土木工程外文翻译_第1页
土木工程外文翻译_第2页
土木工程外文翻译_第3页
土木工程外文翻译_第4页
土木工程外文翻译_第5页
已阅读5页,还剩8页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、 #大学毕业设计(论文)外文翻译题 目 混凝土结构加固设计 学 院 专 业 班 级 学 号 姓 名 指导教师 2014 年 2 月 28 日Concrete structure reinforcement design Abstract:structure in the long-term natural environment and under the use environments function, its function is weaken inevitably gradually, our structural engineerings duty not just must f

2、inish the building earlier period the project work, but must be able the science appraisal structure damage objective law and the degree, and adopts the effective method guarantee structure the security use, that the structure reinforcement will become an important work. What may foresee will be the

3、 21st century, the human building also by the concrete structure, the steel structure, the bricking-up structure and so on primarily, the present stage I will think us in the structure reinforcement this aspect research should also take this as the main breakthrough direction. Key word: Concrete str

4、ucture reinforcement bricking-up structure reinforcement steel structure reinforcement 1 Concrete structure reinforcement Concrete structures reinforcement divides into the direct reinforcement and reinforces two kinds indirectly, when the design may act according to the actual condition and the ope

5、ration requirements choice being suitable method and the necessary technology. 1.1 the direct reinforcements general method1)Enlarges the section reinforcement law Adds the concretes cast-in-place level in the reinforced concrete member in bending compression zone, may increase the section effective

6、 height, the expansion cross sectional area, thus enhances the component right section anti-curved, the oblique section anti-cuts ability and the section rigidity, plays the reinforcement reinforcement the role.In the suitable muscle scope, the concretes change curved the component right section sup

7、porting capacity increase along with the area of reinforcement and the intensity enhance. In the original component right section ratio of reinforcement not too high situation, increases the main reinforcement area to be possible to propose the plateau component right section anti-curved supporting

8、capacity effectively. Is pulled in the section the area to add the cast-in-place concrete jacket to increase the component section, through new Canada partial and original component joint work, but enhances the component supporting capacity effectively, improvement normal operational performance. En

9、larges the section reinforcement law construction craft simply, compatible, and has the mature design and the construction experience; Is suitable in Liang, the board, the column, the wall and the general structure concretes reinforcement; But scene constructions wet operating time is long, to produ

10、ces has certain influence with the life, and after reinforcing the building clearance has certain reduction. 2) Replacement concretes reinforcement lawThis laws merit with enlarges the method of sections to be close, and after reinforcing, does not affect buildings clearance, but similar existence c

11、onstruction wet operating time long shortcoming; Is suitable somewhat low or has concretes carriers and so on serious defect Liang, column in the compression zone concretes intensity reinforcement. 3) the caking outsourcing section reinforcement lawOutside the Baotou Steel Factory reinforcement is w

12、raps in the section or the steel plate is reinforced components outside, outside the Baotou Steel Factory reinforces reinforced concrete Liang to use the wet outsourcing law generally, namely uses the epoxy resinification to be in the milk and so on methods with to reinforce the section the construc

13、tion commission to cake a whole, after the reinforcement component, because is pulled with the compressed steel cross sectional area large scale enhancement, therefore right section supporting capacity and section rigidity large scale enhancement.This law also said that the wet outside Baotou Steel

14、Factory reinforcement law, the stress is reliable, the construction is simple, the scene work load is small, but is big with the steel quantity, and uses in above not suitably 600C in the non-protections situation the high temperature place; Is suitable does not allow in the use obviously to increas

15、e the original component section size, but requests to sharpen its bearing capacity large scale the concrete structure reinforcement. 4) Sticks the steel reinforcement lawOutside the reinforced concrete member in bending sticks the steel reinforcement is (right section is pulled in the component sup

16、porting capacity insufficient sector area, right section compression zone or oblique section) the superficial glue steel plate, like this may enhance is reinforced components supporting capacity, and constructs conveniently. This law construction is fast, the scene not wet work or only has the plast

17、ering and so on few wet works, to produces is small with the life influence, and after reinforcing, is not remarkable to the original structure outward appearance and the original clearance affects, but the reinforcement effect is decided to a great extent by the gummy craft and the operational leve

18、l; Is suitable in the withstanding static function, and is in the normal humidity environment to bend or the tension member reinforcement.5) Glue fibre reinforcement plastic reinforcement lawOutside pastes the textile fiber reinforcement is pastes with the cementing material the fibre reinforcement

