1、MVA Method Short Circuit CalculationA Short Circuit Study is an important tool in determining the ratings of electrical equipment to be installed in a project. It is also used as a basis in setting protection devices. Computer software simplifies this process however, in cases where it is not availa
2、ble, alternative methods should be used. The per-unit and ohmic method are very tedious manual calculation. These hand calculations are very prone to errors due to so many conversion required. In per unit, base conversion is a normal part of the calculation method while in ohmic method, complex enti
3、ties conversion.The easy way to do hand calculation is the MVA method.In this example, we shall be presenting a short circuit study of a power system. Motors are are already lumped with ratings 37kW and below assigned an impedance value of 25% while larger motors are 17%. A 4MVA generator is also in
4、cluded into the system to augment the utility.推荐精选Figure 1Utility: 33KV, 250 MVAsc (the 250MVA in this example is just assumed. Ask your utility for the actual fault level at your point of connection)Transformer 1: 10 MVA, 33/11KV, 9% Z11KV BusGenerator: 4MVA, X"d = 0.113Transformer 2: 5 MVA, 1
5、1/6.6KV, 7% ZMotor 1: 5MVA (Lumped), 17% Z6.6KV BusTransformer 3: 2 MVA, 6.6KV/400V, 6% ZMotor 3: 6.8 MVA (Lumped), 17% Z400V BusMotor 4: 300 KVA (Lumped), 17% ZMotor 5: 596 KVA (Lumped), 25% ZIn the event of a short circuit, the sources of short circuit current are1. Utility2. Generators3. MotorsSt
6、atic loads such as heaters and lighting do not contribute to short circuit.The "Equivalent MVA" are:Transformers and MotorsGeneratorsCables and Reactors推荐精选In Figure 1, I have calculated the Equivalent MVAs of each equipment, writing it below the ratings.Figure 2Utility: MVAsc = 250MVATran
7、sformer 1: MVAsc = 10 / 0.09 = 111.11 MVA11KV BusGenerator: MVAsc = 4 / 0.113 = 35.4 MVATransnformer 2: MVAsc = 5 / 0.07 = 71.43 MVAMotor 1: MVAsc = 5 / 0.17 = 29.41 MVA推荐精选6.6KV BusTransformer 3: MVAsc = 2 / 0.06 = 33.33 MVAMotor 3: MVAsc = 6.8 / 0.17 = 40 MVA400V BusMotor 4: MVAsc = 0.3 / 0.17 = 1
8、.76 MVAMotor 5: MVAsc = 0.596 / 0.25 = 2.38 MVAFigure 3Upstream ContributionStarting from the utility, combine MVAs writing each one above the arrows.At Transformer 1:MVAsc 33KV = 250 MVAMVAsc 11KV = 1/ (1 / 250 + 1 /111.11) = 76.87 MVA推荐精选At Transformer 2:MVAsc 11KV = 76.87 + 35.4 + 29.41 = 141.68
9、MVAMVAsc 6.6KV = 1/ (1 / 141.68 + 1 / 71.43) = 47.49 MVAAt Transformer 3:MVAsc 6.6KV = 47.49 + 40 = 87.49 MVAMVAsc 400V = 1/ (1 / 87.49 + 1 / 33.33) = 24.14 MVAAt 400V MotorsMotor 3: MVAsc = 24.14 x 1.76 / ( 1.76 + 2.38 ) = 10.26 MVAMotor 4: MVAsc = 24.14 x 2.38 / ( 1.76 + 2.38 ) = 13.88 MVADownstre
