制造管理诊断手法与实例.ppt_第1页
制造管理诊断手法与实例.ppt_第2页
制造管理诊断手法与实例.ppt_第3页
制造管理诊断手法与实例.ppt_第4页
制造管理诊断手法与实例.ppt_第5页
已阅读5页,还剩42页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、1,製造管理診斷手法與實例,報告人: 許棟樑 清華大學工業工程與工程管理系,2,Outline,Part I: A Plant diagnostic methodology 1) Crystallize key aspects of concern (認清 改善標的) 2) Diagnostics MTBFT = 12/1. ) as long as in up-time, there is a possibility for failure.,Ret,23,II.2 Improvement Drivers,24,II.3 Best practice comparisons,Process B

2、enching Marking - Excerpt C1 Company Benchmarking Table C2 Company Benchmarking Table C3 Company Benchmarking Table Best-in-class BM Other Detail Index Table,25,II.4) SMT Process reengineering cases,樣本定義 本次選擇了國內前三大筆記型電腦廠商,三家廠商1999年產量占全台灣產量的51%以上,基於保密原則,我們將三家公司定為C1 、C2 、C3,並保留相關機密資料。 在C1-C3中,各參與公司提供一

3、條最具代表性的PCBA生產線為樣本,實地由研究人員到廠 3-5 天,以收集所需的資料。,26,研究流程,27,C1 PCBA layout: IS vs TO-BE,改善後,改善前,Advantages: 1) Keep I/P O/P from same side. 2) Reduce manual cart transp. 3) Fast overhead movements. No traffic congestions.,28,Recommendation for C1 Case,Change layout to continuous U-shaped to connect whole

4、 PCBA area. Remove the board clipping stations. Adding placement machine to increase line balancing rate & reduce pulse rate. Reduce manual assembly and inspection to reduce cycle time. Automate repair data collection and analysis. Automate loading/unloading of ATE stations.,29,C1 AS-IS Simulation,3

5、0,Remove 2 split stations,31,Add Placement machine & adopt U-shape layout,32,C1 Improvement Effects 1/3,33,C1 Improvement Effects 2/3,34,C1 Improvement Effects 3/3,35,C1: IS vs TO-BE (1),Maximization,36,C1: IS vs TO-BE (2),Minimization,37,C3: PCBA layout IS vs To-be,Was,To-be,38,Recommendation for C

6、3 Case (1),Continuous U-shaped layout to connect whole PCBA line. Removing the X-RAY test process. Yield at the station is already very high & it is too slow. Remove the vibration test.Other plant can do without it. High test ratio. Review needs for tests. Introduce AOI.,39,C3 AS-IS Simulation,40,C3

7、 Remove X-ray.Vibration. Use AOI.,41,U-shape Layout,42,C3 Improvement effects (1/3),43,C3 Improvement effects (2/3),44,C3 Improvement effects (3/3),45,C3: IS vs TO-BE (1),Maximization,46,C3: IS vs TO-BE (2),Minimization,47,Conclusions,In-depth reviewed 3 major plants. Co. 51% Taiwan production in 19

8、99. For PCBA line: Established 58 PIs, 8 key PIs New indices: ORT ratios, Layout efficiency, Flow efficiency, Normalized Line Balance rate Located relative strength and weakness for plant improvement oppor. Major recom: reduce mfg segments, continuous U-shape line, reduce non-bottle buffer, Improve LBR, Use automation Used Simulation to verify and debug re-engineered processes. Some plants c

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论