TimeStudy教程.doc_第1页
TimeStudy教程.doc_第2页
TimeStudy教程.doc_第3页
TimeStudy教程.doc_第4页
TimeStudy教程.doc_第5页
已阅读5页,还剩7页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

MICHELINReference : REF_002_MMWEdition Date: 28 June 2005Page: 12/12Entity: DPI Author : B. METRAS DPI/EMIValidated : P.GAIGNEUX DPI/EMIClassification: D3Organisation & Progress Referential“Determination of Unit Times”.AIMThis referential describes the methods and tools to be implemented for establishing unit times. AREA OF APPLICATIONThis referential is to be applied by 01/09/2005 at the latest in all the industrial entities in the Group. The users of the referential are the members of the Organisation and Progress mtier who have been validated for the post of Study Organiser. DEFINITIONS Unit Time :This is the time it takes a capable and trained operator to complete a Unit of Production (U.P) or a Unit of Work in determined conditions, using the method, machines and equipment provided.You will find an example of a Unit Time sheet at the end of this document. Chronomtrage (Time-study):Time-study is the operation which consists in: Checking that the Method of Work is correctly applied. Assessing and recording the working rate of the operator observed. Measuring and recording times.You will find an example of a time recording sheet at the end of this document. Work Element :This is a portion of work demarcated by two measurement references and consisting of an ordered sequence of defined actions of a homogeneous nature. Concept of rate :An operators working rate is his instantaneous speed of execution of a useful piece of work when this speed is dependent solely on the operators working rhythm. This rate or speed takes account of the execution conditions (difficulty, precision, ergonomics, etc.). Rating :This is the operation by which a qualified organiser assesses the working rate of an operator in relation to his mental image of a rate of 100. Reference rate :The reference rate is known as “Rate 100”.This is the working rate which any average operator, capable, trained and qualified to occupy the post, can maintain constantly throughout his working time at the post (generally an 8 hour shift), without damaging his health. This rate is calibrated on the pre-determined time standards (M.T.M.). Technological times (Tt) :These are elements the duration of which depends only on technological constraints independent of the operator. The operator can only respect these constraints or suffer them. Manual or human times (Tm) :These are elements the duration of which depends only on the operators action. This operation may be performed using an inert means. Techno-manual or techno-human times (Ttm) :These are elements of intermediate nature, i.e. the duration of which depends both on the operators action and on technological constraints which are combined with it. Linked irregular (Unavoidable Anomaly) :This is an event with a random frequency of occurrence, linked directly to a work element planned in the method of work (manual or techno-manual).The irregular has a direct impact on the duration of the work element (e.g. slippage of the roller when joining a laize on a finishing post, re-opening of a bandage bead on a before-cure verification post following its unexpected closure). INSTRUCTIONPrecondition : The determination of work element times must be done on an optimised method of work, that is, within the context of a post study after the analysis and critique stages. The unit of time used for the determination of work elements is : The Cmn (hundredth of a minute) for time-study. The TMU (time measurement unit) for the predetermined time methods (M.O.S.T. or M.T.M.).1 TMU = 1/100,000th of an hour. Unit times are expressed in Cmn (Hundredths of a minute). The different methods of time determination (Tm and Ttm) :Two methods can be used for determining times :1. Predetermined time methods, M.T.M. or M.O.S.T.2. Time-study.Choice of method :See flowchart below. M.O.S.T: M.O.S.T.MaynardOperationsSequenceTechniqueM.O.S.T. is a technique for the analysis and measurement of work, based on a system of sequences of predetermined movements. Example of sequence (Basic MOST) : A6 B6 G1 A1 B0 P3 A0 = 17*10 = 170 TMU- There are different versions of MOST in use within the company (Mini or Basic) which will be employed according to a number of criteria represented in the flowchart below : Precision :M.O.S.T. guarantees a level of precision of 5%and 95% confidence for unit times.Interest of MOST : Speed of establishment of elementary times : Basic MOST is 40 times quicker than MTM1, Mini MOST is 14 times quicker than MTM1, Mini and Basic MOST are 2.5 times quicker than Time-study. MOST is very efficient in optimisation phases (analysis and critique made easier). MOST favours uniformity of the results obtained. MOST is easy to explain and understand (common language for operators, supervisors and organisers). This method enables the operators to be more involved in the improvement of their methods of work. The tables of predetermined times correspond to a rate of 100. There is no need for rating. Possibility of estimating times in advance (simulation). Easier in the updating phases. Less laborious technique than time-study and more rewarding for organisers. Less restricting for operators. Disadvantage: More difficult to identify and put a value on irregulars compared with Time-study. Potentially, less organiser presence on the ground.Time-study :Implementation