring 预测性维护Predictive Maintenance,智能现场设备Intelligent Field Devices: 自诊断功能Diagnostics 设备管理功能Asset Management 预测性维护Predictive Maintenance,T,智能主机Intelligent Host: 自诊断Diagnostics 设备管理功能Asset Management 冗余功能Redundancy 预测性维护Predi
19、ctive Maintenance,现场总线的诊断功能 Fieldbus diagnosis,主机诊断功能 HOST system diagnosis,物理层诊断功能 Physical layer diagnosis,现场设备诊断功能 Field device diagnosis,控制功能和参数优化 Control strategy and parameter optimization,演讲提纲/AGENDA,基金会现场总线的安装 Foundation fieldbus installation,基金会现场总线调试 Foundation Fieldbus commissioning,安装案例分
20、析 Case analysis of on-site installation,屏蔽与接地故障案例 Shielding and Grounding Fault Cases,示波器图形Oscilloscope Display,噪音及抖动异常 Noise and Jitter is out of spec,故障描述 Fault Description : 阀门PV015708在运行过程中经常出现5%的跳变,设备在网段上经常显示瞬间离线,然后在线! In normal operation , the signal of PV015708 is always unstable( 5% signal s
21、kipping). Equipment status is often displayed for an instant oFfline, then online.,整改后的示波器图形 Oscilloscope Display after corresponding improvement,整改后的噪音及抖动 Noise and Jitter after corresponding improvement,Shielded cable is not grounded,Earthbar is not grounded,屏蔽与接地故障案例 Shielding and Grounding Fault
22、 Cases,电缆及终端电阻故障案例 Cable and Terminator Fault Case,故障描述 Fault Description : 现场总线网段S060.03调试过程中发现该网段的现场总线设备通讯不稳定,经常出现通讯故障(CNF,CONNECTION STATUS FAILURE ALARM)导致设备离线。 During the commissioning of the fieldbus segment S060.03 ,field device communication is unstable, and it (CNF, CONNECTION STATUS FAILURE
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 网约配送员班组考核强化考核试卷含答案
- 堆场机械维修工安全知识水平考核试卷含答案
- 偏钨酸铵制备工安全实践能力考核试卷含答案
- 石油焦煅烧工岗前工作合规考核试卷含答案
- 电线电缆检验员安全素养考核试卷含答案
- 计算机维修工岗前标准化考核试卷含答案
- 聚丁烯装置操作工合规测试考核试卷含答案
- 炭素配料工测试验证评优考核试卷含答案
- 飞机模线样板钳工安全风险测试考核试卷含答案
- 采矿安全监控系统值班员安全素养能力考核试卷含答案
- 2026广播电视播音员主持人考试题库及答案
- 2026-2027学年高三第一次联考(月考)试卷地理+答案
- T/CI 874-2025红树林精准生态修复与成效评估技术规程
- 湖南九校联盟2027届高三上学期第一次联考化学(含答案)
- 第12课 历史性成就 第1课时 课件(内嵌视频)2026-2027学年道德与法治五年级上册统编版
- 医疗机构麻醉药品和精神药品管理规定2026解读
- CSCO肾癌诊疗指南2026
- 【新教材】2026年秋人教版(PEP)五年级上册英语全册教案(含教学计划)
- 2026年上海事业编全套真题及答案解析
- 八年级语文阅读理解教学设计
- 2026届上海市交大附属中学高考模拟信息考试化学试题(三)含解析
评论
0/150
提交评论