版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、封装考核评估资料Package Qualification Data编号No:CSR-CM017(PKG-21-1037F)页次Page:27 / 27版次Revision:A发行日期Issuing Date版本号Revision修改事项ProceedingA首版发行 First version issue1、 Purpose目的This document provides templates for recording package qualification data for RFMD product and instructions for complying with Materia
2、ls Declaration.提供记录RFMD产品考核认证所需信息资料的模板,及遵从物质申明的说明2、 Scope范围Apply to RFMD package qualification适用于RFMD考核认证产品3、 Instruction说明3.1 Materials Declaration: The Subcontractor Assembly house is required to submit Materials Declaration forms listing the required banned, banned with acceptable threshold level
3、, reportable or other materials required by RFMD QAL-21-1028 for assemblies manufactured for RFMD. These are required for current and new assemblies and must be updated whenever material changes occur or whenever a new substrate process development or assembly qualification begins. The supplier will
4、 be required to provide proof of compliancy with a chemical analysis. See QAL-21-1028 for details on requirements, reporting structure, and reporting format.物质申明: 外包封装厂需要提交物质声明书,列明禁用材料,禁用但可接受门限的材料、需告知的或其他由RFMD QAL-21-1028文件规定的用于RFMD封装制造产品的材料. 这些规定适用于现有及未来新的封装产品,当材料变更,新基板工艺流程的开发或开始封装考核认证时都要提交该声明书. 供应
5、商还需要提供化学分析作为依据. 参考QAL-21-1028文件中的详细要求,报告的结构和格式。3.2 Add lines, insert tables, embed objects at each applicable process step to capture pertinent process data.各工序可根据需收集的相关信息资料增加表格的行数, 插入新的表格和对象3.3 Compress pictures once all applicable process information has been inserted. Go to view toolbars, select
6、pictures. Go to pictures toolbar and compress pictures, OK.完成相应的所有工序的信息资料后压缩图片. 在视图工具栏中选择图片后压缩或在图片工具栏栏中压缩图片4、 Reference参考CSR-CM012(PKG-21-1013) Subcontractor Assembly Specification for ModulesCSR-CM029(QAL-21-1028) Banned Substances List and RFMD Green Definition5、 Qualification Data考核评估资料拟制:审核:批准:Q
7、ualification DataPart Number Qual Lot NumberTrace CodePackage TypePackage Size ThicknessWafer Size Thickness (list all die)Lead CountPO NumberMSL Target LevelAssembly LocationBonding Diagram Part NumberBOM Part NumberBranding Diagram Part NumberPrepared ByExecutive SummaryYield SummaryLot #1 Lot #2
8、Lot #3 Total YieldSMT YieldLot #1 Lot #2 Lot #3 Total YieldAssy YieldLot #1 Lot #2 Lot #3 Total YieldFinal YieldData Summary All Lots combined ProcessTestCriteriaSSMaxMinAvgStdCpkSMTPaste ThicknessSMTComponent Shear (gram force per each SMD size)SMTFlux ThicknessDie AttachPlacement XDie AttachPlacem
9、ent YDie AttachShear (each die)Die AttachRotation Flip Chip AttachShear (each die size)Flip Chip AttachPlacementFlip Chip AttachStand offWire BondPulls Die to SubWire BondPulls Die to DieWire BondPulls Sub to SubWire BondPulls RSSBWire BondLoop HeightWire BondSpanWire BondPlacement XWire BondPlaceme
10、nt YWire BondBall Shear 71um BPOWire BondBall Shear 60 52 71um BPOWire BondSSB Shear 60 52 71um Pad Opening, (repeat for lot 2 and 3) 1 2 3 4 5 6 7 8 9 10 Min Max Avg D1D2D3D4D5Ball Shear, Measure 10 balls 60um 52um 71um Pad Opening, (repeat for lot 2 and 3) 1 2 3 4 5 6 7 8 9 10 Min Max Avg D1D2D3D4
11、D5Stitch Stud Bump (SSB) Shear, Measure 10 balls 60um 52um 52um 65um =80um Pad Opening, Minimum 10 units (repeat for lot 2 and 3) 1 2 3 4 5 6 7 8 9 10 Min Max Avg D1D2D3D4D5Plasma or UV (Use if Applicable)Make and Model numberPowerTimeGas MixtureLid Attach B-stage or Solder (if applicable)Make and M
12、odel numberCure TimeCure Temperature & Tolerance Transfer SpeedStage 1 Start Position mm/s Stage 1 Start Position mm/s Mold Cure TimeFlange Packages (if applicable)Post Flange Flatness Measurement Data per ten flanges Measure five locations per flange, center and four corners.Flange Flatness, (repea
13、t for lot 2 and 3) 1 2 3 4 5 Min Max Avg F1F2F3F4F5F6F7F8F9F10MoldMake and Model of machine:Mold Compound Transfer Program:Position of plunger at start (mm Pellet Height, PS (PS = Position Start):mm: Speed of plunger (mm/sec from start to next position, PS to P1):mm/sec:Position of plunger for next
14、position (mm P1):mm: Speed of plunger (mm/sec from P1 to P2):mm/sec:Position of plunger for next position (mm P2):mm: Speed of plunger (mm/sec from P2 to P3):mm/sec:Position of plunger for next position (mm P3):mm: Speed of plunger (mm/sec from P3 to P4):mm/sec:Position of plunger at final end position (PE = Position End):mm:*Cull Height setting & actual mm (actual is measured with micrometer):mm:mm:Positive cull value (distance above bottom mold die):mm:Transfer Pressure setting & actual PSI:PSI Setting: PSI Actual:Transfer Time (time from PS to PE):Sec:*Mold Temperature setting & range (Ma
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026四川凉山州布拖县总工会招聘工会社会工作者1名笔试备考题库及答案详解
- 2026江苏连云港长寿康复医院招聘5人笔试模拟试题及答案详解
- 2026年鹤壁浚县消防救援大队招聘专职消防员10名笔试备考题库及答案详解
- 2026年福建省泉州公费师范生专项招聘编内教师211人笔试模拟试题及答案详解
- 2026中化学西南工程科技有限公司招聘14人笔试参考题库及答案详解
- 2026江铜香港公司第二批校园招聘6人笔试备考试题及答案详解
- 信银理财有限责任公司2027届校园招聘暑期实习招聘笔试备考试题及答案详解
- 东北证券2027届暑期实习暨校园招聘笔试备考试题及答案详解
- 2026重庆市万州区第一人民医院招聘笔试备考试题及答案详解
- 2026湖南益阳市赫山区发展集团有限公司招聘补充笔试参考题库及答案详解
- 井控安全考试题库及答案
- 术中气道压增高的处理流程
- GB/T 12135-2025气瓶检验机构技术条件
- 山东省泰安市东平县2024-2025学年(五四学制)八年级下学期期末考试数学试卷(含答案)
- 2025浙江绍兴新昌中学自主招生数学试卷试题(含答案详解)
- 2026年高考语文备考之统编版教材全5册作文素材分类梳理
- DB45∕T 2479-2022 一般固体废物填埋场水文地质工程地质勘察规范
- 超声科疑难案例讨论
- 陪诊师培训课件
- 自己是健康的第一责任人
- 《课程与教学论》期末考试题
评论
0/150
提交评论