下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、The construction contract of special boothContract Number: Place: Shanghai Pudong New AreaDate: April 2, 2015Party A: (hereinafter referred to as Party A)Contact:Tel:Fax:Cell phone:Party B: (hereinafter referred to as Party B)Contact:Tel:Fax:Cell phone:Accordance with the Peoples Republic of China C
2、ontract Law and the relevant laws and regulations, combined with construction features of special booth, both parties based in equality, voluntariness, consensus, for the 2015, the Shanghai New International Expo Center - (- -) which the special booth planning, production, stand construction, decora
3、tion, stand dismantling works and services etc. reached the following agreements:I. Project OverviewProject Name:Project time:Location:Project Area: Project Progress:Party B shall begin stand construction work at 13:00 on June 25, 2015;Party B shall complete the stand construction work on June 27, 2
4、015;Party B shall be responsible for dismantling work after the show closing on June 30, 2015 .II. Cost of the project:The total construction cost of the contracted project (including tax): (RMB );Notes: 1, charged exhibition space (Raw) management fee will be paid by the Party B, and the total cost
5、 above shall contain such fee.2, the electric box application and usage fees will be paid by the Party B, and the total cost above shall contain such fees.III. The project funds and payment date:Party A within three working days from signing the contract date shall pay the 70% contracted total cost
6、(RMB ) as advance payment. When Party A accept the finished booth constructed by Party B, Party A will pay for the remaining 30% balance (RMB ) to Party B be in cash or bank transfer. After Party B receiving the balance, the full invoice shall be delivered to the Party A.Party B has the right to ref
7、use to start the construction before receiving the prepayment.IV. The liability of Party A and Party BParty As responsibilities:1) fully pay to Party B on schedule;2) to provide standard files including LOGO vector files, pictures, inkjet and other image files (for AI format, vector file or other av
8、ailable formats) within the specified time.3) assist the Party B related coordination. (Eg: raw space management fee, apply and pay the electric box etc.)4) when stand construction completed, Party A shall cooperate with Party B to check and accept it and any doubt should be noted on the spot, or it
9、 will be considered acceptable.5) from the booth setup to move-out, any damages of venues, space, facilities (such as electrical boxes, stadium floor, etc.) caused by Party A which shall take in charge of the compensation in accordance with the provisions of venues.6) shall go to the factory of Part
10、y B to check booth producing progress and quality.Party Bs responsibilities:1) party b is responsible for the preliminary design, factory production, the production of art (not including photo, prints and other graphic image design), material transportation, field construction, electrical installati
11、on and exhibition move-in;2) to ensure the safety of the construction, security problems in the process of construction, or any improper construction safety problems should be undertaken by party b;3) the booth maintenance and cleaning work during the show;4) to ensure the engineering quality and en
12、gineering construction progress, if construction delay caused by party b, the overtime expenses shall be borne by party b and construction will be subject to confirmed by the party as renderings. Renderings and quotation are attached.5) from the booth setup to move-out, any damages of venues, space,
13、 facilities (such as electrical boxes, stadium floor, etc.) caused by Party B which shall take in charge of the compensation in accordance with the provisions of venues.V. design changeDuring the period of construction, the design change will be processed in the following way:The written file of the
14、 change of original design should be send to Party B at least 15 days before booth settlement.Regarding the change, both parties should negotiate and carry on the construction plan by the written final design, otherwise party B shall have the right to refuse to change.As a result of the change, the
15、added expenditure and the already cost according to the original design scheme shall be borne by party A.VI. Negotiation for increasing the workIf party A request to increase quantity of work during engineering construction, the two sides can negotiate and sign “project negotiation records”. After s
16、igned by both sides responsible persons of the engineering, party A needs to pay the increased cost to party B then the added work can be incorporated into this contract and constructed at the same time.VII. Problem solvingWhen there is a dispute between both parties, the specific project problems c
17、an be amicably settled through negotiation by both parties. If such negotiations fail, can sue to this contract signed place Shanghai pudong new area peoples court for disputes resolution.1. After signing the contract, in addition to legal irresistible factors such as natural disasters, earthquakes,
18、 war, any party has no right to unilaterally terminate this contract, if any party cancel the contract unilaterally, it should compensate for the other party for 30% of the total contracted money.2. Due to party A or party B violates other clauses in the contract or other agreement, it shall born the corresponding legal responsibility and the related economic losses for the other party.VIII. The contract comes into force and termination1. Come into force as of the date of signing the contract;2. After party B finishing the en
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 氧化铝制取工9S执行考核试卷含答案
- 合金半成品加工工冲突管理测试考核试卷含答案
- 2026银行寿险面试题库及答案
- 2026应急电话面试题目及答案
- 2026城市空间面试题目及答案
- 2026初级ui面试题及答案
- 2026创新课程面试题及答案
- (2026年)防校园欺凌活动总结
- 医院副院长述职报告范文
- 静乐县2025-2026学年数学三年级下学期期中统考试题(含解析)
- 2026秋小学统编版语文四年级上册期中学情测试练习卷含答案三套
- 儿童青少年非霍奇金淋巴瘤诊治专家共识(2026版)
- 胸腺瘤合并重症肌无力围手术期护理
- 2026年山东重工集团招聘试题及答案
- 2026秋小学教科版科学四年级上册第一单元测试练习卷及参考答案
- MRI检查患者安全防护及图像分析指南(2025版)
- 2026年广西农信笔试模拟题及答案详解
- (全套表格可用)SL631-2025年水利水电工程单元工程施工质量检验表与验收表
- 社会认知与评价方法课件
- 第三课第一框伟大的改革开放
- 岩土工程勘察野外岩土描述
评论
0/150
提交评论