DG Standard Operating Plan 2011-03-01.doc_第1页
DG Standard Operating Plan 2011-03-01.doc_第2页
DG Standard Operating Plan 2011-03-01.doc_第3页
DG Standard Operating Plan 2011-03-01.doc_第4页
DG Standard Operating Plan 2011-03-01.doc_第5页
已阅读5页,还剩13页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

CANH DG Standard Operating Plan Page 1 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu CANH DG Standard Operating Plan Asia Pacific Hub Operations This is a controlled document Paper and offline versions are for reference only CANH DG Standard Operating Plan Page 2 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu Revision Status Log Revision Section Page Number Amendment ObjectiveRevised DateInitials Owner Control record 15Update in charge person content Mar 1st 11Albert CANH DG Standard Operating Plan Page 3 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu Overview The CAN Hub will have the proper facilities and personnel to deal with dangerous goods The DG team has its own office area and a designated cage to store dangerous goods as illustrated in below drawing The physical buildup and breakdown of dangerous goods will be conducted in the Freight area where the DG team will cooperate with the Freight teams Manpower and Operating Hours There are 15 DG Agents to handle the dangerous goods The daily working schedule will be arranged by the manager Print out sort list manifest and check with the actual shipments Print DG manifest for any solid bypass hazard ULD Check transiting hazard for any exception and correct it DG Office DG Cage CANH DG Standard Operating Plan Page 4 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu Coordinate with Preparing Ramp Agent for ULD allocation Breakdown buildup hazardous shipments Present DG manifest to flight crew Check with flight crew for DG buildup Perform spill clean up activity Prepare spill clean up report DG agent work is defined by flight Flight Schedule as described by weekday for update flight schedule pls refer to P Verify DGA is responsible for Auto DG system and DG manifest accurate OIC or team leader is aim to double confirm with prepare DG agent and verify DG agent monitor their performance PST check form is implemented on daily work need keep files for 30 days DG manager would assign an employee to manage the PST check folder CANH DG Standard Operating Plan Page 17 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu DG DAILY TASKS CHECK DATE YES NO N A Prework Dry ice shipment in cool room was moved to buildup area The rollover DG was checked and towed to HWT Primary check by SIN D7 NRT D1 5 P A Time During operation Check if any transmit DG mixed in CAN inbound pkg No sameday inbound DG left in buildup area Secondary check by OIC Time After work The rollover dry ice was kept in cool room The rollover DG was staging correctly in the cage room The rollover report sent and keep file Tertiary check by ICN D7 ALA D1 5 P A Time By signing this check list I understand that the check list will be archived for at least 30 days CANH DG Standard Operating Plan Page 18 of 18 CANH ManagementLast Update and Version Mar 01 11 Prepared by Albert WenApproved by Sunny Chu Appendix8 After Ops Time Utilization Chart DG After Ops Time Utilization Chart DG From 0500am to 0550am 0500 0530 rollover DG handling DG volume statistac SCL DG han

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论