版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Project Name: Prepared by : Checked by : Date: Business Case (why selected) Define Measure Analyze Improve Control Describe the current financial impact of the problem, i.e. how much money is currently wasted because of the problem. This waste of money may be due to e.g. scrap, rework, repair, slow
2、cycle time, bottlenecks, poor utilization of capacity, inventory costs, warranty costs, lost volume, lost opportunities, etc. Practical Problem Definition Problem Statement: Project Objectives: Define Measure Analyze Improve Control Project Team Sponsor the project; Resource support; Manage and Appr
3、aise MBB and BB. Lead and manage the project; Training the GB and team members; Coordinate between members and departments; Follow up the project phase; Manage and Evaluate GB. Collect the data for analysis; Process Capability Study; MSA; Execute the improvement plan with project members; Keep good
4、communication between suppliers and project team; As a consultant, direct the project; Training GB and team members. Collect relative data; Negotiation with suppliers on quality requirement. Collect relative data; Incoming quality inspection; Collect the data for analysis; FMEA; Process Capability S
5、tudy; MSA; Execute the improvement plan with project members; Optimize the process; FMEA; Process Capability Study; MSA; Execute the improvement plan with project members; Support the project and keep production line running when project needed; Assign the operator and line for project experiment. A
6、ssign technician to adjust the machine and parameter setting; Execute the improvement plan with project members; Technical support for the improvement project; Execute the improvement plan with project members; Responsibilities Define Measure Analyze Improve Control Primary Metric Define Measure Ana
7、lyze Improve Control Business Impact (cost savings estimated) Define Measure Analyze Improve Control Project Gantt Chart Define Measure Analyze Improve Control Phases Timeline Main Activities July AugSeptOct Nov Dec Define Business case Project scope & objective Team set up Measure MSA for Y and Xs
8、Process Capability Assessment Cause & Effect Analysis Screen potential causes Fast improvement measures Analyze Status analysis for Xs Statistical analysis and verification for Xs Improve Actions piloted Result verification Control Standardization Control plan & SPC Cost savings verification Respons
9、e Variable (Y) Response Variable and Specification: Measurement System Description: Define Measure Analyze Improve Control Project Scope Define Measure Analyze Improve Control Measurement System Analysis Objective: Verify the Measurement System for Standby Power Testing by Variable Gauge R&R method.
10、 Standby Power Tester Model: Digital Power Meter_1 Sample Size: 10pcs Method: 2 Test Operators, test 3 time for each sample % R&R=sMS/sTotal *100=%SV= 4.33% 14% (Ideal) % P/T=5.15*sMS/Tolerance *100= %SV/Toler=2.45% 10(Ideal) So, the Measurement System for Standby Power Test should be acceptable acc
11、ording to the above GR&R result. Conclusions: Study Var %Study Var %Tolerance %Process Source StdDev (SD) (6 * SD) (%SV) (SV/Toler) (SV/Proc) Total Gage R&R 0.0030639 0.018384 4.33 2.45 5.11 Repeatability 0.0030639 0.018384 4.33 2.45 5.11 Reproducibility 0.0000000 0.000000 0.00 0.00 0.00 Operator 0.