19、compound materials in is reinforced the component to pull the region, causes it with to reinforce the section joint work, achieves sharpens the component bearing capacity the goal. Besides has glues the steel plate similar merit, but also has anticorrosive muddy, bears moistly, does not increase the

20、 self-weight of structure nearly, durably, the maintenance cost low status merit, but needs special fire protection processing, is suitable in each kind of stress nature concrete structure component and the general construction. This laws good and bad points with enlarge the method of sections to be

21、 close; Is suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation. 6) Reeling law This laws good and bad points with enlarge the method of sections to be

22、 close; Is suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation. 7) Fang bolt anchor law This law is suitable in the concretes intensity rank is the C2

23、0C60 concretes load-bearing member transformation, the reinforcement; It is not suitable for already the above structure which and the light quality structure makes decent seriously. 1.2 The indirect reinforcements general method1) Pre-stressed reinforcement law(1)Thepre-stressed horizontal tension

24、bar reinforces concretes member in bending,because the pre-stressed and increases the exterior load the combined action, in the tension bar has the axial tension, this strength eccentric transmits on the component through the pole end anchor (, when tension bar and Liang board bottom surface close f

25、itting, tension bar can look for tune together with component, this fashion has partial pressures to transmit directly for component bottom surface), has the eccentric compression function in the component, this function has overcome the bending moment which outside the part the load produces, reduc

26、ed outside the load effect, thus sharpened components anti-curved ability. At the same time, because the tension bar passes to components pressure function, the component crack development can alleviate, the control, the oblique section anti-to cut the supporting capacity also along with it enhancem

27、ent. As a result of the horizontal lifting stems function, the original components section stress characteristic by received bends turned the eccentric compression, therefore, after the reinforcement, components supporting capacity was mainly decided in bends under the condition the original compone

28、nts supporting capacity 。(2) After the reinforced concrete component uses under the pre-stressed to support the type tension bar reinforcement decides, forms one by to reinforce the component and under supports the compound ultra statically determinate structure system which the type tension bar is

29、composed, under the outside load and the pre-stressed combined action, in the tension bar has the axial force and through (next supports and pole end anchor spot) with components combining site transmits for is reinforced the component, has counter-balanced outside the part the load, changed the ori

30、ginal component section endogenic force characteristic, thus sharpened components bearing capacity. This law can reduce is reinforced components stress level, not only causes the reinforcement effect to be good, moreover can also the great scope enhance the structure overall supporting capacity, but

31、 after reinforcing, has certain influence to the original structure outward appearance; Is suitable as well as is under the high stress, the high strained condition concretes components reinforcement in the great span or the heavy structure reinforcement, but in the non-protections situation, cannot

32、 use in the temperature above 600C in the environment, is also not suitable uses in the concrete shrinkage continuous variation big structure. 2)Increases the supporting reinforcement lawThe addition pivot reinforcement law is through the reduced member in bending effective span, achieves the reduce

33、d function, in is reinforced on the component to carry the effect, raises the structure load bearing level the goal. This law simple reliable, but easy to harm buildings original condition and the use function, possibly and reduces uses the space; Is suitable in the concrete term permission concrete

34、 structure reinforcement. 1.3 Has generally with the concrete structure reinforcement transformation necessary uses technology 1) The request trades the technology It is the joist (either truss) opens the column (or wall), the joist terminal and the joist trades technologies and so on column to call

35、 generally; Belongs to one kind of comprehensive technology, by the related structure reinforcement, the superstructure goes against rises with to reposition as well as abandons technologies and so on component demolition to be composed; Is suitable in had buildings reinforcement transformation; Com

36、pares with the traditional practices, has the construction time to be short, the expense low, affects and so on merits slightly to the life and the production, but is high to the specification, must complete by the skilled worker, can ensure the security. 2)Plants the muscle technology It is one ite

37、m is simple and direct to the concrete structure, the effective connection and the anchor technology; May implant the ordinary steel bar, may also implant the bolt type anchor muscle; Has widely applied in had buildings reinforcement improvement project, for example: In the construction leaks buries

38、 the steel bar or the steel bar deviation designs the position the recovery, the component increases the section reinforcement to make up the muscle, the superstructure expands cross, goes against rises to Liang, columns lengthening by joining, the house superimposed layer terminal and the high-rise

39、 construction addition shearing force wall plants the muscle and so on. 3)Crack patching technology According to the concretes cracks cause, the character and the size, use seal differently protect the method to carry on patching, one kind of skill which causes the structure because to crack reduces

40、 the use function which and the durability can restore; Is suitable in had in the building each kind of crack processing, but to the stress crack, besides patching, still should use the corresponding reinforcement measure. The internal patching law is with the forcing pump the cementing material pre

