



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
培养高素质的人才协调控制系统安全合理状态下进行运转工作由于电气自动化控制量相比热工控制量,其操作运行时与控制的要求中有诸多不同。对于相对热机设,电气自动化控制系统控制的信息采集对象较少、数量较小、操作频率低,但是要求快速和准确。电气设备的保护自动装置需要较高的可靠性,动作速度快。而且需要较高的对抗干扰性。电气自动化控制系统以顺序控制和数据采集系统为主,相对联锁保护多。所以机组电气系统归入DCS控制,需要控制系统具备较高可靠性。除了实现正常的起停与运行操作,更重要的是能够做到实时检测和显示运行状态异常及事故状态下的状态及数据,而且提供相对应的操作指导以及应急处理的措旋方法,以保证电气自动化控制系统能够自动挖制在安全合理状态下进行运转工作。Since the electrical automation control compared to the amount of thermal control, its operation and control requirements are different. Relative to the engine, electrical automation and control information collection object system control less, small quantity, low operating frequency, but requires fast and accurate. Reliability requires higher protection of electrical equipment automatic device, fast action. And the interference of the higher. Electrical automation control system based on the sequential control and data acquisition system, the relative interlock protection. In the DCS control so the unit electric system, control system with high reliability. In addition to the normal starting and stopping and operation, more important is to be able to do real-time detection and display the running state of abnormal and accident conditions and data, and provide corresponding operational guidance and measures for emergency treatment, in order to ensure the electrical automation control system can automatically dig for work in safe and reasonable state.3 控制系统的自动化控制方式Automated control of 3 control system3.1集中监控3.1 centralized monitoring集中监控方式主要出在于运行维护便捷,系统设计容易,控制站的防护要求不高。但是基于此方法的特点是将系统各个功能集中到一个处理器进行处理,处理任务繁重致使处理速度受到影响。此外电气设备全部进入监控,会随着监控对象的大量增加导致主机冗余的下降,电缆树立增加,成本加大,长距离电缆引入的干扰也会影响到系统的呵靠性。同时,隔离刀闸的操作闭锁和断路器的联锁采用硬接线,凶为隔离刀闸的辅助接点经常不到位,造成设备无法操作,这种接线的二次接线复杂,查线不方便,增加了维护量,并存在因为查线或传动过程中由于接线复杂造成误操作的可能。Centralized monitoring mode mainly lies in the operation and maintenance convenience, easy to control system design, the protection requirements is not high. But the characteristics of this method is based on the system each function to a processor for processing, processing tasks that processing speed affected. In addition, electrical equipment, full access control, with a large increase in monitoring object leads to a decrease in host redundancy, cable set increases, cost increase, long interference cable distance will also affect the reliability of the system. At the same time, interlock operating atresia and disconnecting switch by hard wiring, fierce as auxiliary contact isolation knife brake are often not in place, resulting in equipment is not operating, secondary wiring of two this wiring complex, check the line is not convenient, increases the amount of maintenance, and because the search line or transmission process due to wiring complex misoperation may.3.2现场总线监控The 3.2 field bus control当前智能化电气设备有了较快的发展,计算机网络技术已经普遍应用在变电站综合自动化系统中,我们也积累了丰富的运行经验。这些都为网络控制系统应用于电力企业电气系统奠定了良好的基础。现场总线监控使得系统设计更有针对性,对于不同的间隔可以拥有不同的功能,可以根据实际的间隔情况进行设计,也具备远程监控方式的全部优点。此外,采用这种方式还可减少大量的隔离设备、端于柜、IO卡件、模拟量变送器等,而且设备就地安装,与监控系统通过通信线连接,可以节省大量控制电缆,降低成本和安装维护工作量。另外,各装置的功能相对独立并通过网络连接,网络组态灵活,是整个系统的可靠性大大提高,任何装置故障仅影响相应的原件,不会导致整个系统瘫痪。所以,现场总线监控方式将成为供电企业计算机监控系统的发展方向。The current electrical equipment intelligent has been rapid development, the computer network technology has been widely applied in the substation automation system, we have accumulated rich running experience. These are for network control system applied in the electrical system of electric power enterprises laid a good foundation. The field bus control system makes the design more targeted, for different intervals may have different functions, can be designed according to the actual interval, also has all the advantages of remote monitoring mode. In addition, this way can reduce the isolation equipment, large end in the cabinet, I / O card, the analog transmitter, and the equipment installed, connected with the monitoring system by the