




已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Control Systems Guide for Interface between Control Systems and Electrical Table of Contents Purpose Established Interfaces References Attachments 1. Purpose This guide is intended to give a description how to organize the interface with the Electrical group on projects. This guide shall be read with reference 3.1. 2. Established Interfaces A list detailing interfaces is Attachment 2. 2.1 Power Supplies The following information and requirements shall be communicated to the Electrical group: voltage and type of power supply required e.g. D. C., single or three-phase AC; number of circuits required (including spare capacity); uninterruptable; normal/alternate mains etc.; length of time that the supply is required in the event of a failure mains; duration of changeover from mains to standby ( e. g. 50 m. s. ) ; voltage regulation and tolerance; distribution boards requirements (presentation in the form of a “key-one line” diagram is preferred); required power in watts; allowable voltage drop; type of protection (fuse, automatic breaker etc.). 2.2 Alarm Systems Full details of alarm may be provided on a form as shown on Attachment 1. 2.3 Measurement Systems Details required may be provided by using the form as shown on Attachment 1. Measurements shall preferably be presented by the Electrical group as isolated analogue signals of 4-20 mA. 2.4 Electric Control Systems All process signals shall be routed into the instrumentation system (also those with no instrumentation involvement) and then those signals for electrical control passed on to the Motor Control Center. Detailed information could be provided on a form as shown on Attachment 1. 2.5 Control and Interface Panels Interposing cabinets can be located in instrument rooms or electrical rooms depending on project/client requirements.If mounted in electrical rooms the Electrical group is responsible for design and requisitioning. If mounted in instrument rooms the Control Systems group is responsible for design and requisitioning. If no interposing cabinet is used and instrument cables are routed into motor control cabinets (e.g. for start/stop) provisions should be provided inside these cabinets for mounting these cables. 2.6 Communication Systems Where free-issue telephone handsets, radio microphone/loudspeakers closed circuit T.V. system etc. are to be incorporated in panels or desks details and space requirements are to be obtained from the Electrical group. 2.7 Cable Routing A study drawing shall be prepared by each group clearly indicating the following: trench routes, including termination points of runs, space requirements including spare capacity, minimum installation depth; road crossings where applicable; segregation required between instrument cables and between instrument and electrical cables; details of any instrument cables to be routed in electrical cable trenches; fireproofing requirements where applicable. Close coordination between the groups is mandatory to avoid duplication and to come to a sound design. Coordination with the Under Ground group for trenches and crossings will be done by the Electrical group. 2.8 Earthing A philosophy drawing shall be prepared indicating: method of termination; application of chokes; earth electrode resistance requirement for each system; segregation between systems where applicable; earthing of field instruments; earthing systems in control rooms and equipment rooms. 3. References 3.1 Document Number Title Level BN-EP-304 Procedure for Work Division between Control 3 Systems and Electrical Groups 3 4. Attachments 1. Electrical Control, Alarm and Measurement Function Requirements. 2. CHECKLIST Internal Procedure Control Systems/Electrical This list will be helpful when discussing and agreeing split of work and responsibility as a unique job procedure between the Electrical and the Control Systems Design Section. Job No Client . Date . 1. Is pump start/stop for level control without alarm completed by Electrical or via interposing by Contol Systems Group? 2 Is pump start/stop (HT and LT) by open or close contact? 3 Are compressors (for safety reasons) without local start? 4 Is type of local switches and ordering coordinated? 5 Are there running lights, not shown on EFD, located on instrument panel? 6 Are there alarms for transformers, H and V, fire, etc., on instrument panel? 7 Is there any fire proved cable or trunk? 8 Is there any cable routing electrical and instrumentation together? 9 Is cable ordering for power supply and above 1 mm2 by Electrical? 10 Is there telephone cable in instrument trench? 11 Are there temperature signals for winding and bearing of electric motors? (intrinsically safe) 12 Are there mA signals for electric heater, speed control, or metering? 13 Is power supply for tank level (Enraf) inclusive distribution, up to instrument, completed by Electrical? 14 Is there lighting above local panels required? 15 Agree grounding points, is there a clean earth required? 16 Is location of instruments and equipment to be determined for grounding by Electrical? 17 Are there instrumentation details for electrical heat tracing, necessary? 18 Is there electrical power (see also 13) for local analyzers or other instruments? Are local distribution boards required? 19 Are there electric space heaters in local panels? 20 Agree estimate loads for instrument power consuming, type of power and is a key-line helpful? 21 Is there telecommuncation, via instrument cable wire, with plug-in desk, microphone of sound power in instrument panel? 22 Are there graphics, Amp. meters for electrical or TV screens, in instrument panel? 23 Is location of trunk, junction boxes, switches and local panels on columns determined? 24 Who is ordering, cable protection tiles and trench markers? 25 Is cable-pulling contract by Electrical, inclusive cable markers and end protection cover? 26 Is split of responsibility agreed for motor operated valves (MOV)? 27 Is lighting of level gauges and sufficient room (nozzle standout) determined? 28 Is coordin
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年美妆行业个性化定制服务模式的消费者需求演变报告
- 2025年公文处理实践模拟试题及答案
- 2025年工业互联网平台传感器网络自组网技术在智能工厂生产自动化中的应用报告
- 年产2GWN型高效光伏电池片生产项目实施方案(范文)
- 2025年公关学新趋势试题及答案
- 行政管理人才培养的趋势试题及答案
- 2025年工程管理合作策略试题及答案
- 经济法考点回顾及试题试题及答案
- 安徽2025年安徽省农业科学院引进31名高层次人才笔试历年参考题库附带答案详解
- 湖北xx新建光伏发电项目实施方案
- 2024中考模拟题历史历史(贵州贵阳卷)(考试版A3)
- 2025公务员考试题库及答案
- 2024年宿迁市融媒体中心招聘考试真题
- 《业绩分析报告实例》课件
- 2024电气工程师考试练习题分享试题及答案
- 统编版(2024)七年级下册道德与法治期中测试卷(含答案)
- 财务会计考试试题及答案
- 县某中学体育场项目可行性研究报告
- 2025江苏南京大数据集团有限公司招聘45人笔试参考题库附带答案详解
- 架桥机安拆安全监理细则
- 无人机测量课件
评论
0/150
提交评论