41、ssure concretes crack, renders the young or up and coming generation to sew up the function, and makes the original structure through its cementation to restore the integrity, this method is suitable for the crack opening is big, and durable and so on is influential to the structure integrity and th

42、e security, or has request and so on waterproof anti-seepage crack patching. 4)Carbonized concretes repair technology It is refers to through restores the concretes the alkalinity (inactivation) or increases its impedance to enable the steel bar corrosion which the carbonization creates to obtain th

43、e containment technology.5)Concretes surface treatment technology It is refers to uses cleaning up concretes surface stains, the oil mark, the residual as well as the other attachment and so on chemistry method, mechanical method, sand blasting method, vacuum cleaning method, injection method skill.

44、 6)Coagulation mantle of soil seal technologyIt is refers to uses flexible methods and so on aquaseal backfill, polymer grouting, paint film to carry on the waterproofing to the concretes, moisture-proof and against crack processing technology. Like the structure, the component shift the technology,

45、 the adjustment structure base frequency technology and so on. 7)Other technologies Like the structure, the component shift the technology, the adjustment structure base frequency technology and so on. 2 Bricking-up structure Bricking-up structure reinforcement method: The bricking-up structures rei

46、nforcement divides into when the direct reinforcement and reinforces two kinds indirectly, the design, may act according to the actual condition and the operation requirements choice being suitable method. 2.1 suitable for the bricking-up structure direct reinforcement method1) outside reinforced co

47、ncrete superimposed layer reinforcement lawThis law belongs to the compound section reinforcement method one kind. Its merit is the construction craft simple, compatible, after the bricking-up reinforcement, the supporting capacity has enhances greatly, and has the mature design and the construction

48、 experience; Is suitable in the column, the belt wall wall reinforcement; Its shortcoming is the scene construction wet operating time is long, to produces has certain influence with the life, and after reinforcing the building clearance has certain reduction. 2) outside reinforced concrete mortar s

49、uperimposed layer reinforcement law This law belongs to the compound section reinforcement method one kind. Its merit and outside the reinforced concrete the superimposed layer reinforcement law is close, but enhances the supporting capacity to be inferior to the former; Is suitable in the bricking-

50、up wall reinforcement, sometimes also uses in outside the reinforced concrete when the superimposed layer reinforcement belt engaged column wall the both sides put on the wall stirrup the seal.3) the addition holds the engaged column reinforcement law This law belongs enlarges the section reinforcem

51、ent method one kind. Its merit the superimposed layer reinforcement law is also close with the reinforced concrete outside, but the supporting capacity enhances limitedly, and difficult to satisfy the earthquake resistance request, generally only in peneseismic country application. 2.2 suitable for

52、the bricking-up structure indirect reinforcement method 1)non-caking outsourcing section reinforcement lawThis law belongs to the traditional reinforcement method, its merit is the construction is simple, the scene work load and the wet work are few, the stress is more reliable; Is suitable in does

53、not allow to increase the original component section size, actually requests to enhance the section supporting capacity large scale the bricking-up columns reinforcement; Its shortcoming is high for the reinforcement expense, and must use the similar steel structure the protective measure. 2) pre-st

54、ressed stay rod reinforcement law This law can the great scope sharpen the bricking-up columns bearing capacity, and the reinforcement effect is reliable; Is suitable processes the high stress, the high strained condition bricking-up structure reinforcement in the reinforcement; Its shortcoming cann

55、ot use in the temperature in the 600C above environment. 2.3 bricking-up structure constructivity reinforcement and patching1) addition grid reinforcement When the grid establishment does not meet the present design code requirement, either the vertical cross wall interface point nips rubs has the o

56、bvious flaw, when either the house integrity is bad, should additionally build the grid to carry on the reinforcement 2)additionally builds the Liang pad reinforcement When under the summer beam the brick setting the wall presents by under the partial squash or the summer beam the partial vertical s

57、plit, should additionally build Liang the pad to carry on the reinforcement. 3)the bricking-up opens partially builds When house partial breakage but after investigating thoroughly its breakage reason when not yet affects load-bearing and the security, may burst the wall partial demolition, and acco

58、rding to enhances the mortar strength first-level to fill in with the full sized brick builds. 4)bricking-up crack patching Before carrying on crack patching, should act according to bricking-up components stressful condition and crack factors and so on characteristic, determined that creates the bricking-up crack the reason, with the aim of carrying on crack patching target-oriented or using the corresponding reinforcement measure

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论