




已阅读5页,还剩5页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
work section: foundation and main structure work item: steel workDisclosure item: matters need attention when steel being cut and bound Disclosure content:1. 10、8、6.5 steel should be straightened before to be cut with steel straightener. Workers should operate steel straightener as per operating instruction, avoiding to be hurt by steels re-bounce. 2. Workers should operate cut-off machine and bending machine as per operating instruction. During bending and transportation, workers should pay attention to if the steels are bended tightly to avoid hurting others. Check the executive condition: GOODwork section: foundation and main structure work item: welding machineDisclosure item: safety operation Disclosure content: 1. Welding machine should be stored in dry and well insulating condition. Check if first and second insulated wires are in good condition, if there is a shield on wiring section, if electrode holder is in good condition and if null line works at connecting section. After checking and verifying there is no hidden danger, welding machine can be used. 2. Workers should take insulating measure when they work in wet condition, such as in gutter, pipe and boiler. They can use insulating board or rubber and wear insulating shoes. Work surroundings should be well ventilated. 3. Operators should wear insulating glove and insulating shoes when they are welding. Shelf, rail, pipe steel and another conductor are forbidden to connect welded object. Copper wire is allowed to connect welded object. 4. Operators should have operating certificate. Available fire-fighting equipments should be around working place, with pro staff in charge of this equipment. Keep inflammable far away form welding work section. Make sure no fire can be make by splashing spark. 5. Cut off power supply before removing holder line. Workers can not climb up with holder line. 6. When work finishing, workers should cut off power supply and check work place, making sure that there is no hidden danger. They could leave after that. Check the executive condition: GOODWork section: foundation and main structure work item: concrete work Disclosure item: concrete workDisclosure content:1. Transport concrete to casting concrete work section with tower crane. Lift van should be stopped at 200-300mm above floor. Concrete should be casted slowly in case of frame fall apart. 2. Workers should follow operating instruction when they vibrate concrete. Plug vibrator into concrete quickly and extract it slowly. Workers should follow operating instruction when they use planar vibrator.3. Workers should check frame during and after casting concrete. If descending happen to frame, worker should fix it in time. Check the executive condition: GOODWork section: foundation and main structure work item: site mix workDisclosure item:Disclosure content 1. Workers who join in this construction should have a good knowledge on their own safety technical operating specification. During operating, workers should work seriously. Operating after drinking is forbidden. 2. Machinist must receive training, pass relative examination and get operating certificate so that they can operate machine independently.3. Workers should use protective equipment and safety protective facility in right way. Everyone must wear safe helmet when he enter into site. Baring feet and wearing slipper are not allowed on site. Safety belt must be used when worker work at some high section. Entrance and exit should be covered by protective shed or others insolating facility when workers are involved with each other at the same time. Protective rail, baffle and safety net should be fixed above 3 meters from ground. Regular check helmet and safety net. 4. Safety sign and caution plate should be fixed on scaffolding. They can not be removed unless construction crew allow removing. 5. Traffic signs should be fixed on site. “Dangerous” or “caution” sign should be fixed at some dangerous places. Check the executive condition: GOODWork section: foundation and main structure work item: Disclosure item: season workDisclosure content: 1. Before and after storm, workers should check temporary facility, scaffolding, electromechanical equipment and temporary circuit. If leakage of electricity, leakage of rain, lean, deformation and sinking are found, workers should mend and fix them in time. Serious problems must be solved immediately. 2. Roads on site should be maintained well. 3. Workers should take ventilating and cooling measure when their work surroundings is too hot to work.Check the executive condition: GOODWork section: site work item: safety management Disclosure content:1. All safety instruments and machines can be used after getting checked and verified certification. 2. Found and complete checking system.3. All staffs who do safety work or do special work must receive training and getting certificate from superior department.4. It is forbidden to enter site without helmet. Wear safety belt and anit-skidding shoes when work at high please. Site is staff only. Others who need or want enter site must get approved. No child is allowed enter site. 5. It is forbidden to enter site without shoes, wearing slippers, high-healed shoes, skirt and without shirt. Female workers should roll up their long hair and wear helmet. 6. No horseplay during work time on scaffolding. No work after drinking alcohol.7. Using electric oven is forbidden in temporary facility, such as dormitories. Check the executive condition: GOODWork section: work item: hoist Disclosure item: tower crane hoistDisclosure content:1. No lifting if objects weight is over max carrying capacity.2. No lifting once the signal is not clear.3. No one is allowed to stand under the sling.4. No one is allowed to stand on the sling.5. No lifting if objects are in the underground.6. No lifting if skew haul and skew hang.7. No lifting if the bondage of scattered objects is not fasten enough.8. No lifting if the scattered slings have no any container.9. No lifting if the weight of slings are not clear and hook is not qualified.10. No lifting under the bad weather, such as gale, downfall and fog.Check the executive condition: GOOD Work section: work item: tower crane and work high above the groundDisclosure item: tower crane and work high above the groundDisclosure content:1. Aerial work personnel should do regular physical examination. They should stop working if their bodies are not fit.2. Aerial work personnel should wear flexible clothes. No slipper. 3. Aerial work material should be piled stable. Put tools inside of pocket conveniently. No cast tools when workers deliver tools. 4. If under bad weather such as gale, downfall and fog, open-air aloft lift should be stoped. 5. Ladder should be in good condition. Bed hedgehopping is forbidden. 6. No walking on scaffolding and shelf
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年软件工程师面试宝典软件技术预测试题及解析
- 2025年烷基化工艺作业考试常见问题及解答
- 2025年猪肉行业趋势分析与预测题
- 28、水平二篮球备课18课时+匹配教案
- 2025年物联网技术领域高级职位求职必-备面试题答案详解
- 电力供应基础知识培训课件
- 2025年初中音乐特岗教师招聘面试指南及预测题
- 2025年基于实际案例的灌区管理工初级面试题分析与解答
- 2025年物联网技术入门指南与初级考试要点解析
- 人口手耳目教学课件
- 2025年长沙市中考数学真题试卷及答案
- 分装安全操作规程
- 临时用电全管理制度
- 2025年河北高考生物试卷真题答案详解及备考指导
- 2025年高校教师资格证考试《高等教育政策和法规》真题卷(附详细解析)
- 餐饮区域保护合同范本
- T/CGCC 35-2019单用途商业预付卡卡片规范
- DB32/T 4598-2023光伏农业园区规划编制要求
- DB31/T 552-2017大型商业建筑合理用能指南
- 科研助理合同协议书
- 绿化工程挂靠合同协议
评论
0/150
提交评论