看板管理举例(英文).ppt_第1页
看板管理举例(英文).ppt_第2页
看板管理举例(英文).ppt_第3页
看板管理举例(英文).ppt_第4页
看板管理举例(英文).ppt_第5页
已阅读5页,还剩5页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Ways to schedule batch processes with kanban,Pattern production +Predictable sequence, stability -Inflexible to changes during shift,Sequence fixed, part time variable,8 hour cycle,P1,P2,P3,P4,P5,P6,Full,Empty,Trigger Point,Lot making with batch board +Visual control, shorter lots possible, info -Ma

2、ny cards per part #, requires discipline,Triangle kanban +Single kanban to control, pressure to reduce C/O time -Fixed quantity unfixed time cases only,天马行空官方博客: ;QQ:1318241189;QQ群:175569632,Sample triangle kanban flow,Inventory,1,Part # 15454,3,Signal kanban rail,Current,Next,Batch Process,Part # 1

3、5455,Part # 15456,15454,15455,15456,B,C,Note: Only 1 triangle kanban per part # is needed in this flow,Triangle Kanban,天马行空官方博客: ;QQ:1318241189;QQ群:175569632,Short exercise - Steps for setting up triangle kanban*,Step 1: Determine time available for changeover work. Step 2: Set the number of changeo

4、vers per day. Step 3: Establish a lot size for production. Step 4: Establish a trigger point for reorder.,*Assumes part numbers have already been dedicated to run on certain machines,Step 1: Determine time available for non-production work (1 machine*),*The three part numbers dedicated to this moldi

5、ng machine,Step 2: Set the number of change over events per day,天马行空官方博客: ;QQ:1318241189;QQ群:175569632,Step 3a: Establish the batch factor,Batch Factor =,Number of part numbers on the machine,Number of C/Os per day,3 part numbers,3 C/Os,= 1,Lot Size = 1 day of production per part number,In this molding machine example,Step 3b: Establish the lot size,Total 1000 pieces,Step 4: Establish the trigger point for reorder,Trigger point = Total lead-time to replenish Part takt time,*Inclusive of scrap loss,Step 4: Establish the trigger point for reorder (continued),*Assumes longest run time

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论