of time-study involves breaking down the method of work into work elements. Regular cyclePhaseWork Element Work Element (E.d.T.) : This is a portion of work demarcated by two measurement references and consisting of an ordered sequence of defined actions of a homogeneous nature. This is the smallest portion of work we analyse. Phase: This is a defined set of work elements. N.B. The breakdown into phases is optional ; it depends on the cycle duration. Regular cycle : This is a set of phases, and consequently work elements, which recur in a determined order when each Production Unit (U.P.) or Unit of Work is being executed. Minimum precision required :The time-study method proposed was developed by the PE3/ET department (M. Serge LAROUX). The document describing the statistical method can be obtained from the O&P school. Case 1 : E.d.T. with a frequency of 1 per Unit of Production at the post.These elements will enable us to define the duration of the minimum period of the simogram. Example : join a laize to produce a roll.See flowchart below : The time adopted is called the elementary time or ET.The normality test and the precision calculation take place using the form referred to at the end of the document. Case 2 : E.d.T. with a frequency of 1 per Unit of Production at the post.These elements will enable us to define the duration of the maximum period of the simogram. Example : evacuation of a pallet of rolls from a cutter.See flowchart below :The time adopted is called the elementary time or ET.The normality test and the precision calculation take place using the form referred to at the end of the document. Case 3 : Activities outside Production Unit (e.g. start and end of shift, safety instructions).See flowchart below :The time adopted is called the elementary time or ET.The precision calculation is done using the form referred to at the end of the document.Compliance with the proposed method guarantees a level of precision of 5%and 95% confidence for unit times.Implementation of the normality test according to the SHAPIRO-WILK method involves the installation of the BUS application under Excel. You must submit a request to your RUL who will give you installation rights. Rating :Validation criterion for rating : the organiser must demonstrate that he has the ability to practise rating. He is qualified in this practice when he is considered stable on the criteria of “Mean deviation” (tolerance of 3%) and “Standard deviation” (tolerance = 5.5). This stabilisation is monitored using the form referred to at the end of the document. After stabilisation, he must carry out a minimum of 6 exercises of 15 sequences per quarter, i.e. 24 exercises a year. Maintained qualification in rating is one of the essentials of the Mtier Guarantee and is the responsibility of the ROPs in the sites. Technological times :The determination of technological times is based on : Measured times, analysed using the form (identical to the one used for time-study) referred to at the end of the document and in accordance with the precision rules explained in the “Time-study” section. Times calculated by a technical or methods group (for example, of the speed type in preparation or dependent on advance and speed for machining time). Times coming from control systems which will be analysed manually so as to identify the unforeseen elements. Technological times must be standardised and maintained long-term in all cases. This responsibility lies with the Organiser. Linked Irregular times (Unavoidable Anomalies) :The determination of Linked Irregular times is based on : MOST analysis if the nature of the anomaly permits (e.g. eliminate defects from a laize). Times measured when taking time readings. The frequency of occurrence of the anomaly, determined from the data collected during the time-study session or by continuous observation.The unit time sheet :It must be totally consistent with the chronology of operations coming from the simogram.It is an essential component of the study dossier.It is the base document for measuring the activity of people and machine loads.It must show :Identification of the production workshop.Identification of the work postIdentification of the organiser.Identification of the production unit.Page numbering and date of execution.Simogram references.Numbers of the elements of the simogram (consistent with the numbers used in time-study sessions or by the predetermined time methods).Descriptions of the elements of the simogram (consistent with the descriptions used in time-study sessions or by the predetermined time methods).Frequencies of occurrence of the elements of the simogram (the frequency calculation will be noted as an appendix to the Unit Time sheet).Elementary times of technological work elements.Elementary times of manual and techno-manual work elements. Calculation of unit times of work elements (E.T. * Frequency).Identification of manual and techno-manual work elements masked by a technological time.Identification of technological times masked by manual or techno-manual work elements.Calculation of the sum of technological times.Calculation of the sum of manual and techno-manual Times.Calculation of the sum of determinant Times (manual and techno-manual).Calculation of unit Time (Tt + Tm determinant + Ttm determinant) Calculation of the % occupation of the operator (Sum of Tm and Ttm / Unit time)Identification of the units produced Item and

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论