版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、WIRE BOND PROCESS INTRODUCTION,CONTENTS,ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator DEFECT,封裝簡介,晶片Die,金線 Gold Wire,導線架 Lead fram,Wafer Grinding,Die Bonding,Wafer Saw,toaster,Wire Bonding,Die Surface Coating,Molding,Laser Mark,Solder Ball Place
2、ment,Singulation,Packing,封裝流程,Dejunk TRIM,Solder Plating,Solder Plating,Dejunk TRIM,TRIM/ FORMING,BGA,SURFACE MOUNTPKG,THROUGH HOLE PKG,Wire Bond 原理,pad,lead,Gold wire,Ball Bond ( 1st Bond ),Wedge Bond ( 2nd Bond ),Al,B.PRINCIPLE,銲接條件,HARD WELDING Pressure (Force) Amplify 或著一個Die上出現不同Pad大小那就是以兩個Pad中
3、心距離為BPP,但是一般我們要取一個Die上最小的BPP,Bond Pad Pitch,Bond Pad Open,Bond Pad Open,Ball Size,Ball Thickness,Ball Size Ball Size = y; Area = (y/2) x/(y/2) = z g/mil,C,Ball bond,Test specimen,Specimen clamp,Shearing ram,Wire,Bond shoulder,Interfacial contactball bond weld area,Bonding pad,h,(A) Unsheared,C,L,C,B
4、all bond,C,L,Test specimen,Specimen clamp,Bonding pad,Full ball attached towire-except for regionsof intermetallic voiding,Ball separated at bonding pad-Ball interface-residual intermetallic(and sometimes portion of unalloyedball and metal) on pad in bondinteraction area,(D) Ball bond-bonding pad in
5、terface separation (typical Au to Al),C,Test specimen,Specimen clamp,Shearing ram,Wire,Minor fragment of ballattached to wire,Bonding pad,C,L,Ball sheared too high(off line, etc.)only aportion of shoulder andball top removed,Interfacial contactball bond weld area,(B) Wire (ball top and/or side) shea
6、r,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Major portionof ball attached to wire,Interfacial contact-ball bond weld areaintact,(C) Below center line shear, ball sheared through (typically Au to Au),C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Pad metallizationseparates fr
7、omunderlying surface,Residual pad on ballball-pad interfaceremains intact,(E) Bond pad lifts,Test specimen,Specimen clamp,C,Ball bond,C,L,Bonding pad,Bonding pad lifts,taking portion of underlyingsubstrate material with it,(F) Cratering,Residual pad and substrate attachedto ball,ball-pad interface r
8、emainsintact,Shear Failure Modes,Crater Test,Calculate (I),UP Time =,(Total Actual Production Times Total Repair Time ),Total Actual Production Time,DOWN TIME RATE=,Total Repair Time,Total Actual Production Times,Total Operator Actual Repair Time,Total Operator Repair Frequency Stoppages,Total Actua
9、l Production Times Total Operator Repair Time,Total Operator Repair Frequency Stoppages,Total Technical Actual Repair Times,Total Technical Repair Frequency Stoppages,MTTS (MEAN TIME TO STOP ) =,MTBS (MEAN TIME BETWEEN STOP)=,MTTA (MEAN TIME TO ASSISTANCE ) =,Calculate (II),MTBA (Mean Time Between A
10、ssistance) =,Total Actual Production Times Total Technican Repair Times,Total Technical Repair Frequency Stoppages,MTBF(Mean Time Between Failure)=,Total Actual Production Times Total Technician Repair Time,Total Change Parts Repair Frequency Stoppage,規格寬度,製程寬度,規格上限 - 規格下限,6 ( 公差),(上限 or 下限 ) - 平均值,
11、三個公差,CP ( 製程能力指標) =,CPK =,=,Quality,正常品 Material Problem 1st Bond issue (Peeling , Ball Lift , Off Center) 2nd Bond issue (滑針,縫點脫,short tail ) Looping Fail (wire snake wire,sweep wire loop base bent ),正常品,Material Problem,With Ball,Wire,Pad Size,Missing Ball,Wire Broken,Bonding Ball Inspection,Ball
12、Detection,Ball Size,Pad Center,Ball Center,Ball Placement (X,Y),Ball Off Pad,Bonding Ball Inspection (cont.),Ball Measurement,Peeling,1st Bond Fail ( I ),Ball Lift,1st Bond Fail (II),Ball Lift,Neck Crack,1st Bond Fail ( III ),Off Center,1st Bond Fail (IV),Off Center Ball,1st Bond Fail (V),Smash Ball,Smash Ball,With Weld,Wire,Capillary Mark,Missing Weld,Wire Broken,Lead,Bonding Weld Inspection,Weld Detectio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 38387-2025桥梁橡胶降噪伸缩装置
- 妊娠期外阴阴道炎的复发预防策略与效果评价的系统综述
- 病理学考试题裤及答案
- 妊娠ITP合并自身免疫病的诊疗策略
- 女职工职业相关妇科疾病预防策略
- 多重耐药菌感染的防控策略与实践
- 多药耐药肿瘤的质子治疗精准调控策略
- 化工制图技术考试及答案
- 2025年高职室内艺术设计(室内软装设计)试题及答案
- 2025年大学大三(高级财务会计)外币业务处理综合测试试题及答案
- 2026年煤矿矿长证考试题库及答案
- 《毛泽东思想概论》与《中国特色社会主义理论体系概论》核心知识点梳理及100个自测题(含答案)
- 分级护理质量考核标准
- 2026年黑龙江单招健康管理大类智慧健康管理职业适应性题库含答案
- 腾讯单位绩效管理制度
- (2025年)新疆阿拉尔市辅警招聘《公安基础知识》真题及答案解析
- 党的二十届四中全会精神题库
- 2025年福建省年省直遴选笔试真题及答案
- 2025 年大学园林(园林植物学)期末测试卷
- 脚手架安全培训
- 2025年宁夏回族自治区吴忠市市辖区红寺堡开发区太阳山镇国民经济和社会发展第十五个五年规划
评论
0/150
提交评论