




已阅读5页,还剩60页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
专科护理培训计划及试卷cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made专科护理培训计划 一、 培训目标:熟练掌握监护室、外科、骨科常见疾病观察及护理,掌握各种常规技术操作。熟练掌握各种仪器的使用、保养、消毒隔离、故障排除等,掌握各项监测技术等。 二、 培训和考核对象:全体护理人员 三、 培训内容:由护士长及高年资的护理人员进行示范操作,护理人员自学各疾病临床表现及护理要点。 1)时间:每季一次理论及操作 2)主讲人:护士长及高年资护师 3)内容: 1、中心静脉置管的护理 操作:床上洗头法 2、呼吸机的使用及护理 操作:口腔护理 3、除颤仪的使用及护理 操作:鼻饲法 、亚低温治疗仪的使用及护理 4操作:静脉留置法 5、微量注射泵的使用及护理 操作:微量泵的使用 6、心电监护仪的使用 操作:输液泵的使用 7、中心静脉压与周围静脉压的监测 操作:雾化吸入器的使用 8、血糖及尿糖的监测 操作:大量不保留灌肠 9、皮下持续胰岛素泵持续泵入 操作:女病人的导尿 9、PICC置管的护理 操作:氧疗法 11单病种临床护理路径等 操作:痰标本采集法 12新技术、新业务 操作:动脉采血法 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not madecards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made2013年专科护理培训内容 1、外科围手术期护理 2、胸腔闭式引流护理 3、胃肠减压护理 4、T型管引流护理 5、骨牵引护理常规 6、石膏护理常规 7、骨科一般护理常规 8、腹腔镜胆囊切除术护理 9、PICC护理 10、PTCD护理常规 11、介入护理常规 12 、CVC的护理 the next processes work; 10, the construction site . 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor,cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made1 一、 术前护理 、 心理准备:通过与病人和家属交流,了解病人的心理状态,给予恰当的解释,1使病人以最佳的心理状态接受手术治疗。 2、 提高病人手术耐受力护理: (1) 了解病情及全身各系统情况,协助病人行相关检查; (2) 改善病人营养状况; (3) 配合手术的知识宣教:?有吸烟嗜酒习惯的病人劝其戒掉烟酒; ?训练深呼吸运动;?短期内不能起床病人,应训练床上排尿、排便; 3、 手术前常规准备: (1) 药物过敏试验;(2)皮肤护理(3)备血;(4)胃肠道准备:?一般手术前需禁食12小时,禁水46小时;?灌肠:一般手术前晚灌肠。如为肠道手术,按肠道手术的术前准备。(5)术晨:、?按医嘱执行术前各项准备;?女病人询问有无月经来潮;?排空小便,于术前半小时按医嘱给予术前用药。 二、 术后护理: 1、 病人返回病房时由手术室护士、麻醉师与病房护士交班,了解术中情况,妥善安置病人,选择合适体位。 2、 接各种引流管,保持引流通畅,观察引流液量、色及性质。 3、 生命体征观察:定时测体温、脉搏、呼吸、血压并记录。 4、 营养与输液:重视术后营养与液体供给,以维持机体能量和水电解质平衡。 5、 若无手术禁忌,鼓励病人早期活动。 6、 观察病情及时发现各种并发症,并及时处理。 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil w
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 病理操作面试题及答案
- 德国作曲考试题及答案
- 超常心理测试题及答案
- 仓库文员测试题及答案
- 创编人员面试题及答案
- 策论综合考试题及答案
- 2025年财务管理考试重点复习试题及答案
- 合作营销与品牌共赢的机会计划
- 仓库业务拓展新思路总结计划
- 主管在行业调整中的应变能力计划
- 中南大学毕业答辩学术论文模板
- 粪便检测在疾病诊断-全面剖析
- 第七章飞机重心与平衡裴娟64课件
- 如何提升护理队伍专业素质
- 2025高三一模浦东作文:生活中墙的意义与影响
- IT行业专业试题集范本1
- 国有企业内部审计工作制度
- 2025宿迁辅警考试题库
- 健康生活方式指导手册含饮食、运动
- 2025年森林管护员考试题及答案
- 未成年人学校保护规定的国际比较研究
评论
0/150
提交评论