10、am ContributionStarting from the bottom (400V Bus), I combined MVAs writing each one below the arrows. In this bus, the motor contribution to short circuit is the sum of the MVAs of the lumped motors Motor 3 and Motor 4.At Transformer 3:MVAsc 400V = 1.76 + 2.38 = 4.14 MVAMVAsc 6.6KV = 1/ (1 / 4.14 +
11、 1 / 33.33) = 3.68 MVAAt Transformer 2:MVAsc 6.6KV = 3.68 + 40 = 43.68 MVAMVAsc 11KV = 1/ (1 / 43.68 + 1 / 71.43) = 27.11 MVAAt Transformer 1:MVAsc 11KV = 27.11 + 29.41 + 35.4 = 91.92 MVANote: Two downstream plus the generator contribution.MVAsc 33KV = 1/ (1 / 91.92 + 1 /111.11) = 50.3 MVATo determi
12、ne the Faults Current at any bus on the power system, add the MVA values above and below the arrows. The sum should be the same on any branch.Example:11 KV Bus:From Transformer 1: MVAsc = 76.87 + 91.92 = 168.79 MVAFrom Generator : MVAsc = 35.4 + 133.39 = 168.79 MVAFrom Transformer 2: MVAsc = 141.68
13、+ 27.11 = 168.79MVAFrom Motor 1: MVAsc = 139.38 + 29.41 = 168.79 MVAThis is a check that we have done the correct calculation.Ifault 11KV = 168.79 / (1.732 x 11) = 8.86 kA推荐精选All we have done above are three phase faults, you may ask, how about single phase faults?For single phase faults, positive s
14、equence, negative sequence and zero sequence impedances need to be calculated.If = 3 (I1 + I2 + I0)Examining the circuit in Figure 1, at the 400V Bus, on Transformer 3 contributes to the zero sequence current.For transformers, the negative sequence and zero sequence impedance are equal to the positi
15、ve sequence impedance.Z1 = Z2 = Z0 orMVA1 = MVA2 = MVA0At the 400V Bus1 / MVAsc =1/3 (1 / MVAsc1 + 1 / MVAsc2 + 1 / MVAsc0)1 / MVAsc = 1/3 (1 / 28.28 + 1 / 28.28 + 1 / 33.33 )MVAsc =3 xÃâà9.93 = 29.79ÃâàMVAIf = 29.79 / (1.732 x 0.4) = 43 kAAt 6
16、.6KV Bus1 / MVAsc = 1/3 (1 / MVAsc1 + 1 / MVAsc2 + 1 / MVAsc0)1 / MVAsc = 1/3 (1 / 91.17 + 1 / 91.17 + 1 / 71.43)MVAsc = 3 x 27.83 = 83.49 MVAIf = 83.49 / (1.732 x 6.6) = 7.26 kAConclusion:This example illustrates that using the MVA Method of Short Circuit Calculation, it will be very easy to calculate the fault current at any node within a p
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2030中国超高清视频编解码芯片标准统一与生态建设路径
- 2025-2030中国证券行业增值服务智能投顾与投资者行为
- 市政道路工程监理制度规范
- 提升全民消防安全意识的社区宣传教育活动实施方案试卷
- 2026广东江门高新投资发展集团有限公司招聘1人备考题库附答案详解(完整版)
- 2026安徽马鞍山当涂县首创水务有限公司招聘劳务派遣人员4人备考题库及一套参考答案详解
- 2026北京大学工学院(本科生学院)招聘劳动合同制人员1人备考题库及答案详解(各地真题)
- 2026福建漳州台商投资区资产运营集团有限公司招聘备考题库含答案详解(培优)
- 2026宁波甬开产城运营管理有限公司招聘1人备考题库及一套参考答案详解
- 2026吉林省气象部门事业单位招聘应届毕业生12人备考题库(二)含答案详解(突破训练)
- 计算机导论第2版微课视频版吕云翔课后参考答案
- 2024年陕西榆能化学材料公司招聘笔试参考题库含答案解析
- 妇科诊疗常规
- 警惕病从口入-课件
- 各大名校考博真题及答案心内科部分
- 脑疝、重症患者脑保护及颅内压监测
- 踝足部解剖和功能培训课件
- 小学科学精品课件【1.4《设计塔台模型》课件】
- GB/T 23901.2-2019无损检测射线照相检测图像质量第2部分:阶梯孔型像质计像质值的测定
- GB/T 19812.3-2017塑料节水灌溉器材第3部分:内镶式滴灌管及滴灌带
- GB/T 11363-2008钎焊接头强度试验方法
评论
0/150
提交评论