



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
while lifting to drillThe speed has to be even, the attention observes barometer air pressure, appear to press Gao or depress and undulate a phenomenon, shut down to look into in time,Ensure the cement powder sprays even.6.after completing a stake construction, check the cement in the cement bottle to save quantity in time, everything as usual after, is moving to drill machine.Adopt a machine to carry on opening to dig, the soil digging out matches with to constuct unit to outside carry to correspond a location.Dig soil in the machineAt the same time, the artificial match cleans up a base, the side ascent protects, soil squares opening to dig should promise that foundation and watertightness start construction the noodles of working needed.(Three)Reinforcing bar item engineering All of 16 above reinforcing bars adopt an awl thread conjunction technique and use one A class conjunction set tube in this engineering, before usingCheck its factory quality document, by rule make to try a piece to send check, the quality document is well-found and try a qualified rear to use.1.the construction requestClass, category and diameter of reinforcing bar should press a design to request an adoption.When the demand generation changes, be recruited design unit ofAgree.All steel materials want to adopt a qualified steel material and enter to demand quality to protect a book before the field, and carry on an external appearance check(like rust eclipse,Tooth line, and crack.etc.), after entering a field take a sample to carry on physical function experiment, when its necessary as to its carry on chemistry analysis experiment, matchThe rear of the space can use the steel material.Reinforcing bar engineering should strictly according to the construction check and accept the norm and design diagram paper explain to carry on a construction.Full-time check member the spot heelThe class pursues a root to carry on an external appearance check and actually measures.Make a good reinforcing bar conjunction second examinations examining.Reinforcing bar after entering the field have to divide to criticize to divide specification Be piled, to examination the status make a marking and strictly forbid to use indiscriminately.While piling reinforcing barBelow carve the 240 mm brick wall of 300 mm Gao.2.the reinforcing bar create and colligationThe shape, size that the reinforcing bar processes has to meet a design request.The reinforcing bar turns over specially assigned is responsible for kind and turn over hard familiar before the kindKnow construction diagram paper, compute good next anticipate length, draw a big kind diagram.Curved hook and its length of reinforcing bar should match diagram paper, normShake a request with anti-.The reinforcing bar adoption concentration is piled, concentration under anticipate to raise a work efficiency.Dish circle the reinforcing bar is cold to pull an adoption to controlMake cold pull the way of rate to adjust to keep, cold pull a rate control at 4% in.The surface of reinforcing bar should is clean and has no oil stains, rust.The shape, size that the reinforcing bar processes has to meet a design request.The reinforcing bar processes on the spot carry on, after hard reviewing diagram paper and technique to hand over bottom, draw up reinforcing bar to go together with to anticipate a list, go together with to anticipate a listThe technical personnel makes a sample product Jin after approving officially, after checking without any error, so as to become to criticize descend anticipate, and hang good standard in becoming and anticipatingSlice card, note grade, specification and use part etc., in order to prevent mix to use can trace back to sex with realization.Reinforcing bar colligation must attain to draw a line fixed position, the beam reinforcing bar orders some colligation, persistence first lord beam after time beam, first beamBackboard colligation procedure.Pillar reinforcing bar:When the fixed position puts line, flick pillar open side line and stalk line position, the putting of pillar Jin position should be accurate, scaleboard last formThe noodles sets a hoop Jin, and weld with scaleboard reinforcing bar fixedly to promise that the plank, pillar puts Jin position accurate.The corpus beam reinforcing bar colligation, strict according to diagram paper the design and construction acceptance norm carry on, reinforcing bar colligation craft:CheckTo the reinforcing bar semi-processed goods-colligation reinforcing bar-prepare to cover up, reserve the pipeline, iron piece and hole-colligation protection layer a mat piece-from the check-Check Jin.The protection layer mat piece should prepare to make in advance, the adoption C35 thin stone concrete, the specification 40 mm 50 mms, the thickness pressesDesign a request.Sprinkle concrete now hollow have no beam building of the cover reinforcing bar colligation:Reinforcing bar on the painting line-colligation bottom skin of template-spreads tube-colligation topThe net slice Jin-colligation of the skin reinforcing bar-colligation rib takes care of rib support piece.Before the concrete starts construction, Han system 300 mm Gao person graphemic Ma Deng, build feet hand plank, is a plank upper part personWay in the line, in order to prevent the reinforcing bar colligation is trampled Ta breakage after completing.(Four)Template engineeringThis engineering template adoption bamboo gum template, the bowl button up type dismantle to prop up system quickly.According to designing the frame beam of request model number,Make the bamboo template into already set template, make use of the slot steel creation pillar hoop, the template joint blind side Yan 1 cm thick sponge, promise itDont support to touch, gastight syrup.Because this engineering sprinkles to take after 2830 stalks establish a , theSupport to establish in response to the independence, can not influence other part templates to tore down.1.the template installAccording to the characteristics of this engineering, the template adopts the allocation that bamboo template and wood template combine together, the economy applies, vivid squareThen.The stairs marks time to adopt already set steel template.The level structure template adoption bamboo gum big template, wood template, , process settleThe type bamboo template is used for beam bottom, beam pound template, the crest plank template is used the already set bamboo gum template, prop up an adoption bowl button up type to dismantle to prop up quicklySystem.2.the te
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 子女作息习惯培养与家长支持合同
- 管理者的价值体现
- 建筑施工现场安全培训与咨询服务协议
- 婚后奢侈品共有及离婚后财产分割及权益维护实施协议
- 半导体引线框架研发与市场推广合作协议
- 紧急救援私人飞机航线申请与保障合同
- 国际艺术品物流保险及风险防控合同
- 股权激励合同模板:核心员工激励方案
- 先进工业模具技术升级合同补充条款
- 豪华游艇卫星电话租赁及全球语音数据传输合同
- 2024年咸阳职业技术学院单招职业技能测试题库及答案解析
- 2020年10月自考00445中外教育管理史试题及答案含解析
- 《重选的基本原理》课件
- 云系统安全运维
- 【基于SERVQUAL模型的京东生鲜电商物流服务质量评价的实例探析8100字(论文)】
- 实验二-导弹自寻的制导律设计与仿真
- 关于校本课程及校本教材开发与认定的管理办法
- 五年级数学竞赛试题原创
- 教师听课评价记录表
- 十字头夹具设计说明书
- 04S202 室内消火栓安装
评论
0/150
提交评论