全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
NPI (New Project Implement) Project全过程各阶段定义,特性,要点:BCA (Business Case Approval) 阶段: 项目立项可行性评审阶段项目商务事项认可过程,项目可行性评估,确定是否同意进行立项,确认立项后,项目启动,召开Kick Off Meeting,组建项目小组.重点: 确认项目是否立项 (规划层经营层)PD (Product Definition) 阶段: 产品详细定义评审阶段产品系统框架确立完成并被评审,项目Development Schedule确立.重点: 项目产品定义是否合理,Development Schedule确立.PS: 一般情况下,满多公司不会对BCA和PD阶段做太明确的阶段区分,一般整合到一个阶段,即项目立项可行性评审阶段. EVT (Engineering Verification Test) 阶段: 工程样品验证测试评审阶段Identify design problems and solving them as early in the design cycle, verify the design meets pre-determined specifications and design goals. Consists of Basic Functional Tests, Parametric Measurements, Specification Verification.重点: Ensures basic unit performance to design goals and specifications.PS: 此阶段一般要完成如下资料/事项:Product /Engineering SpecificationDesign Verification Test Plan (Basic Test, Compatibility Test, EMI)Test Equipment and ToolingTest Process, Test Guideline and Test ProgramSoftwareCircuit SchematicPCB Layout3D & 2D & Exploded DrawingSurface & Artwork & PackagingPre-BoMCost ReviewFailure Analysis and Corrective ActionsEVT评审会议DVT (Design Verification Test) 阶段: 设计样品验证测试评审阶段Design refinement. Revise and improve the design to meet performance and design requirements and specifications. Deliver objective, comprehensive testing verify all product specifications, interface standards and diagnostic commands. Consists of Functional Testing (including Usability), Performance Testing, Climatic Testing, Reliability Testing, Compliance Testing.重点: 确认是否合符产品定义要求,可否批量生产.PS: 此阶段一般要完成如下资料/事项:Design Verification Test Complete (Basic Test, Compatibility Test, EMI)Basic Test包括:a: Function Testb: Safety Test (主要包括: Hit-Pot, 绝缘电阻测试, Current Leakage, 接地测试)c: Environment Testd: Mechanical Test (主要包括: Vibration Test, Drop Test)Compatibility Test包括:a: 硬件与软件之兼容性b: 硬件与硬件之兼容性EMI Test: 抗静电,电磁干扰Safety CertificationDesign Change (according to the design change information, modify all related design files/drawing/software/program.)Modify BoM制程文件试用的制作AVL (Approved Vendor List)Failure Analysis and Corrective ActionsDVT评审会议PVT (Production/Process/Pilot Run Verification Test) 阶段: 小批量过程/生产验证测试评审阶段Verify design has been correctly implemented into production, consists of Compatibility Verification Testing and Reliability Testing.重点: 能否量产PS: 此阶段一般要完成如下资料/事项:Failure Analysis and Corrective Actions各种制程文件修改并正式发行Engineering Change针对变更(小变更)做相应测试Tooling VerificationApproval Sheet / FileCompatibility Verification TestReliability Test制程能力报告PP Approval MeetingGolden Sample产品资料releaseMVT (Mass Production Verification Test) 阶段: 量
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 小学信息科技人教版(新教材)三年级全一册第8单元 守护在线安全 教学设计
- 《建筑结构健康智慧监测技术规范》
- Unit 5 Section B Vocabulary in use课件英语新教材人教版八年级下册
- 衣物晾晒防变形与阳光直射利弊
- 2026交通银行深圳分行社会招聘笔试参考题库及答案解析
- 2026江苏常熟农村商业银行股份有限公司招聘笔试备考试题及答案解析
- 2026浙江苍南县人才科创有限公司招聘主办会计笔试备考试题及答案解析
- 国家管网集团工程技术创新有限公司(国家管网集团造价管理中心)2026届春季高校毕业生招聘考试模拟试题及答案解析
- 2026中国南水北调集团综合服务有限公司北京供应链管理分公司春季招聘9人考试备考试题及答案解析
- 2026年及未来5年市场数据中国肉类零食行业市场发展数据监测及投资潜力预测报告
- 年产200万吨炼铁高炉车间设计设计
- 《钢质锻件锻造生产能源消耗限额及评价方法》
- 23J916-1:住宅排气道(一)
- 美洋体感音波系统说明
- 心理健康与社会适应
- 2023年04月辽宁锦州市公开招聘引进部分国内重点高校和急需紧缺专业优秀应届毕业生到市直事业单位工作笔试参考题库附答案解析
- APQP问题清单模板
- 历史哲学绪论
- GB/T 16656.44-2008工业自动化系统与集成产品数据表达与交换第44部分:集成通用资源:产品结构配置
- 小说环境描写
- ICH指南指导原则Q11原料药开发和生产课件
评论
0/150
提交评论