12、0000000 0.000000 0.00 0.00 0.00 Part-To-Part 0.0707398 0.424439 99.91 56.59 117.90 Total Variation 0.0708061 0.424837 100.00 56.64 118.01 Number of Distinct Categories = 32 Define Measure Analyze Improve Control Analysis of Capability Define Measure Analyze Improve Control Process Map Wrong wire Ins
13、ulation damage Wrong numbers of turns Incorrect wire tension Pin bended P o o r a s s e m b l y (not to bottom) C Pin C Fixture U Operator C Bobbin dimension C Magnetic wire_Dia C Winding Parameter (travel/tension/spee d) U Operator Wrong wire Insulation damage Wrong numbers of turns Incorrect wire
14、tension C Pin C Soler wire C Temperature C Time U Operator Cold solder Wrong tin wire No solder Excesssive solder C Fixture U Operator Wire broken Mal-assembly C Fixture C EI core dimension C EI core burrs U Operator U Machine Adjust EI core bending Demage bobbin EI core side not identical C EI core
15、 U Operator U Machine Adjust EI core bending EI core loose Visual defect C T e s t e r m a l - function U Operator Cycle time Yield Pass the transformer which not been tested C Dipping time C Dipping depth U Machine vibration U Varnish viscosity U Operator U Fixture Cycle time EI core loose Visual d
16、efect C Drying Time C Temperature U Operator U Oven Structure Cycle time Transformer demage C Input Voltag e / Current C Tester C Transformer U Operator Voltage _No load High Standby power Hi-pot/Insulation Visual Defect Prepare Raw Material, MPI, Equipment, Operator etc Primary Winding Soldering wi
17、re Press pin Bobbin and bobbin cover Assembly Stacking EI core Press EI core Electrical Function Testing Varnish Drying Functional Testing Next Process Secondary Winding ProcessInputOutputProcessInputOutput VA VA VA VA VA VA VA VA NVA VA VA NVA Define Measure Analyze Improve Control C&E Matrix To li
18、nk the C&E Matrix to the Process Map and Relates the KPIVs to the KPOVs with a simplified QFD matrix. Define Measure Analyze Improve Control RatingRating of Importance to customer of Importance to customer 1044 NoNo12345 ProcessProcess Output Output Total NoProcessProcessProcessProcess Input Input(
19、(X)X) XY 10 0 20 0 30 0 40 0 50 0 60 0 70 0 80 0 90 0 100 0 110 0 120 0 130 0 140 0 150 0 160 0 170 0 180 0 19 0 0 20 0 0 21 0 0 22 0 0 23 0 0 24 0 0 C&E MatrixC&E Matrix PFMEA FMEA is structured approach to Identify ways the product or process can fail and eliminate or reduce the risk of failure. D
20、efine Measure Analyze Improve Control Summary of M Phase Define Measure Analyze Improve Control Identification of Likely Xs Xs related to Raw Material Xs related to Process& Equipment Define Measure Analyze Improve Control Define Measure Analyze Improve Control Summary of Most Likely Xs Xs related t
21、o Raw Material EI core Thickness(0.5+/-0.03) Different EI core Suppliers Dimension Measurement System Control in IQA Bobbin Cover Height (18.15+0/-0.15) Xs related to Process Bobbin/cover deformation after winding process, which may cause high standby power and will be studied in DOE phase. Winding
22、Process Parameter setting Winding Speed Winding Tension Winding Travel Define Measure Analyze Improve Control Summary of A Phase Biggest Problems and Barriers: Project Status: J Define Measure Analyze Improve Control Central Composite Design Factors: 3 Replicates: 1 Base runs: 20 Total runs: 20 Base
23、 blocks: 1 Total blocks: 1 Two-level factorial: Full factorial Cube points: 8 Center points in cube: 6 Axial points: 6 Center points in axial: 0 Alpha: 1.68179 Purpose: This DOE aims to verify the linear/quadratic effects and interactions between parameter settings to Standby Power by Central Composite Design. Design of Experiments Speed 3 levelLow: 6000
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026重庆长江轴承股份有限公司招聘122人备考题库及参考答案详解(巩固)
- 混凝土强度检测方法方案
- 某化肥厂原料储备规范
- 施工现场卫生与健康管理
- 混凝土施工人员培训方案
- 混凝土强度等级评定方案
- 土方工程施工技术方案
- 2024-2025学年度反射疗法师大赛理论考试综合练习附答案详解【综合卷】
- 2024-2025学年度烟草职业技能鉴定试题含答案详解
- AK-1-Standard-生命科学试剂-MCE
- 山东省2026年春季高考技能测试电子商务类专业模拟试题及答案解析
- 2026年高校统战部招聘考试笔试试题(含答案)
- 2026新疆兵团第 三师法院系统聘用制书记员招聘(8人)考试参考试题及答案解析
- 2025年病历书写规范培训试题(附答案)
- 2026年春季三年级道德与法治下册全册期末考试知识点材料
- 2026贵州省事业单位联考招录易考易错模拟试题(共500题)试卷后附参考答案
- 2025国考公安机关面向公安院校公安专业毕业生招录人民警察专业科目笔试考试大纲考试备考题库附答案
- 南昌市新力禧园2#住宅楼施工组织设计施工组织设计
- 绿电直连政策及新能源就近消纳项目电价机制分析
- 2026年及未来5年中国婚宴酒席行业市场全景分析及发展趋势预测报告
- 2026年贵州高考化学真题解析含答案
评论
0/150
提交评论