国家电网公司专业技术人员电力英语水平考试宝典(补全短文)_第1页
国家电网公司专业技术人员电力英语水平考试宝典(补全短文)_第2页
国家电网公司专业技术人员电力英语水平考试宝典(补全短文)_第3页
国家电网公司专业技术人员电力英语水平考试宝典(补全短文)_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

. 补 全 短 文Passage 1 Functions of power transmission CEADB The function of (1) is to send power from power plants to load center or to exchange。 A. step-down substations and connected transmission equipment B. power network operation C. power transmission D. transmission at high voltage E. power networksPassage 2 Substation misoperation and its preventing CEABD The misopemtion that can lead to (1) mainly are:on-load switching of isolating switch; A. preventing the misoperation in substation B. the closing of grounding switch with power on C. accidents in the electrical operation of the substation D. the persons from illegal entering the lived bay E. the grounding wire (closing the grounding switch) with power onPassage 3 A brief introduction on the development of supercritical boilers and their main advantages BDEAC In (1) such as U.S.A,Japan and European countries,the supercritical。 A. good homogenization of distribution B. some advanced countries C. whole process management is strengthened D. great advantages oil economy and environmental protection E. subcritical once-through boilerPassage 4 Steam generation and use BEADC Steam is one of mans dependable servants More and more in the background,。 A. first generating steam B. an electrically heated home C. use of steam for electric power generation D. the new generating capacity being installed E. the fuel is uranium and the heat is suppliedPassage 5 Circuit breaker BDAEC Circuit breakers are automatically operated high voltage (or high current) switches.。 A to perform any switching operation after long periods B. to control electrical power networks C. of the circuit breaker D. to switch the current which can be from a few amperes E. of the highest importance for high reliability Passage 6 The ratio of distance to height of pumped-storage power plant BDACE For pumped-storage power plant, generally the ratio of distance to height (l), 。 A. is most economic B. is used to evaluate topographic condition of power plant C. is not desirable D. is the ratio of horizontal distance between upper and low reservoir E. is the best Passage 7 Fuel cells BAECD Fuel cells are devices that when a fuel such as hydrogen or hydrogen-rich compounds and oxygen are supplied to 。 A . further development is under way B. there is no storage capacity in a fuel cell C. many cells are operated in series to obtain voltages D. supply alternating current from fuel cells E. as they are being developed there have been some applicationsPassage 8 Substations pace into the Digital Age CAEBD Substations constitute the main part of power transmission and distribution in a power grid. 。 A. substation automation technology has reached a certain level B. simulation training technology for substation operation C. composed of a large number of primary and secondary equipments D. a full-digital automation system E. all of which has become an indisputable factPassage 9 Overcoming the Problem of Waste CADEB Many large cities are anything but beautiful Streets are littered with trash. In this trash, however, (1) 。 A. there is no time to be lost B. building beautiful cities out of garbage is only a dream C. there is still something that can be useful D. it can be put to use again E. more and more machines are designed for this purposePassage 10 Hibernation EBDAC The weather in winter. Call be very cold. Some animals sleep during the winter, 。 A. So they dont need to worry about bad weather and other dangerous animals B. We call this kind of sleep in wintertime “hibernation C. As it gets warmer and warmer in spring,the sleeping animals begin to wake up and look around for food D. Hibernating animals dont need to eat much because they dont move E. They can sleep for a long timePassage 11 Satellites BDACE The body that is neatest to the Earth is the moon. (1). This satellite is 。 A. The bigger and heavier a body is, the greater is its force of gravity B. It circles the Earth and is therefore know as a satellite of the Earth C. To get out into space we have to overcome the Earths gravitational pull D. A satellite stays in orbit because the planet gravitational force keeps pulling it into a circleE. Artificial satellite can be used for various purposesPassage 12 Secondary equipment in power system BDEAC The secondary equipments in power system are (1), measuring,regulating,。 A. 5A rated current of the current transformer secondary winding B. the equipments that provide protecting,monitoring C. 50V rated voltage of PT secondary side D. the equipments that send the command signals E. current values in secondary systemPassage 13 Switching overvoltage EABCD A sudden change in the configuration of transmission network caused (1) or by the appearance of a fault can。 A. determine the insulation requirements of transmission lines B. the cost of transmission and 1ine failure rate C. at both opening and closing of circuit breakers D. by means of circuit breaker closing resistor in 500kV system E. by the operation of a circuit breakerPassage 14 Transmission line and distribution line ADBCE The high voltage power line through which power is (1) is called power transmission line. 。 A. transmitted from power plants step-up substation to step-down substation B. the overhead transmission line C. lightning frequently happening and heavy raining D. the power line that transmits the power from step-down substation E. 1arge spanning line sectionPassage 15 Transformer insulation CEABD The insulation of a transformer can be categorized into internal insulation and external insulation. 。 A. The main insulation materials inside transformer are transformer oil B. The degradation of insulating properties of insulation materials under long period of influence C. The internal insulation refers to the insulation of various parts inside the oil tank DIf the winding temperature is within the scope of 80140 oC E. The main insulation refers to the insulation between windings and grounding parts and the insulation between windingsPassage 16 The electricity market BDAEC The aim of introducing market mechanism is to bring various parties more。 A. to agree on the price and quantity to be traded B. a wholesale market C. to register as a market customer D. a retail market E. to choose electricity suppliersPassage 17 Electric power CBDAE Electric power is a most convenient,clean,safe,and useful form of energy which supplies 。 A. its growth rate B. its unavailability C. the lack of electricity (a blackout) D. social disorder, and even national tragedy E. high electric power consumption per capitaPassage 18 Copyright piracy BDAEC There are numerous examples of what has become known as copyright piracy. 。A. new chemicals B. the research and developmentC. physical propertyD. the fake and real itemsE. the intellectual property Passage 19 Electrical energy DEBAC Electrical energy is the presence and flow of an electric charge. 。 A. Alternatin

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论