The Risk Management of Construction Project Abstract In the present construction project, risk management is known by people step by step. The passage has studied the meaning of risk management, and put forward some control risk measures. Because the construction project has the feature of long period, huge amount of money, difficulty in construction and complex technology. Whats more, there are many unpredicted things during the construction. If we dont prevent them, they will affect the project. Therefore, the passage through analyzing the feature of the construction project risk, proposed countermeasures of the risk caused by human factors and economic factors for the owner and the risk that the contractor faced in project selection stage, decision stage, contract signing stage and project implementation stage respectively. As to the owner, has put forward a lot of solutions, strengthen the management of all participate parties, improve the investment environment, clear the market prices, and increase the geological survey and so on. As for the contractor, understand the real engineering background, make choice to choose partners carefully before making the project selection, do not use the low-cost outright bidding blindly, afterwards, read the tender documents and the bid evaluation methods, and with its technological strength, reasonable price are the risks faced by their response to preventive measures.Key words construction project, risk management, the owner, the contractor.1 INTRODUCTION The risk is ubiquitous in the project risk management; project management can be said to some extent. Increasing number of uncertainties due to the rapid changes in the internal and external environment, the project, as well as project group, the types of risks faced by more and more, due to the scale of losses is growing, and these have prompted researchers and the actual emphasis on the risk management of the project management theory and practice. View of the partnership model can maximize the integration of the resources of the construction industry, contribute to innovation, learning and improving efficiency of the relevant organizations 1, it is necessary to establish a partnership-based project risk management mechanism to fully integrate the resources of the project development related parties China Construction industry to effectively enhance the level of risk management.2 RISK IDENTIFICATIONTraditional risk management is often the awareness of risk management, risk management activities into the daily concrete work, through training, implementation of management responsibilities to a staff who all risk management activities and project-specific combined. It is mainly to protect everyone responsible for their work is not unacceptable risk to protect the whole process, and the risk of the entire system is in the acceptable range and control, but it will result in the lack of communication of risk information between staff, especially for some important and complex risk identification, tracking difficult by the decomposition of the work by some staff independent to complete. Seen, the disadvantage of this risk management is that risk-related activities are too scattered, which is likely to cause the lack of overall risk management, systemic and continuity, and the exchange of risk information, risk knowledge sharing difficult 2.3 RISK ASSESSMENT TECHNIQUES 3.1Team of risk management is to have different backgrounds, representing different interests and needs of the staff involved in the risk management of the entire project process, the team of risk management is the management of a global system, emphasizing trust, collaboration, communication and knowledge sharing, team participation attitude towards risk, more full of enthusiasm and initiative.3.2Basic procedureTo clarify the risks which have significant or measurable impacts on projectTo analyze the consequences of the risks occurrenceTo evaluate the severity of the impact caused by the riskTo prioritize risks by calculating risk impact, and then formulate possible improvements or preventive measures.3.3Event tree analysisUsed to illustrate the sequence of the outcome after the occurrence of a selected initial event.Based on inductive logic. Mainly used in consequence analysis3. 33.4 Cause-consequence analysisA blend of fault tree and event tree analysis .Based on both deductive and inductive logic the risk level of the system can be established by calculating probabilities of various consequences with the probabilities of various events 4.4 RISK CONTROLDecision-making stage in the project, the following aspects of the project risk assessment: analysis of the domestic and foreign markets; presented with analysis of the concept of the project; project proposed criteria; project functions; costs; time; value analysis; programs; technology; project site; operation of the project; financial feasibility; capital, operating and financing strategies; project organization; procurement program; social, economic, demographic impact analysis; analysis of the governments macroeconomic policies and rules and regulations; environmental assessment; the constraints conditions for implementation of the project; project preparation requirements. Bidding in the project, the implementation of the operational phase, the need to manage the risk of the following aspects: ability to obtain governmental approvals; land acquisition; contractors selected; contract management; schedule control; 5 Cost Management; quality management; materials and equipment management; safety management; construction site management; cash flow management; information Management; project communication and coordination problems dispute settlement; commissioning; training run employees; transfer of financial and management documents; completion; put into operation.5 CONCLUSIONS The feature of construction determines it as a high-risk industry. Safety management in construction site is of critical importance in terms of its features and current safety management situation. Finding the exact risk factors and bring them under control is the prerequisite for effective prevention of accidents. The control of risky human behavior and unsafe status of materials, the improvement of the working environment and scientific management are the four most important factors to be considered in ensuring safety in production. The safety management can be fulfilled by practically controlling the above four factors and enforcing related safety laws and regulations so as to create a safe environment for the construction workers.REFERENCES1Egan,J.Rethinking ConstructionM.London:Transportation and Regions,2011.2Tang,W.Duffield,C.F.and Young,D.M.Partnering Mechanism in Construction:An Empirical Study on the Chinese Construction Industry J.Journal of Construction Engineering and Management,American Society of Civil Engineers,2006,132(3):217-229.3Construction Industry Institute.In search of Partnering excellence M.The U.S.:Construction Industry Development Agency.2010.4Chen Shaoting. New concepts of elasticity theory and an application J . Acta Mechanica Sinica, 1984, 16 ( 3) : 259- 274.5Rychlewski J. On Hooke. s Law J . Pr ikl Mat Mekh,2011, 48( 3) : 420- 435.1概述风险在项目中是普遍存在的,项目管理在一定程度上可以说就是风险管理。由于内、外部环境的快速变化,项目以及项目群所涉及的不确定因素日益增多,面临的风险种类也越来越多,导致的损失规模更是越来越大,这些都促使科研人员和实际管理人员从理论上和实践上重视工程项目的风险管理。鉴于伙伴关系模式能最大程度地整合建设业资源,有助于相关组织的革新、学习和提高效率1,有必要建立基于伙伴关系的项目风险管理机制,充分整合项目开发相关各方的资源,以有效提升中国建设业风险管理水平。2 风险的识别传统的风险管理往往是通过把风险管理的意识、针对风险管理的活动纳入日常具体的每一项工作中,通过培训将管理职责落实到每一个人员身上,所有的风险管理活动都与项目的具体任务结合。,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 翻煤笼司机作业工序危险预知培训
- 汉光武帝刘秀与光武中兴
- 专题01 实数的有关概念与计算(53题)(学生版)(01期)
- 银行业专业人员初级职业资格考试(银行业法律法规与综合能力)试题及答案(黑龙江省2026年)
- 第1章 走近细胞 综合测试
- 2026届七台河市勃利县三年级数学第二学期期末统考试题(含解析)
- 广州市2026年公职人员学法考试题库及答案
- 2026年银行业专业人员中级职业资格考试(专业实务风险管理)模拟题库及答案(河南)
- 文明施工专项管理方案
- 小班数学指南试卷及答案
- 叉车维护保养操作手册(杭州版)
- 2024年初中生物会考知识点汇编
- T-EJCCCSE 197-2025 系统窗施工技术规范
- 2025年高职院校基建处招聘面试实战模拟题集
- 施工单位竣工验收汇报总结
- 2025年重庆高一康德期末语文试卷及答案
- 肢体离断伤的急救处理
- JG/T 406-2013土木工程用玻璃纤维增强筋
- 《三只小猪》课本剧剧本:让学生体验角色扮演的乐趣(6篇)
- 哈利波特第一部中英对照
- 醉里乾坤大壶中日月长-初中语文九年级第六单元名著导读《水浒传》整本书阅读精读研讨课 公开课一等奖创新教学设计
评论
0/150
提交评论