communication line, can save a lot of control cable, reduce the cost of maintenance and installation. In addition, the device function is relatively independent and connected through the network, the network configuration flexibility, reliability of the whole system is greatly improved, any device fault affects only the original, will not lead to paralysis of the entire system. So, the way the field bus control will become the development direction of computer monitoring and control system for power supply enterprises.3.3远程监控3.3 remote monitoring远程方式具有节约材料(如电缆的量等)、节省安装费用、可靠性高、组态灵活等优点,但由于各种现场总线(如Lonworks线、CAN总线等)的通讯速度不够高,而电厂等电气部分通讯量相对比较大,所以这种方式适合于小系统监控,而不适用于大范围的电气自动化系统的构建。Remote mode has the advantages of saving materials (such as cable volume), saving installation cost, high reliability, flexible configuration, but because of various kinds of field bus (such as Lonworks line, CAN bus) communication speed is not high enough, and the power plant electrical communication amount is relatively large, so this way suitable for small system monitoring building automation system, and is not suitable for a wide range of.4 基于电气自动化控制系统的应用4 Application of electrical automation control system based on目前电气自动化控制系统的应用相当广泛,以电力系统为例,下文简述主要包括的几个内容:The current widely used electrical automation control system, the power system for example, the content mainly includes the following several:(1)计算机处理系统和数据采集。其主要功能包括参数输入、参数显示、性能计算、报表打印、异常报警、事故序列记录、历史数据追忆等。(1) the computer processing system and data acquisition. Its main functions include parameter input, parameter display, performance calculation, report print, abnormal alarm, accident sequence records, historical data memory.(2)汽机电液调节系统。我国早期汽机控制使用液压控制系统,到了20世纪80年代,因为控制设备、电气元件以及电液转换器可靠性的提升,而且使用高压抗燃油伺服机构,使得电调系统较多的为汽机配套,从而实现转速、电功率、调节级后压力三个回路控制,接应力启动功能和阀门管理。控制汽轮发电机组由盘车开始,依次冲转,暖机,升速,阀切换并网,带初负荷,加负荷,直到正常运行。参加电网的一次调频及接受电嘲的调度来改变负荷。不但保证机组安全,并且达到了在运行状态变化中,尽量延长机组寿命,以及稳态运行过程中尽量提高机组的经济性。(2) steam turbine electro-hydraulic control system. The use of hydraulic control system of steam turbine for early control of our country, in the nineteen eighties, because the control equipment, electrical components and improve the reliability of electro-hydraulic converter, and the use of high pressure oil servo mechanism, the electrical control system for steam turbine are matched, so as to realize the speed, power, pressure after regulating stage three loop control, stress start function and valve management. Control of turbo-generator by turning, turn turn, warm machine, speed, valve switching network, with initial load, load, until the normal operation. A FM in grid and scheduling for electric to change the load. Not only to ensure the safe operation, and achieved in a running state changes, try to extend service life, try to improve the units economy as well as during steady-state operation.(3)汽机旁路系统。旁路控制系统的组成包括高1氐压旁路压力调节和高,1氏压旁路温度调节系统,旁路阀门执行器可以依据系统对运作时候力矩及速度的要求来选择电动或是电液执行器。(3) the turbine bypass system. Bypass control system consists of high / 1 Di pressure bypass pressure regulating and high pressure bypass control system, temperature 1, can choose the electric or electro-hydraulic actuator requirements of torque and speed operation
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 ISO/IEC 11770-3:2021/Amd 1:2025 EN Information security - Key management - Part 3: Mechanisms using asymmetric techniques - Amendment 1: TFNS identity-based key agreement
- 【正版授权】 IEC 61000-6-2:2005 EN-D Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity for industrial environments
- 校园应急知识培训课件简报
- 造价方面考试试题及答案
- 浙江杭州面试题及答案
- 回乡创业考试题库及答案
- 语文开卷考试试题及答案
- 校园安全知识培训心得
- 粤电集团入职考试试题及答案
- 行政人员考试试题及答案
- 2025年江苏省苏豪控股集团有限公司校园招聘笔试备考试题及答案详解(必刷)
- (完整)中小学“学宪法、讲宪法”知识竞赛题库及答案
- 2025年行政执法人员执法证考试必考多选题库及答案(共300题)
- 垃圾分类巡检督导方案
- 乳制品配送服务应急处理方案
- 公司收款授权委托书标准
- 健康中国行动心理健康促进行动
- 小儿呼吸系统生理特点解剖护理课件
- 中音萨克斯名曲经典十首
- 2016室性早搏治疗指南
- 数控折弯机简易数控系统SNC说明书操作手册
评论
0/150
提交评论